PICOTE Mini Coating Pump Setup guide

Picote Soluons Oy Ltd www.picoteinstute.com
MINI CLEANER
MINI MILLER 8/16 | MINI MILLER +C 8/16
MINI CLEANER
MINI MILLER 8/16 | MINI MILLER +C 8/16
MINI COATING PUMP
OPERATION, SAFETY & INSTALLATION MANUAL
This operaons manual is for the Picote Brush Coang ™ System using the Mini Coang Pump and covers the
equipment as well as the applicaon process including the DC1000E 100% Solids Epoxy and Fast Cure Resins.
These instrucons are for your personal safety. Always ensure that you have
read and understood these instrucons before using the Picote Brush Coang ™
System.
DC1000E Resin Cercaons

Picote Soluons Oy Ltd 2www.picoteinstute.com
TOPIC PAGE
Safety Informaon 3
General Machine Safety Informaon 4
Environmental, Transport, Storage & Disposal 5
CE Declaraon of Conformity 6
WRc, ASTM & NSF 61-5 Approvals & Cercaons 6
Picote Mini Coang Pump 7
Intended Use 8
Picote Millers 9
Required Parts 11
Preparing the Original Pipe for Coang 13
Coang System Assembly: The Pump 15
Coang System Assembly: The Brushes 21
Coang System Assembly: Delivery Hose & Camera 24
Preparing the Resin 28
Operang the Coang System 32
Cleaning up the Coang System 37
Curing & Addional Coats 42
Picote Epoxy Resin Informaon 43
Maintenance 44
Troubleshoong Flowchart 46
Troubleshoong Fault Codes List 47
Warranty Policy & Procedure 48
Training & Cercaon 49
To watch praccal demonstraon videos, take a course, or to download an electronic copy of these Instrucons, please visit
www.picoteinstute.com. Please note that videos and courses are not intended as a replacement or alternave to this operang
and safety manual, but only as an addional learning tool.
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
TABLE OF CONTENTS

Picote Soluons Oy Ltd 3www.picoteinstute.com
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
SAFETY INFORMATION
This secon contains important safety informaon. Failure
to comply could result in serious injury.
3
Personal Protecve Equipment (PPE)
Always use Personal Protecve Equipment including suitable protecve clothing, footwear, plus:
Suitable eye protecon to protect against sewage, chemicals or dust from irritang
eyes.
Suitable ear protecon to protect against hearing loss.
Suitable heat and cut-resistant gloves to help prevent any hand injuries. Any open
injuries or skin irritaons should always be covered to avoid contact with sewage,
chemicals or dust.
Suitable respirator to prevent any dust or fumes being inhaled or consumed, which
could cause occupaonal asthma or dermas.
Safety Symbols
Safety symbols are used throughout this manual to draw aenon to potenal hazards.
Danger risk of serious injury or death by electrocuon, follow instrucons.
Danger risk of serious injury, follow instrucons.
Danger risk of serious injury from rotang parts, follow instrucons.
Danger risk of serious injury from hot parts, follow instrucons.
Danger do not touch. Risk of injury, follow instrucons.

