manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Reborn
  6. •
  7. Boating Equipment
  8. •
  9. Reborn Launch Wakeboard Tower Polished User manual

Reborn Launch Wakeboard Tower Polished User manual

Popular Boating Equipment manuals by other brands

SureShade RTX Installation instructions manual

SureShade

SureShade RTX Installation instructions manual

Ideal Windlass CWM Installation, operation & maintenance instructions

Ideal Windlass

Ideal Windlass CWM Installation, operation & maintenance instructions

Access BIMINI Assembly instructions

Access

Access BIMINI Assembly instructions

Floe VSD 6000 Assembly instructions

Floe

Floe VSD 6000 Assembly instructions

Exalto 240BS manual

Exalto

Exalto 240BS manual

Faun C40 Trackway user manual

Faun

Faun C40 Trackway user manual

Humphree HCS-5 installation manual

Humphree

Humphree HCS-5 installation manual

Vetus BOW4512D Operation manual and installation instructions

Vetus

Vetus BOW4512D Operation manual and installation instructions

Dock Doctors SLIDING BOARDING STEP Assembly instructions

Dock Doctors

Dock Doctors SLIDING BOARDING STEP Assembly instructions

Mastervolt Mass Combi 12/2000-100 Quick installation

Mastervolt

Mastervolt Mass Combi 12/2000-100 Quick installation

SeaView PM5-FMD-8 installation instructions

SeaView

SeaView PM5-FMD-8 installation instructions

Hobie Mirage 360 manual

Hobie

Hobie Mirage 360 manual

Zattini Group bamar BOXTRON E14S Use and maintenance instruction manual

Zattini Group

Zattini Group bamar BOXTRON E14S Use and maintenance instruction manual

Hobie Getaway Hatch instructions

Hobie

Hobie Getaway Hatch instructions

NUCANOE 3005 Assembly instructions

NUCANOE

NUCANOE 3005 Assembly instructions

Floe V1600 PWC Assembly instructions

Floe

Floe V1600 PWC Assembly instructions

Westland T-Top Console Cover installation manual

Westland

Westland T-Top Console Cover installation manual

Furuno TZTL12F installation manual

Furuno

Furuno TZTL12F installation manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Reborn Launch Wakeboard Tower
Polished
Installation Guide
Our Reborn Launch Wakeboard Tower uses many common parts with
unique design features that make it aff-ordable, adjustable, and easy to
install, fast to fold down and erect. Nice designed bracket to hold the
tower stay at the position for storage. It is a forward-facing design and
there are five main components -- Top Section, Left Leg, Right Leg, side
bars and mounting bases.
IMPORTANT NOTES FOR INSTALLING, MAINTAINING AND
USING YOUR TOWER
For a High Quality, Trouble Free Installation, read the
entire Installation Manual completely before you begin
Note that this ins action guide is only a guideline. Each
boat is different and improvisation is needed to mount your
tower on your boat. Following all the installation instructions
will give you a professional installation look. If you are not
good at it, we advise you to have your tower mounted by a
professional who has experience in boat constructions and
mounting other towers.
An important part of the installation is strengthen the
nuts in the tower to lock the legs into a position custom to fit
your boat, all hardware is to be hand tightened. Do not use air
tools or electric drills to tighten hardware. Our quick release
knobs will allow you to fold the tower for storage. You can fold
your tower to the front of your boat.
Note that after drilling the locking holes in the top
section, the tower leg span (width) is permanently set and
cannot be moved to another boat unless it has the same width.
The tower is silent by design. If you hear any rattling or
noise, check all hardware for tightness. Please contact us if you
continue to hear any rattling or noise before using the tower.
This means something is not installed correctly.
Contents of Box Inspect the package for missing or
damaged parts caused by shipping. Including the five main
components and followed accessories.
Begin Installation
During installation, you should protect the tower by doing all the layout
of the tower on a tarp, blanket or carpet and leave as much plastic
wrapping on the legs and top section as possible. Protect the general
mounting area of your boat by covering it with a tarp or blanket. Use
masking tape to protect your deck from scratches as you determine the
location of the four bases.
Note: Please remove black rubber cap at pipe end, THIS IS
PACKAGING ONLY!
Step 1:
Following the exploded drawings and assemble the tower on the ground.
You will not be drilling any holes in the tower at this point, and don't
tighten any bolt at this stage.
Very Important Note: The hem joints should connect with the front
legs as shown in the exploded drawing. And they must be attached after
you connect the rear legs to the base bar, because the hem joints could
be screwed in or out to adjust the clearance to fit. If you do opposite, you
will not have any clearance and meet trouble when you attach the rear
leg onto the base bar.
Step 2:
Using the measurements from the elevation drawing identify where the
best place is to fit the tower on your boat.
Step 3:
Cover the area where the base mounts will be placed with masking tape.
This should be done in all areas where the tower will be mounted and
the near surrounding area. This will help eliminate scratches to your boat
while adjusting and measuring your tower attachment points.
Warning: Before drilling into your boat, please check that
you have clear access to the area beneath and that no objects,
wires, or other hazards are present.
Tip: Do not measure from windscreen, cleats or vents. These
reference points are not always square and in the same position as
the opposite side of the boat. It’s the best to use the front of the
boat as the reference point, the top edge of the deck mold, or
similar measurement points whenever possible. Always triple-
measure and check before drilling.
Tighten the deck mounts firmly so that the mounts will rotate
under pressure while turning the mount with the leg attached (note
the mounts will be very hard to rotate by hands)
Step 4
Attach the tower onto the deck mounts. To make your job
easier, you can move the tower top from the base bar, and
assemble the base bars with the MOUNT SET. All feet are swivel
and can work with various mounting angles. Note to mount the
base bar vertical or you cannot fold your tower.
NOTE: When you have a narrow boat you probably need to
shorten the overhead bar to make the tower fit to your boat.
Step 5
Re-assemble the tower top onto the base bars. Drill through
the predrilled holes in the center section from each side with size
10 drill bit and install bolts and cap nuts. Please note that you need
to drilling holes on the Top section after you confirm the exact
measure it can fit on your boat and tighten with M10 x 75 bolts and
nuts. One person will still be stabilizing the tower through this
step. Tighten all hardware for completion of tower installation.
Step 6
Double check If the tower is in the correct position you can
fasten all the bolts and screws
How to fold the tower
1. Disconnect the Quick release knob of each rear legs from
the deck mount.
2. Press the tower forward of your boat slowly.
3. Connect the brackets to hold the tower stay at the position
for storage
Care and Maintenance
1. Be sure to check and retighten all bolts and connections
prior to every use.
2. Be cautious when towing or driving under obstacles, low
hanging structures or trees with your tower mounted.
3. When the tower is folded, always use a vest or other
cushion to protect your boat where the tower and boat touch each
other
4. Use soap and water or general cleaners to clean your
tower. Avoid abrasive materials that might scratch the tower's
surface.
5. Always rinse tower after touching salt(brackish) water.