
Parts List:
K- SCREWS (4 PCS)
G- 4 X FEET
PREPPING THE PIPE
VERY IMPORTANT: These are all authentic malleable iron
and require necessary cleaning and prepping; do not skip
this step.
1. Clean and dry all the parts with gentle soap.
2. Use a lint-free rag to apply metal polish to the parts.
3. Use metal polish or clear coat paint to seal the dry pipe.
RECOMMENDED
DRILL WITH 1/4” BIT
FOR WALL ANCHOR
RECOMMENDED TOOLS
This is industrial grade authentic pipe. It comes covered in anti-rust
oil. They are dirty to the touch but can be cleaned and sealed to
prevent rust and be clean to the touch. See Clean and Seal sheet for
ways to clean and seal the pipe.
1. Connect 10” pipe (C) to Street Elbows (B) and Elbows (D)
2. Use Threadlocker on the threads of Street Elbows (B) and 5-way(A).
USE THREAD LOCKER TO SECURE LEGS IN STRAIGHT DOWN POSITION
3. Connect Feet (G) to 1” connector (F) to Elbow (D) to 3“ Pipe (E).
4. Connect finished feet to Elbow (D).
5. Repeat 3-4 for other legs.
6. Connect 4.5” pipe (H) to 5-Way (A) and Flange (I)
7. Screw Flange into table top with screws (K)
See back page for more instructions.
Feet may scratch a hardwood floor and pads are recommended.
COAT WITH
THREADLOCKER A- 1 X FIVE WAY
B- 4 X STREET ELBOWS
C- 4 X 10” PIPE
D- 8 X ELBOWS
E- 4 X 3” PIPE
F- 4 X 1” CONNECTOR
H- 1 X 4.5” PIPE
I- 1 X FLANGES (3” OD)
10” PIPE
4.5” PIPE
3” PIPE
1”
CONNECTOR
365 ET20
THANK YOU SO MUCH FOR PURCHASING A PIPE DECOR PRODUCT. IF YOU HAVE ANY TROUBLE PUTTING YOUR KIT
TOGETHE
R
OR
MISSING
PIECE
S
PLE
A
SE
CONT
AC
T
[email protected] F
OR
ANY
HELP
AND
RETURNS.