Picote Soluons Oy Ltd 4www.picoteinstute.com
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
GENERAL MACHINE SAFETY INFORMATION
1. Always wear eye and ear protecon as well as heat and cut-
resistant gloves.
Other personal protecve equipment, such as dust mask, gloves and
overalls should be worn when necessary. Dust produced when working
can be dangerous to your health, inammable or explosive. Always wear appropriate personal protecve
equipment.
2. Make sure the pipe has been opened and venlated to prevent any gases accumulang.
3. Always ensure that the machine is fully turned o and unplugged before inspecon, maintenance, or installing any
accessories to the machine. Always follow the instrucons in the manufacturer’s manual.
4. Before each use inspect the machine carefully for any potenal break or damage. Change damaged parts
immediately. It is especially important to check the end of the sha for any signs of wear and tear, and repeat the
process for the outer casing.
5. When in use, it is very important that the machine is stable and on an even surface at all mes.
6. Never leave the machine running unaended. Always hold the cable when operang the machine.
7. Do not touch the Cuer or Grinding Chains immediately aer use, they may be hot and could burn your skin.
8. If the working environment is extremely hot and humid, or badly polluted by conducve dust, use a GFCI-enabled
power outlet to ensure the safety of the operator.
9. Make sure that the job locaon is well venlated before grinding or drilling. Always use a vacuum extracon
system in the pipe to remove dust. The operator must wear a dust mask when using dry grinding to clean pipes.
10. Ensure that the venlaon openings are kept clear when working in dusty condions. If it should become neces-
sary to clear dust, rst unplug the machine. Avoid damaging internal parts.
11. Do not use the machine on any pipes containing asbestos bres.
12. Never touch rotang parts. Do not stand on the machine.
13. Only use this machine with the accessories and spare parts oered by the Picote Soluons. Accessories and spare
parts should only be used in the manner intended and as described by Picote Soluons.
14. Only operate the foot pedal or OPC as instructed. Never place anything on it in place of a foot.
15. Do not extend the sha by more than one extension. Use only Picote Soluons sha extension and connector.
Always read all safety warnings and instrucons. Failure to follow warnings and instrucons may result in electric
shock, re and/or serious injury. For resin please download the MSDS Sheets from the Picote Instute.
This secon contains important safety informaon. Failure to comply could result in serious injury or death.

Picote Soluons Oy Ltd 5www.picoteinstute.com
TRANSPORT
Always remove the Smart Mixer from the Mini Coang Pump and then remove the Mini Coang Pump from
the Miller for transport. Mini Coang Pump should be transported in a car or other vehicle and laid down and
secured with ratchet straps to prevent any sudden movements or accidents caused by hard braking or accident.
Never transport the Miller with tool aached to the sha. On +C models, always retract the camera back to
it’s housing during transport. If using a pick-up or trailer to transport Picote Millers or Mini Coang Pump
always use a suitable cover on the unit to protect it from the elements
STORAGE
It is recommended that the Mini Coang Pump and Picote Millers be stored indoors to protect them from rain
and sunlight, and also in a constant ambient temperature. The best way to store the machines is using the
same box that the machine has been shipped in.
If the Mini Coang Pump or Picote Miller has been stored in an environment colder than +10 oC or 50 oF , the
machine should be stood at room temperature for 24 hours before use.
If the Mini Coang Pump or Picote Miller has been stored for long periods of me (over 2-3 months), it should
be checked and tested according to the maintenance programme before use.
DISPOSAL
Mini Coang Pump pump, electric wires and power supply can be disposed in Europe at Waste Electrical and
Electronic Equipment (WEEE) collecon points.
The Mini Coang Pump frame can be recycled in metal waste collecon points. Pump Housing, Delivery and
Supply Hoses can be disposed of as plasc waste.
Dispose of unused Resin by mixing the product in a well venlated locaon using a non-ammable container.
The mixed product will generate heat while hardening. Follow the MSDS which can be found on the Picote
Instute.
Always follow local waste handling rules and regulaons.
Picote 100% Solids Epoxy Resin and Fast Cure Resin:
Refer to MSDS for Environment , Transport, Disposal and Storage, available from Picote Instute
ENVIRONMENTAL
Operaonal Ambient Temperature Range: -10 oC to 50 oC (14 oF to 122 oF) frost and condensaon free
Storage Ambient Temperature Range: -20 oC to 60 oC (-4 oF to 140 oF) frost and condensaon free
Maximum Altude: 2000m or 6500 . Derate above 1000m or 3280: 1% / 100m or 328
Maximum Humidity: 95% non-condensing
This secon contains important safety informaon. Failure to comply could result in serious injury or death
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
ENVIRONMENT, TRANSPORT, STORAGE & DISPOSAL

