manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Redx
  6. •
  7. Storage
  8. •
  9. Redx RX-2505PU User manual

Redx RX-2505PU User manual

Other Redx Storage manuals

Redx RX Series User manual

Redx

Redx RX Series User manual

Redx RX-2505AC User manual

Redx

Redx RX-2505AC User manual

Redx RX-2505PW User manual

Redx

Redx RX-2505PW User manual

Redx RX-5000AC User manual

Redx

Redx RX-5000AC User manual

Popular Storage manuals by other brands

IBM 40/80 GB HH DLTVS user guide

IBM

IBM 40/80 GB HH DLTVS user guide

Synology DiskStation DS716+II Quick installation guide

Synology

Synology DiskStation DS716+II Quick installation guide

Vantec NexStar-HX4 user manual

Vantec

Vantec NexStar-HX4 user manual

LaCie Christofle Galet datasheet

LaCie

LaCie Christofle Galet datasheet

LaCie Rugged Thunderbolt user manual

LaCie

LaCie Rugged Thunderbolt user manual

OCZ IBIS datasheet

OCZ

OCZ IBIS datasheet

Transcend JetFlash 110 Brochure & specs

Transcend

Transcend JetFlash 110 Brochure & specs

QNAP TS 32PXU Series user guide

QNAP

QNAP TS 32PXU Series user guide

LaCie RUGGED RAID user manual

LaCie

LaCie RUGGED RAID user manual

Freecom CLS DOCK Quick install guide

Freecom

Freecom CLS DOCK Quick install guide

PNY Attache P-FD64MBATT3 install guide

PNY

PNY Attache P-FD64MBATT3 install guide

OWC Mercury Elite Pro Dual mini Assembly manual

OWC

OWC Mercury Elite Pro Dual mini Assembly manual

OLT 6x6 Maximizer Assembly manual

OLT

OLT 6x6 Maximizer Assembly manual

Transcend JetFlash 160 Specifications

Transcend

Transcend JetFlash 160 Specifications

Thunderbolt 600 user manual

Thunderbolt

Thunderbolt 600 user manual

Intel RAID High Availability user guide

Intel

Intel RAID High Availability user guide

LaCie 12big Thunderbolt 3 Quick install guide

LaCie

LaCie 12big Thunderbolt 3 Quick install guide

Spectra Logic T-Series Spectra T50e quick start guide

Spectra Logic

Spectra Logic T-Series Spectra T50e quick start guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

All-In-One Energy Storage System
(Uninterrupted Power System)
www.redxenergy.com.au
RX - 2505PU
Safety Statement
Danger
Warning
Warning
Notice
This document is subject to change from time to time due to product upgrades or other reasons.
This document is not a substitute for the user manual or safety instructions.
Please read the user manual and related standards before undertaking any operation or
commissioning. Please take time to accesshttp://www.redxenergy.com.au or scan the QR code for
the latest quick installation guide.
Failure to comply with any of the above requirements may result in injury to personnel or damage
to equipment.
Prior to commencement, check whether the goods match the packing list, if there is any damage
to any items or components missing, please contact the Distributor / Dealer or Redx.
The power cables must be intact and well insulated. Please use insulating gloves and wear personal
protective equipment at all times when installing this product.
All safety labels, warning labels, andnameplates must be clear and visible andcannot be
removed or overwritten.
Hot surface!
Inverter module may become hot after extended period of operation. Allow time for inverter
to cool before touching!
The country setting and protection parameters must be set by professional personnel based
on local power grid standards.
Incorrect country settings may affect the operation failure to meet the local standard.
Warning Label
Disconnect all external power supplies before
maintainace.
Device only has high voltage on AC input and
AC output. professional and qualified technicians
are not required to install this unit.
Hot surfaces!
Read the instructions before
operation.
Wait for 5 minutes before touching the internal conductive components after system
turn off and disconnected from grid.
5min
Shock hazard!
Exposure to sunlight and the elements are not recommended.
All electrical connections must meet local and national electrical standards.
Only connect the system to the grid with local authority approval .
Redx shall not be liable for any loss of life or damage caused by failure to comply with the
requirements of this document and user manual.
Warranty will be void if the cover is removed. Improper opening of the unit may also result in
serious electrical shock or injury to personnel.
This drawing is for reference only. Please refer to the actual product.
≥300mm ≥300mm
600
900
The size and parameters of the product are subject to change without notice.
http:// www.redxenergy.com.au
APP Download
Packing List
Installation Location
Dimension
145
RX-2505PU
Power cord M6
M4 DocumentM5 Hole template
Mounting bracket
1PCS 1PCS
5PCS 1PCS1PCS 1PCS
6PCS 1PCS
Information
Hot surface
Installation
Grounding Connection
Connect cables to DC1 and DC2(Optional function)
RS485 Installation
AC input / output
31
5
2
Hole template Hole template Expansion Bolts
Rx-2505
Bracket
6
1 3 5
24
①
②
Nut / washer Bracket
4
DC1 DC2
Connect cables to DC1 and DC2:
The functions of Wind Turbine and PV Arrays can be installed according to the needs of customers.
DC1+
DC1-
optim izer
(one for each panel)
PV Arrays
Avoid water and electricity when drilling, bit size φ8mm, drilling depth 40mm.
This figure is for reference only, please refer to the actual product!
Customers could connect their own WiFi
module,to replace the built-in WiFi module
with the same communication port.
Refer to the RX - 2505PU manual for the
detail of the RS485 installtion.
Notice
②The total maximun output current shall not exceed 10A.
①The maximum input current shall not exceed 10A.
RX - 2505PU
OR
Power point
Grid
Load
Load
Power point
extension
1
+5V 485- 485+ GND
2 3 4
Notice
Pre - operation inspection
8 9
67
3
4
0.8
Negative DC1
conductor
Negative DC2
conductor
Positive DC1
conductor
Positive DC2
conductor
Nut
Nut
1 5
2
Double core DC conductor
Connector
DC2-
DC2+
Wind Turbine
Controller
DC1 DC2
①
②
③
④
⑤
⑥
⑦
The installation location meets the requirement.
Checking Items
The system has been securely installed.
Sufficient space for heat dissipation. No objects are left in the system.
System wiring is normal and firm.
Cables are properly installed and well protected without any damage.
All terminals have been sealed.
Warning labels are not covered without alteration or occlusion.
Result
YES NO
If the startup fails, refer to "Troubleshooting" in the user manual.
For details about LED indicators, refer to the user manual.
③
④
Operation
Following the steps to start the system.
①Step : Connect to the grid ( if available) and connect PV or Wind to DC1 and DC2.
②
Step : Turn on the battery isolation circuit breaker.
Step : Turn on the power button.
Step : Download the Redx App, follow the App instructions.
Step⑤: Complete all steps in the App instructions.
Operating
status
AC-ON Normal – Green
Fault – Red
Grid connected – Green
Grid disconnected – Blue
Charging – Green
Discharging – Blue
DC
GRID
CHG
BATT Battery status
BATT
LED Status
NO DC – Led off
DC1 > 100W – Green (Flash)
DC2 > 100W – Blue (Flash)
DC1&DC2 > 100W – Yellow (Flash)
Divert load