PureStorage FlashBlade//S User manual

FlashBlade//S Quick Installation Guide
Before You Begin
Verify the front and rear of the rack mounting posts are
between 61.0 cm (24 in.) and 91.5 cm (36 in.) with 5 RU (22.3
cm/8.75 in.) of contiguous vertical space available for the
chassis.
The recommended clearance for the front (cold aisle) is 91.5
cm (36 in.). The minimum is 81.5 cm (32 in.).
The recommended clearance for the rear (hot aisle) is 91.5
cm (36 in.). The minimum is 81.5 cm (32 in.).
No special clearance is required on top, bottom, or sides of
the rack.
Document Conventions
Symbol Meaning
Potential for injury, physical damage, or loss of
data or array configuration information
Best practice
Tip
Instruction
Contacting Customer Support
For assistance, contact Pure Storage Technical Services.
You can reach support the following ways:
lVisit https://www.purestorage.com/support
lEmail support@purestorage.com
lCall (800) 379-7873 in the U.S. For international sup-
port, see https://www.purestorage.com/support
Support is available 24 hours, 7 days a week.
Preparing for Installation
Install the equipment in a restricted access location.
Set up a local console (serial-port monitor and USB key-
board or a computer with terminal emulation) for con-
figuring or troubleshooting the software installation.
Verify the installation location meets the electrical power
requirements. FlashBlade//S requires four C20,
20A/250V power outlets.
Install any additional blades, DFMs, and DFM blanks
after mounting the chassis to reduce weight. The
FlashBlade//S with 7 blades and 3 blanks without DFMs
weighs 80 kg (176 lb). Use a mechanical lift or 4 or more
people to lift the chassis.
Make sure the rack can support the weight of all installed
equipment, including cables, bezel, and rails—approx-
imately 100 kg (220 lb) for each FlashBlade//S chassis—
and the weight is within the floor loading limit.
Save all provided tools, cartons, and packing material in
case return shipment to Pure Storage is necessary.
Prior to unpacking, inspect packages for shipping dam-
age. If there is damage, photograph it and contact Pure
Storage Technical Services before proceeding.
Have all necessary cables available.
Mount the chassis to the rack within 3 m (9.85 ft.) of the
network connection switches or panels.
Verify the installation environment:
lIs within the operating temperature range of 5°C-35°C
when the rack is fully populated.
lDoes not have airflow ducts aimed directly at any
chassis.
The installation shall require all of the following:
lThe building installation shall provide a means for con-
necting to protective earth, and
lThe equipment is to be connected to that means, and
lA service person shall check the socket-outlets provid-
ing power to the equipment, provide a connection to
the building protective earth. If not, the service person
shall arrange the installation of a protective earthing
conductor from a separate protective earthing terminal
to the protective earth wire in the building.
1. Unpack the FlashBlade//S Components
Remove the overpack box and verify the FlashBlade//S package contains the items shown in Figure 1.
Figure 1. Unpacking FlashBlade//S Components
PN: 40-0284-00 Page 1 of 5