Picote Soluons Oy Ltd 6www.picoteinstute.com
We Picote Soluons Oy Ltd as the responsible manufacturer, declare that the following Picote Soluons Oy Ltd
machine:
Mini Coang Pump
is of series producon and
Conforms to the following EU Direcve:
2006/42/EY
And is manufactured in accordance with the following standards or standardised documents:
EN 809 + A1/AC, EN 60204-1:2018
The technical documentaon is kept by our authorised representave in Europe who is:
Picote Soluons Oy Ltd, Pienteollisuuse 24
06450 Porvoo, Finland
1st January 2018
Katja Lindy-Wilkinson
C.E.O.
Picote Soluons Oy Ltd
Pienteollisuuse 24, 06450 Porvoo, Finland
Picote Brush Coang SystemTM has been
granted with WRc Approved Cercate
for non-potable and waste water
applicaon for pipe diameters DN32
(11/4”) to DN300 (12”).
Cercate Number: PT/431/0918
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
CE DECLARATION OF CONFORMITY
Approvals & Cercaons
ASTM approval of Picote DC1000E 100%
Solids Epoxy when used to create a
monolythic semi-structural repair of decayed
and damaged pipelines. Designed exclusively
for the Picote Brush Coang™System.
NSF 61.5 ceres that the white DC1000E
Picote 100% Solids Epoxy can be ulised for
potable water lines over DN100 / 4" diameter.

Picote Soluons Oy Ltd 7www.picoteinstute.com
5
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
PICOTE MINI COATING PUMP
7
Power Cord
Resin Supply Hose
Delivery Hose
Motor
Resin Cup Locaon
Speed Control
Reverse/Forward
On/O Buon
Release, locks pump to Miller
Locking Operator Control Buon (LOC)
Smart Mixer Plaorm
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
General Descripon
1
2
3
4
5
6
7
8
9
10
11
1

Picote Soluons Oy Ltd 8www.picoteinstute.com
Intended Use
This machine is intended for the following uses:
1. Coang pipes from DN32-DN150 / 1.1/4’’- 6’’
2. Cleaning sewers and drains with a degreaser.
Always follow the manufacturer’s instrucons when installing and using the machine with accessories.
5
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
PICOTE MINI COATING PUMP cont.
Ensure that the supply voltage is correct. The voltage of the power
source must match the value given on the nameplate of the machine.
Available in 230v and 110v.
The machine should only be connected to a power supply of the same
voltage as indicated on the nameplate, and can only be operated on
single-phase AC supply.
This machine has a hand-held Locking Operator Control buon or
“LOC”. When the control buon is pushed the pump is engaged and will
operate unl depressed.
Voltage
Power Supply
SIZE HOSE RANGE ROTATING SPEED OUTPUT (kw) POWER SOURCE WEIGHT
41x42x54.4 cm 8/10mm Max 22m Depends on pipe diameter 0.18 110v or 230v 16kg
16.2.2x16.5x21.5’’ Max 75 35.5 lb

Picote Soluons Oy Ltd 9www.picoteinstute.com
WARNING
!
Please refer to the Mini Miller manual
for more informaon
1
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
Note: Mini Coang Pump can also be used with the
Mini Cleaner, Baery Mini Cleaner, Mini Cleaner +C,
Baery Mini Cleaner +C, Mini Miller +C, Baery Mini
Miller and Baery Mini Miller +C.
PICOTE MILLERS | 8mm (1/3”) Sha
General Descripon
Sha Reel
Frame
Flexible Sha
Motor & Bevel Gear (not shown)
Emergency Stop Boom (red)
Power Switch
Speed Control
Foot Pedal—Operator Presence Control
Hand Guard & Strain Relief/inside Hand
Guard (not seen in photo)
1.
2.
3.
4.
5.
6.
7.
8.
9.
Intended Use
This machine is intended for the following uses:
• Coang pipes from DN32-DN150 / 1.1/4’’- 6’’
• Cleaning and unblocking pipes, drains and sewers
by grinding.
• Descaling pipes.
• Reinstang branches in sewers and drains by
drilling and grinding.
• Cung excess length of cured linings.
Always follow the manufacture’s instrucons when
installing and using the machine with accessories.
1
2
3
4
5
6
9
8
7

