Common tools needed:
General Characteristics
In case of instantaneous heaters, hot water flow has to at least meet flow required by heater and maintain burning. (Specified by heater
manufacturer)
Operating Specifications
Hot water supply temperature:
Maximum: Reference manufacturing specification
Minimum: 140°F
Minimum difference between hot and mixed temperature is: 50°F
Operating Pressure:
Maximum: 70 PSI
Minimum: 20 PSI
Operating pressure (on hot and cold line) should be kept as balanced as possible in order to assure maximum efficiency.
When the pressure is greater than 70 PSI, a pressure reducer is required and must be fitted before valve.
Technical Data
The temperature control knob is graduated from 75°F to 120°F with auto stop at 100° to avoid scalding.
Temperature limit setting of less than 120°F.
Fit a stop valve/volume control between thermo valve outlet and end device(s).
Plumbing Recommendations
• An independent water supply for both hot and cold is required. Do not pipe off ring main.
• Large runs of pipe work will cause frictional loss of pressure.
• The recommended main water supply piping to valve shall be 3/4” minimum.
• If more than one valve is installed, the recommended main water supply piping to valve shall be 1” minimum, reducing to 3/4” within
24” of each valve.
(Ensure adequate supply from both hot and cold water can be maintained.)
Water By-Laws
The mixing valve should be installed in compliance with the water by-laws. For further details refer to the latest copy of by-laws guide
or your local water authority.
Rough in Valve Installation
Note: Use Teflon tape or equivalent to seal all threaded port joints.
Do not remove mud cover from valve before locating mounting surface depth in the wall.
Do not turn the cartridge stem - temperature settings are pre-calibrated at the factory.
Install plug into one of the two outlet ports. Note: For proper valve operation only one outlet port may be used.
Mount valve to cross support using shims and screws (not included). Valve shall be perpendicular and fixed
firmly to cross support to achieve proper trim attachment.
Place the cross support with valve between wall studs. The min./max. valve exposure template on the mud
cover and vertical height desired within tub/shower enclosure determines the exact cross support placement.
Attach cross support to wall studs.
1.
•
•
•
•
•
Plug
Shim
Figure 1
Maximum exposure
Minimum exposure
Finished wall
Mud cover
Mud cover
template
Wall stud
Figure 2
Technical support: 1-866-417-5207 Customer Service: 1-877-747-4671
3
Cartridge stem
DO NOT TURN
Cross support
RH-5444 REV_