2. Install the Rails
The chassis includes two rails, labeled right and left. The
rails have locating pins (for square- and round-hole
racks) or positioning studs (visible if you unscrew and
remove the locating pins for threaded-hole racks) that
align with the holes in the rack.
1. (Square-hole racks only) Install the #10-32 cage
nuts (included in Rail Kit) on the back side of the
front rack post, as shown in Figure 2. The cage nut
insertion tool is not provided.
For round-hole racks, use clip nuts (not provided)
instead of cage nuts.
2. Install one of the two rails (the installation order does
not matter) by pulling the spring-loaded lever back
and inserting the locating pins or positioning studs in
the front mounting post at the desired height.
Release the lever once the rail is in place. See Fig-
ure 3.
3. Extend the rear of the rail until the locating pins or
positioning studs reach the rear mounting post, and
press the rail into the rear post until the latch
engages. See Figure 4 (left rail shown).
4. (All rack types) Secure the rear of each rail to the
rack with the screws provided in the Rail Kit. One
screw is provided for the rear of each rail. Use the
second or fifth hole up from the bottom of each rail
(shown going into the fifth hole). See Figure 4.
5. Repeat the previous steps to install the second rail.
Make sure to install the rear of each rail into the post
holes that are at the same height as the holes being
used on the front post. Otherwise, the chassis might
slide off the rails causing personal injury and dam-
age to the chassis.
Figure 2. Installing Cage Nuts
Figure 3. Installing a Rail (Front Post)
Figure 4. Installing a Rail (Rear Post)
3. Mount the Chassis into the Rack
Remove the clear protective film on the top sur-
face of the chassis before installing into the
rack.
To avoid injury or damage to the system, do
not insert hands or fingers into the empty drive
bays.
1. Use a mechanical lift to raise the chassis to the
desired height in the rack.
2. Set the rear of the chassis onto the rails and
remove the rear handles while using the mech-
anical lift to support the front of the chassis.
To remove a handle, pull the plunger and slide
it downward. See Figure 5.
3. Continue to slide the chassis into the rack until
you have a two-inch gap between the middle
handles and the rack.
Remove the middle handles while using the
mechanical lift to support the front of the
chassis. See Figure 6.
Figure 5. Mounting to Rack (Part 1)
Figure 6. Mounting to Rack (Part 2)
FlashBlade//S Quick Installation Guide
PN: 40-0284-00 Page 2 of 5 March 25, 2022

3. Mount the Chassis into the Rack (Cont'd)
4. Continue to slide the chassis into the rack until
you have a two-inch gap between the front
handles and the rack.
Remove the front handles while using the
mechanical lift to support the front of the
chassis. See Figure 7.
5. Slide the chassis completely into the rack and
verify the chassis ears are flush with the front
of the rack.
6. Secure the chassis ears to the front of the rack
post with the two screws provided in the Rail
Kit.
Open the slam-latches on the chassis front
panel and thread the screw through each
slam-latch hole that lines up with the cage nuts
previously installed in the rack posts.
Use the supplied Phillips screw driver to
tighten the screws. See Figure 8.
7. Close the slam-latches.
Figure 7. Mounting to Rack (Part 3)
Figure 8. Mounting to Rack (Part 4)
4. Install Additional Blades (if Applicable)
A minimum of seven blades must remain installed in the
chassis.
Save all removable blade blanks.
Locate the boxes with blades and prepare for installation.
The blades must be installed in sequential order from left to
right.
1. Remove the blade blanks from the chassis.
Loosen the thumbscrew, fully open the ejector handle, and
pull to remove the blade blank from the slot.
2. Prepare the additional blade.
Loosen the thumb screw on the ejector handle of the addi-
tional blade.
3. Pull the ejector handle fully open before inserting the blade
into the chassis. See Figure 9.
4. Align the blade with the appropriate chassis slot key and
insert the blade into the chassis. See Figure 10.
5. Push the ejector handle upwards to fully engage the blade
into the chassis.
6. Tighten the thumb screw to secure the handle.
7. Repeat the previous steps for additional blades.
8. Use the Phillips screw driver to lock each blade into its
chassis slot.
Figure 9. Disengage the Ejector Handle
Figure 10. Inserting the Blade
FlashBlade//S Quick Installation Guide
PN: 40-0284-00 Page 3 of 5 March 25, 2022