Picote Soluons Oy Ltd 10 www.picoteinstute.com
Please refer to the correct Miller
manual for more informaon
MINI MILLER 8/16
SIZE SHAFT RANGE ROTATING SPEED OUTPUT (kW) POWER SOURCE WEIGHT IP CLASS
752x519x389 8mm 16m 500-2900rpm 110V:1.1kW 110v or 230v 27kg
29.6x20x15.3’’ 1/3’’ 50 230V:1.2kW 59.5lb
When is use, always lay the machine down horizontally on the oor as shown above. When not in use,
some non-hazardous Picote Flexible Sha Lubricant might leak from the hand guard.
VOLTAGE
Ensure that the supply voltage is correct.
The voltage of the power source must
match the value given on the nameplate of
the machine.
FOOT PEDAL
The machine has an Operator Presence
Control or ‘OPC’. When the control is no-
held down, the machine stops.
POWER SUPPLY
The machine should be connected only to a power
supply of the same voltage as indicated on the
nameplate, and can only be operated on single-
phase AC supply.
EMERGENCY STOP
There is an Emergency Stop Buon on the
machine. The power supply to the motor is cut o
when the Emergency Stop Buon is pushed.
Always make sure the Emergency stop Buon is
pressed and completely unplug the machine when
the machine accessories (e.g. Cuer or Grinding
Mini Coang Pumps have been pre-set by the manufacturer
Picote Soluons accepts no liability for failures or accidents caused by tampering with or
changing of the manufacturer sengs. The control box has been pre-programmed and
requires no addional adjustments.
Opening the box or changing the factory sengs may cause damage and will void the warranty!
WARNING
!
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
PICOTE MILLERS | 8mm (1/3”) Sha cont.
MINI CLEANER 8/16
SIZE SHAFT RANGE ROTATING SPEED OUTPUT (kW) POWER SOURCE WEIGHT IP CLASS
1122x712x466 8mm 16m 500-1500rpm 110V:1.5kW 110v or 230v 26.5kg
44x28x18” 1/3” 50 230V:1.5kW 152lb
Note: Mini Coang Pump can also be used with the
Baery Mini Cleaner, Mini Cleaner +C, Baery Mini
Cleaner +C, Mini Miller +C , Baery Mini Miller and
Baery Mini Miller +C.

Picote Soluons Oy Ltd 11 www.picoteinstute.com
First make sure you have all of the required parts!
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
REQUIRED PARTS
PRODUCT NAME
PRODUCT NUMBER
DESCRIPTION
INFORMATION
1. MINI MILLER COATING
PUMP
2220100001
2220100002
Mini Miller Coang Pump
EU 230v
Mini Miller Coang Pump UK,
US 110v
Hoses, brushes & other parts
sold separately
2. MINI MILLER
3540000817
354000817UK
3540000817US
Mini Miller 230v, 16m range
Mini Miller 110v, 16m range
Mini Miller 110v, 50 range
8mm / ⅓’’ Sha
3. HOSES & SHAFT 2220100004 Resin Supply Hose Supplied in 25m/82 lengths.
Colour-Red
2220100011
Pre cut Resin Supply Hose
Supplied in pre cut lengths.
Colour-Red
2220100003
Resin Delivery Hose
Supplied in 25m/82 lengths.
Colour-Black
1312030085017
Mini Miller spare sha, 8mm
with thick outer casing
17.5 metres /57.4
9123050001
Sha connector
Necessary if aaching a sha
extension
2220100007
Hose Connector with two hose
clamps (11 & 13mm)
93212321085
Sleeve 2 Plasc for 8mm thick
casing

