Reboot the BNP
The BNP can be rebooted through a power cycle or using the
Element Manager application.
To power the unit down, disconnect the power cable from
the connector.
To reboot the switch from EM, select Maintenance >
Reboot, then click Apply Reboot.
•
•
GigE Port Configuration
Select Configuration > GigE Control Port Configuration.
Configure the ports by enabling the port and providing the IP
address, subnet, and gateway for each.
Repeat for each port and click Apply.
1.
2.
3.
Copyright©2005-2006 RGB Networks. All rights reserved.
Specifications
Global Configuration
Select Configuration > Global Chassis Configuration.
Enter the necessary settings and click Apply.
1.
2.
SNMP Configuration
1. Select BNP > Configuration > SNMP.
2. Enter the SNMP settings and click Apply.
Element Manager
Element Manager requires JRE v1.5 or higher. You can install
JRE from Sun’s web site or from the included product CD.
To launch Element Manager:
Open a browser session on the management workstation.
Enter the IP address of the BNP into the browser’s address
field. The default IP address is 10.1.1.1. The address of
the computer being used must be changed to an address
on the same subnet as the BNP.
Click Launch Element Manager.
Enter the IP Address of the BNP.
Select your user account and enter the corresponding
password.
1.
2.
3.
4.
5.
Parameter Value
Input Power AC: 100-127 VAC @ 7.6A to 200-240 VAC @ 3.8A
DC: 48 VDC @ 14A (range 36-75 VDC)
Line frequency 50Hz to 60Hz
Pwr Consumption 300 W maximum (fully loaded)
Dimensions 1.75“ x 19” x 23“
Weight 30 lbs (11.34 kg)
Cooling Front to back
Env. Condition Limitation
Nonoperating Temp -40° to 70° C (-40° to 158° F)
Operating Temp 0° to 40° C (32° to 104° F)
Humidity 5% to 95% (non-condensing)
Power Up
Connect all ports before applying power.
Locate the included AC power cable and plug one end into
the BNP power connector. Plug the other end of the power
cable into the input power source. The unit should now
have power and the Cfg/Pwr LED turns solid green.
For DC power, cut the provided DC connector cables to
the correct length to reach the BNP from the power source.
Attach the connector cables from the power source to the
BNP power connectors. Attach the other end of the power
connector cables into the input power source. Toggle the
external circuit breaker to the ON position.The unit should
now have power and the Cfg/Pwr LED turns solid green.
Cfg/Power Backup
Fault
Compact flash 10 GigE Port/SFP Fast Ethernet
LEDs
5
7
9
12
Rev. G
8Ethernet Control Port Configuration
Select Configuration > Ethernet Port Control.
Enter the necessary settings and click Apply.
1.
2.
6
10
ASI Configuration
1. Select BNP > Configuration > ASI Port.
2. Use the pull-down list for direction to select or change the
data flow direction of a specific port and click Apply.
11