The manual is intended to provide detailed information of product information, installation,
application, trouble shooting, precautions and maintenance of the energy storage system.. Please read this
manual carefully and follow all safety precautions seriously before any moving, installation, operation and
maintenance to ensure correct use and high performance of operation on the machine.
The use of the energy storage system must comply with local laws and regulations on grid-tied power
generation.
The manual needs to be kept well and be available at all times.
All rights reserved. The contents in this document are subject to change without notice.
There may be data deviation because of product improving. Detailed information is in accordant with
the final product.

Energy storage integrated machine Content
Content
Preface........................................................................................................................................................ i
Content...................................................................................................................................................... ii
1 Safety precautions.............................................................................................................................. 1
1.1 Warning signs.............................................................................................................................. 1
1.2 Safety guide.................................................................................................................................1
1.2.1 Transportation and installation............................................................................................ 4
1.2.2 Grid-tied operation..............................................................................................................5
1.2.3 Maintenance and replacement.............................................................................................5
1.2.4 What to do after scrapping.................................................................................................. 5
2 Product overview............................................................................................................................... 6
2.1 Energy storage system.................................................................................................................6
2.2 Product appearance..................................................................................................................... 7
2.2.1 Key component description.................................................................................................7
2.3 Products modules........................................................................................................................ 9
2.4 Dimensions and weight...............................................................................................................9
3 Storage of the energy storage integrated machine....................................................................... 11
4 Installation........................................................................................................................................12
4.1 Unpacking confirmation............................................................................................................12
4.2 Preparation before installation.................................................................................................. 14
4.2.1 Installation tools................................................................................................................ 14
4.3 Electrical connection.................................................................................................................16
4.3.1 Battery connection.............................................................................................................17
4.3.2 PV connection................................................................................................................... 17
4.3.3 Grid and load connection..................................................................................................18
4.4.3 Definition of CAN interface pin in the battery.................................................................19
4.4.4 Definition of CAN2 interface pin in the energy storage inverter..................................... 20
4.4.5 RS-485 communication connection..................................................................................20
4.4.6 DRMO/COMM/Battery_ TEMP/CT communication connection................................... 22
5 LCD operation instructions............................................................................................................ 23
5.1 Instruction for main page...........................................................................................................23
5.2 Display menu............................................................................................................................ 25
5.3 Parameter setup of the energy storage integrated machine.......................................................26
5.3.1 Parameter classification page............................................................................................ 26

Energy storage integrated machine Content
5.3.2 Instruction for setup parameter......................................................................................... 27
5.3.3 Inverter data display..........................................................................................................29
6 Fault code..........................................................................................................................................30

Energy storage integrated machine Safety precautions
1. Safety precautions
Energy storage integrated machines are designed and tested strictly in accordance with relevant
international safety standards. As an electrical and electronic device, all relevant safety regulations must
be strictly complied during installation, operation, and maintenance. Incorrect use or misuse may result in:
• Injury to the life and personal safety of the operator or other people.
• Damage to the machine or other property belonging to the operator or other people.
• This chapter mainly various warning symbols in operation manual and provides safety
instructions for the installation, operation, maintenance and use of energy storage integrated machines.
Statement
Our company shall not be liable for any consequence caused by any of the following events.
• Damage caused by transportation.
• The storage conditions do not meet the requirements specified in the manual, resulting in damage.
• Incorrect storage, installation, and use.
• Unqualified personnel install and operate the machine.
• Failure to comply with the operation instructions and safety precautions in this manual.
• Operate in extreme environments which are not covered in this manual.
• Exceed the operation range of parameters that specified in the technical specification.
• Unauthorized dis-assembly, modification, or modification of the software code.
• Device damage caused by abnormal natural environment (force majeure, such as lightning strikes,
earthquakes, fires, storms, etc.)
• Warranty expiration without extension of the warranty service.
• Installation or use in environment which are not specified in related international standards

Energy storage integrated machine Safety precautions
-3-
1.1 Warning signs
Warning signs are used to warn you about the conditions that may cause severe injury or damage to
the device. They instruct you to exercise caution to prevent danger. The following table describes the
warning signs used in this manual.
Sign
Name
Description
Abbreviation
Danger
Danger
Serious physical injury or even death may
occur if related requirements are not
followed.
Warning
Warning
Physical injury or damage to the devices
may occur if related requirements are not
followed.
Forbid
Electric
discharge
Damage may occur if related requirements
are not followed.
Hot Side
Hot
Side
Sides of the device may become hot.
Do not touch
Attention
Attention
Steps to take for ensuring the proper
running of the device.
Attention