Picote Soluons Oy Ltd 12 www.picoteinstute.com
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
REQUIRED PARTS cont.
PRODUCT NAME
PRODUCT #
DESCRIPTION
INFORMATION
4. COATING BRUSHES & BRUSH STOPPER 2120000050 50mm 2” for DN32 1.25” pipe 8mm/ ⅓’’ sha
2120000075 75mm 3” for DN50 2” pipe 8mm/ ⅓’’ sha
2120000100 100mm 4” for DN75 3” pipe 8mm/ ⅓’’ sha
2120000125 125mm 5” for DN100 4” pipe 8mm/ ⅓’’ sha
2120000175 175mm 6.⅞” for DN150 6” pipe 8mm/ ⅓’’ sha
2120000220 220mm 8.⅝” for DN200 8” pipe 8mm/ ⅓’’ sha
900000338 Brush Stopper 8mm Extra stopper to secure brush
5. PICOTE 100% SOLIDS EPOXY 2110001001 Picote Dual Color Resin Kit,
5.58kg / 12lbs
6 Cartridge Kit (3 White, 3
Dark Grey) with 8 Tips & 3
Nuts.
2110001006 Picote Grey Resin Kit,
5.58kg/12lbs
6 Grey Cartridges with 8 Tips &
3 Nuts
2110001005 Picote White Resin Kit,
5.58kg/12lbs 6 White Cartridges with 8 Tips
& 3 Nuts
2110001003 Delivery Hose Lube 1 QT /
946ml Special Lubricant to reduce
fricon
2220200004 Coang Resin Cup, 10pcs
6. PICOTE SMART MIXER 2130001001 Picote Smart Mixer Baery powered epoxy mixer.
Please see the Smart Mixer
operang manual for more
informaon.
2130000002 Nut (pack of 10)
2130000001 Tip (pack of 10)
7. DRAIN CAMERA Use your own mini CCTV cam-
era system
larger cameras will cause is-
sues with weight and naviga-
on through bends
8. OTHER ITEMS Resin Cups Duct Tape Be sure you have plenty of
rags for the clean-up process.
Acetone Rags & Bucket with Lid
Nitrile Gloves Razor Knife
Spare Hose
Clamps
7mm Nut Driver
for Hose Clamps
Scissors 3, 5, 6mm Hex Key
for Scews

Picote Soluons Oy Ltd 13 www.picoteinstute.com
Substrate preparaon is one of the most crucial steps in the coang process as specialized coang resin is
designed to bond to the host pipe. Be sure to remove all scale, grease, dust, standing water and any other
debris completely from the pipe before coang. If coang plasc pipe be sure to thoroughly abrade with
Picote Smart CuerTM grinding panels.
WARNING
!
STEP 1 Clean the host pipe very well. Use Original (a) or Cyclone (b) grinding chains with carbides
for cast iron pipes and ush with water. For PVC pipes, use the special PVC chains (c). Use
a wire brush (d) to remove nal dust and other remaining parcles.
OPTIONAL STEP: For pipe with excessive build-up of fats, oils or grease (FOG) a degreaser may
be necessary. This can be pumped into the pipe during cleaning if necessary using the coang
pump system and Eco-friendly degreasing agent.
A. B.
C. D.
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
PREPARING THE ORIGINAL PIPE FOR CLEANING

Picote Soluons Oy Ltd 14 www.picoteinstute.com
STEP 2
STEP 3
When necessary, run the Smart Cuer™ with side grinding
panels through the pipe to create a rough surface and to
allow for the resin to have the best possible bond to the
pipe wall.
The pipe MUST be dry before connuing with the coang setup. Use the Picote
Heater to expedite the process.
Once the original pipe is completely clean, move on to
the Coating System Assembly
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
PREPARING THE ORIGINAL PIPE FOR CLEANING cont.