5. Install DirectFlash Modules
DirectFlash Modules (DFM) must be installed into the slot in sequen-
tial order (1-2-3-4). Each blade must have the same number of DFMs
installed. See Figure 11.
Locate the boxes with DFMs and prepare for installation.
Make sure all unused slots are filled with blanks.
Working with one DFM box at a time:
1. Open the front latch on the drive fully, then slide the DFM into the slot
and close the latch as you seat the module. See Figure 12.
2. Continue populating the remaining slots with the DFMs in the box, 1
per blade.
3. Make sure the drive module front panels are flush with the chassis
front panel. Check the latch on each module is engaged by pulling
gently on it until you feel resistance.
4. Repeat the previous steps for the remaining boxes of DFMs.
5. Install drive blanks in any unused drive slots to ensure adequate air-
flow. The drive blanks do not have a latching mechanism.
6. (Optional) Use the Torx T10 screw driver included in the Accessory
Kit box to lock each DFM into its blade slot.
Figure 11. DFM Slot Numbers
Figure 12. Inserting the DFM
6. Power on the System
1. Connect power cords to the chassis power supply units
(PSU) starting with PSU1 and proceeding through PSU4.
See Figure 13.
lLift the power supply handle, make a loop in the
power cord nearest to the plug, wrap the captive
strap around the loop, and secure the cord to the
handle. See Figure 14.
lInsert the power plug into the power supply socket.
Secure the power cords to the power supply handles with
captive straps to prevent accidental disconnections.
2. Connect the PSU1 and PSU2 power cords to an AC
power distribution unit. After connecting the power, the
Fabric I/O Module (FIOM) LEDs illuminate and the fans
begin to spin up.
3. Connect the PSU3 and PSU4 power cords to a separate
AC power distribution unit for redundancy.
4. Check the status of each PSU after connecting all the
power cords. See Figure 15 and Table 1 for LED status
information.
Table 1. Power Supply Unit Status LED
LED Status Description
PSU status (on each PSU) Green if OK. Amber
if faulty.
Figure 13. Connecting Power Cords
Figure 14. Securing the Cord
Figure 15. PSU Status LED
FlashBlade//S Quick Installation Guide
PN: 40-0284-00 Page 4 of 5 March 25, 2022

7. Connect the Cables
For more information about setup, go to https://support.purestorage.com.
1. Connect a USB-to-Serial cable to FIOM 1 CONSOLE (IOIOI) port to start the initial setup process. See Figure 16.
2. Connect an Ethernet cable from FIOM 1 MANAGEMENT (MGMT) port to the customer's administrative network.
3. Connect the customer's equipment to the FlashBlade//S as instructed by the customer, using only ports 1 through 4.
The remaining ports 5 through 8 are reserved.
4. Secure all cables.
Figure 16. FlashBlade//S FIOM Ports
8. Install the Bezel
1. Remove the bezel from the protective package.
2. Remove the protective film from the front surface of the bezel.
3. Align the bezel with the associated features on the chassis ears and press into place. See Figure 17.
Figure 17. Installing the Bezel
© 2022 Pure Storage® (“Pure”), Portworx® and its associated trademarks can be found here and its virtual patent marking program can be found here. Third party names
may be trademarks of their respective owners.
The Pure Storage products described in this documentation are distributed under a license agreement restricting the use, copying, distribution, and decompilation/reverse
engineering of the products. The Pure Storage products described in this documentation may only be used in accordance with the terms of the license agreement. No part of
this documentation may be reproduced in any form by any means without prior written authorization from Pure Storage, Inc. and its licensors, if any. Pure Storage may make
improvements and/or changes in the Pure Storage products and/or the programs described in this documentation at any time without notice.
THIS DOCUMENTATION IS PROVIDED "AS IS" AND ALL EXPRESS OR IMPLIED CONDITIONS, REPRESENTATIONS AND WARRANTIES, INCLUDING ANY
IMPLIED WARRANTY OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR NONINFRINGEMENT, ARE DISCLAIMED, EXCEPT TO THE
EXTENT THAT SUCH DISCLAIMERS ARE HELD TO BE LEGALLY INVALID. PURE STORAGE SHALL NOT BE LIABLE FOR INCIDENTAL OR CONSEQUENTIAL
DAMAGES IN CONNECTION WITH THE FURNISHING, PERFORMANCE, OR USE OF THIS DOCUMENTATION. THE INFORMATION CONTAINED IN THIS
DOCUMENTATION IS SUBJECT TO CHANGE WITHOUT NOTICE.
Pure Storage, Inc., 650 Castro Street, Suite 260, Mountain View, CA 94041.
https://www.purestorage.com
Direct comments to DocumentFeedback@purestorage.com.
FlashBlade//S Quick Installation Guide
PN: 40-0284-00 Page 5 of 5 March 25, 2022
Table of contents
Other PureStorage Storage manuals