Energy storage integrated machine Safety precautions
-4-
1.2 Safety guide
•After receiving this product, first confirm the product package
is intact. If any question, contact the logistic company or local
distributor immediately.
•The installation and operation of the machine must be carried
out by professional technicians who have received professional
training, and thoroughly familiar with all the contents in this
manual and the safety requirements of the electrical system.
• Do not carry out connection/disconnection, unpacking inspection
and unit replacement operations on the machine when power source
is applied. Before wiring and inspection, users must confirm the
breakers on DC and AC side of inverter are disconnected and wait
for at least 5 minutes.
・Ensure there is no strong electromagnetic interference caused
by other electronic or electrical devices around the installation
site.
• Do not refit the machine unless authorized.
• All the electrical installation must conform to local and
national electrical standards
・Do not touch the housing of the machine or the radiator to avoid
scald as they may become hot during operation
・Ground with proper technical before operation
・Do not open the surface cover of the machine unless authorized.
The electronic components inside the machine are electrostatic
sensitive. Do take proper anti-electrostatic measures during
authorized operation.
• The machine needs to be reliably grounded.
• Ensure that DC and AC side circuit breakers have been
disconnected and wait at least 5 minutes before wiring and
checking.
Note: Technical personnel who can perform installation, wiring, commissioning,
maintenance, troubleshooting and replacement of the energy storage inverters must meet the
following requirements:
•Operators need professional training.
•Operators must read this manual completely, and master the related safety precautions.
•Operators need to be familiar with the relevant safety regulations for electrical systems.
•Operators need to be fully familiar with the composition and operating principle of the entire
energy storage system, and related standards of the countries/regions in which the project is
located.
•Operators must wear personal protective equipment.

Energy storage integrated machine Safety precautions
-5-
Single PV string cannot connect to muti-inverters
One battery bank cannot be connected to muti-inverters
Inverters do not support three-phase operation

Energy storage integrated machine Safety precautions
-6-
Back-up cannot connect in parallel
On-grid or back-up side cannot connect any ac generator

Energy storage integrated machine Safety precautions
1.2.1 Transportation and installation
. Keep the package and unit complete, dry and clean during storage and
transportation.
This machine Is heavy. Please remove and Install It with at least two people.
, lb ensure the normal and safe operation of the energy storage integrated machine
and avoid personal injury, please select proper handling and installation tools, and take
mechanical protection measures to protect personal safety such as wearing smashing
shoes, coverall and so on.
・Only qualified electricians are allowed to install the machine.
・Do not put and install the machine on or close to flammable or explosive materials.
• Do not install the machine in a place where children and ottier people can easily touch
it.
• lb avoid a risk of electric shock, please remove rings, bracelets, and other metal jewelry
on your hands before installation and electrical connection.
• The solar cell modules exposed to the sunlight may generate dangerous voltage. Users
must cover the cell modules with fully light shading materials before electrical
connection.
• The Input voltage of the machine should not exceed the maximum Input voltage,
otherwise damage may occur.
. The machine is not suitable for the positive or negative grounding s 玲terns of solar cell
modules.
• Ensure the proper grounding of the Inverter.
• Ensure reliable installation and electrical connection.
Note: Our Hybrid inverter machine are only for crystalline silicon solar modules.

Energy storage integrated machine Safety precautions
-5-
1.2.2 Grid-tied operation
* Only qualified electricians are allowed to operate the machine under the
permission of local power departments.
*All electrical connections must meet the electrical standards of the
countries/regions in which the project is located.
*Ensure reliable installation and electrical connection before operation.
*Do not open the cover of the machine when the machine is working or any circuit is
connecting to the machine.
1.2.3 Maintenance and replacement
*Only qualified electricians are allowed to perform the maintenance, inspection, and
component replacement of the machine.
* Please contact the distributor or manufacturer for maintenance.
* In order to avoid irrelevant personnel from entering the maintenance area during
maintenance, temporary warning signs must be placed to warn non-professionals to enter
or use fence for isolation.
*Before carrying out any maintenance operations, all input power to the machine
must be disconnected first, and wait for at least 5 minutes until the internal partsof the
machine are fully discharged.
*Please follow the electrostatic protection norms, and take correct protective
measures because there are mostly electrostatic sensitive circuits and devices in the
machine.
*Do not use parts and components not provided by our company during
maintenance.
*Restart the machine after eliminating the faults and problems which may affect the
safety and performance of the machine.
*Do not get close to or touch any charged metal conductor parts of the grid or
running system, otherwise electric shock or fire may occur. Please do not ignore the
warning icons and instructions with "electric shock".
1.2.4 What to do after scrapping
*Do not dispose of the machine together with household waste. The user has the
responsibility and obligation to send it to the designated organization for recycling and
disposal.