Picote Soluons Oy Ltd 15 www.picoteinstute.com
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
COATING SYSTEM ASSEMBLY — THE PUMP
Required Tools & Parts
Mini Coang Pump
Nut Driver 7mm
Picote Hose Lube
Resin Cup
Delivery Hose (black)
Resin Supply Hose (red)
Hose Clamps 11mm & 13mm
Scissors
Tubing Cuers
Hex Keys
Silicone Grease
Hose Connectors
Towels
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
COATING SYSTEM ASSEMBLY| THE PUMP
BEFORE BEGINNING ASSEMBLY
DANGER
Risk of serious injury from rotating parts!
• Have plenty of disposable nitrile gloves and towels available. Wearing a double layer of
disposable gloves is useful when applying lubricant.
• Be sure that all machines have the required power supply.
• Test machines and power source to ensure adequate and safe operaon. Read Machine Operang Manual.

Picote Soluons Oy Ltd 16 www.picoteinstute.com
STEP 1
STEP 2
STEP 3
Cut the Resin Pump Supply Hose in between 248mm (9.¾”) or use pre-cut
lengths. Ensure the ends are squared.
Prepare the Hose Connectors and Hose Clamps to be inserted into Resin Supply Hose.
There are 2 small hose clamps for black hose (10mm) and 2 larger hose clamps for
red hose (13mm).
Insert hose connectors and rotate notched surface up while following the natural
curve of the hose. Ensure hose clamps are facing outward and inward. Once posioned
properly ghten the hose clamps. This is important when installing into the pump
housing.
248mm / 9.¾”
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
COATING SYSTEM ASSEMBLY | THE PUMP cont.
15

Picote Soluons Oy Ltd 17 www.picoteinstute.com
STEP 4
STEP 5
STEP 6
With hose clamps facing outward, insert the connector into boom of the housing
key-way.
Push hose into housing and slowly rotate the pump rotor clockwise manually while
feeding the hose into place. Tip! Silicone grease will make the process easier.
Slide second connector into the top key-way.
Note: light pressure will be needed to pull the top connector into the key-way.
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
COATING SYSTEM ASSEMBLY | THE PUMP cont.

Picote Soluons Oy Ltd 18 www.picoteinstute.com
STEP 7 Ensure hose clamps are facing inward and outward for easy access if required.
STEP 8 Apply a small amount of a silicone grease to the underside of the hose at the
boom of the housing. This allows the hose to always return to the centre aer
the rollers pass over it.
STEP 9 Close housing door to secure connectors. The Pump door should remain closed
at all mes during the coang process!
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
COATING SYSTEM ASSEMBLY | THE PUMP cont.
17

Picote Soluons Oy Ltd 19 www.picoteinstute.com
STEP 12
STEP 11 Cut a 1.2m or 47” piece of the black Delivery Hose to be used as a supply hose
extension. One end will require a 45 degree angle and the other should be a square
cut.
Aach the square end of the hose to the top hose connector on pump using a small
hose clamp.
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
COATING SYSTEM ASSEMBLY | THE PUMP cont.
STEP 10 Once the pump hose has been installed, turn on the pump and check that it is
working correctly by rstly covering the top hose ng with your nger. If working
correctly you should feel the hose sucking onto your nger. Next place your nger
over the boom hose ng. If working correctly you should feel air blowing over
your nger.

Picote Soluons Oy Ltd 20 www.picoteinstute.com
STEP 13 Take the 45 degree end and place in the resin cup at the back of the pump. Run the
hose through the retaining holes on the back of the pump.
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
COATING SYSTEM ASSEMBLY | THE PUMP cont.
This manual suits for next models
2
Table of contents
Other PICOTE Water Pump manuals
Popular Water Pump manuals by other brands

Affetti Pumps
Affetti Pumps CGV-L user manual

Ingersoll-Rand
Ingersoll-Rand ARO PF20R B Series Operator's manual

superior pump
superior pump 91025 owner's manual

Geotech
Geotech Guzzler Installation and operation manual

Pentair
Pentair Aurora 3341 INSTRUCTION, INSTALLATION, MAINTENANCE AND REPAIR MANUAL

Fresenius Kabi
Fresenius Kabi Agilia VP Instructions for use