! !
WARNING
A hammer or mallet may be needed during assembly.
Figure1
Figure 3 Figure 4
Figure2
U6
U4
U3
U4assembled
U1
U2
A
U3
Playing
Court
Front side
Back
side
Place the Pole on the Anchor system.
Slide one Thick washer M16 (U3) over
each J-bolt (U2). Lift the Pole (A) onto
Anchor system, secure with one thick
washer (U3), one Lock washer M16 (U6)
and one Hex nut (U4) for each J-bolt.
See Figure 1.
If the Main Post (A) is not exactly
vertical, adjust the 16mm J-Bolt Hex
Nuts (U4) located under the Post base
(A). Tighten all of the Hex Nuts (U4)
Above Post base when Main Post (A) is
vertical.
NOTE: Face the Main Post (A) with Actuator
Bracket facing away from playing court (as
shown in ).FIGURE 2
1.
Attach Lower Extension arm (E) to
Pole (A), Figure 3as shown in .
Secure it with one Hex bolt M12x270
(#1), two Flat washers M12 (#7),four
Plastic Washers M12 (#8), one Lock
nut M12 6 See(# ). Figure 7.
Note make sure Plastic washers go:
between Lower Extension and Pole.
2.
A
Slide Plastic sleeve
over Actuator
5
1
78
8
E
6
7
8
1
8
8
8
7
76
J
5
5
7
7
7
8
8
3D
88
6