Energy storage integrated machine Product overview
-6-
2Product overview
This chapter mainly describes the appearance, packaging accessories and other information of energy
storage integrated machines.
2.1 Energy storage system
Figure 2.1 Energy storage system
Symbol
Description
A
PV module
B
Battery
c
Energy storage integrated machine
D
Public grid
E
Load

Energy storage integrated machine Product overview
-7-
2.2 Product appearance
Figure 2.2 Appearance of RESS 5000-A of the all-in-one energy storage machine
Figure. 2.3 Appearance of inverter module of the all-in-one energy storage machine

Energy storage integrated machine Product overview
-8-
Figure. 2.4 Appearance of battery module of the all-in-one energy storage machine
2.2.1 Key component description
Figure 2.3 Appearance diagram of inverter module for energy storage integrated machine
No.
Name
Description
1
LCD interface
LCD connection terminal
2
COMM/DRM
COMM/DRM communication port
3
Fan
Cooling fan
4
PV connection terminal block
PV DC input terminal of the inverter
5
RS485-3
RS485-3 communication port
6
RS485-1/2
RS485-1/2 communication port
7
Battery CAN1
Battery CAN communication interface
(network interface)
8
Battery CAN2
Battery CAN communication interface
(terminal)
9
EPO
E-stop switch port
10
Battery connection terminal block
Battery wiring port
.11
Mains connection terminal block
Mains wiring port
12
Load connection terminal block
Load wiring port

Energy storage integrated machine Product overview
-9-
2.3 Products modules
Product name
Model
Rated output power (W)
Single phase (L, N, and PE)
Single-phase energy storage
integrated machine
3kW
3000
Note: Technical parameters of the energy storage integrated machine refers to appendix.
2.4 Dimensions and weight
Figure 2.4 Dimensions of the energy storage integrated machine
Dimension and net weight of the energy storage integrated machine
Model
H(in)
W(in)
D(in)
RESS 5000-A
50.12
27.56
11.34

Energy storage integrated machine Storage of the energy storage integrated machine
-10-
3 Storage of the energy storage integrated machine
If the machine is not put into use immediately, the storage of the machine should meet the following
requirements:
• Do not remove the outer packing.
• The machine needs to be stored in a clean and dry place, and prevent the erosion of dust and water
vapor.
• The storage temperature should be kept at -20°C-+60°C, and the relative humidity should be kept
at 4% RH-100% RH.
• Keep away from chemically corrosive substances that may corrode the machine.
• Periodic inspections are required. If damages are found by worms and rats, or packages are found
to be damaged, the packaging materials must be replaced in time.
• After long-term storage, machines need to be inspected and tested by qualified personnel before
putting them into use.

Energy storage integrated machine Installation
-11-
4 Installation
4.1 Unpacking confirmation
Before unpacking, check carefully whether the product information in the order is consistent with that
on the nameplate of the package box, and whether the product package is intact. If there is any question,
please contact the supplier timely.
Store the idled machine in its original package, and take anti-moisture and anti-dust measures.
After taking the machine out of the box, check the following items:
• Confirm the main body of the machine is intact and free from any damage;
• Confirm there is operation manual, interface accessories and installation accessories inside the
package box;
• Confirm the deliverables inside the package box are intact and complete;
• Check whether the product information in the order is consistent with that on the machine
nameplate;
Figure 4.1 Standard delivery list

Energy storage integrated machine Installation
-12-
Delivery list of 3 KW/5 KW energy storage integrated machine
No
name
quantity
remarks
A
3 kW / 5 kW energy storage integrated machine cabinet
1
B
communication connector
2
C
RS485 communication connector
1
D
DRMO communication connector
1
E
RS485 Communication link
1
F
RJ45 reticle
2
G
Power cable of the battery energy storage integrated machine
2
H
User manual
1
I
M5*14 hex assembling bolts
20

Energy storage integrated machine Installation
-13-
4.2 Preparation before installation
4.2.1 Installation tools

Energy storage integrated machine Installation
-14-
Figure 4.2 Installation spacing(unit : IN)
In order to ensure good ventilation of the energy storage integrated machine, please reserve enough
installation spacing around the machine during installation.
Table of contents
Popular Storage manuals by other brands

Compaq
Compaq 157767-001 - AIT Drive 50/100 Tape reference guide

Spectra Logic
Spectra Logic Spectra 12K supplementary guide

Lenovo
Lenovo ThinkSystem DS Series Hardware installation and maintenance guide

Iomega
Iomega ZIP drive 100 user guide

Imation
Imation Odyssey Hard Disk Storage System Brochure & specs

Spectra Logic
Spectra Logic Spectra 12K supplementary guide