Riverstone Networks Mojave Edition 041315V User manual

WA RRAN TY
65 Fleetwood Drive, Rockaway, NJ 07866
Customer Service: (877) 373-3078 Email: customerservice@rsiww.com
After Hours Helpline: (443) 574-4764
Monticello Solar Ventilation System
Assembly Instructions
MojaveEdition
Made in the USA
041315V

Thank you for choosing the Monticello Greenhouse Program
Thank You for your Purchase
We want to thank you for your purchase of the Monticello Greenhouse. We appreciate
your support of our American Made Greenhouses.
The Monticello is designed for the average homeowner; no special degrees are needed.
The time to assemble depends on the weather, skills, options, and number of helpers
you have in the process. All the pieces are cut to size and should t snug, BUT if
something is not working please reach out to our help lines so we can make sure that
there are no delays in the process. We are not only employees of Riverstone but
owners of Monticello Greenhouses and can help you through the process and hopefully
keep the frustration levels down if a question comes up.
We would like to take a moment to remind you as the new owner of a Monticello
Greenhouse a few things to increase the life of your greenhouse.
• Make sure that all your roof vents are closed and tied down with the included
bungee balls during high winds. This would be a 25 mph gusting wind and up.
This will help prevent air getting into the Monticello and causing damage.
• Like with the roof vents, make sure the dual doors stay closed during winds. The
doors are spring loaded to stay closed but we also know that the greenhouse can
get rather hot in the warmer months and doors do get propped open. Just make
sure that they get closed.
• In cooler snow prone climates, Cut some 2 x 4 ‘s and put them against the roof
ridge and the oor to help add support from heavy snow and ice. This is just a
precaution but could save a lot of aggravation down the road.
• It is also a good practice to clean the snow off the roof. A little snow if ne, but
several inches only will tempt fate and it is best to be safe than sorry.
• The polycarbonate panels have channels in them. These are designed to help
insulate and in moist environments, like after a rainstorm, you might nd water
droplets in these channels. It will not cause any harm and will burn itself off when
the air starts to heat up.
• In some cases where there is a lot of rainfall, like the Pacic North West, we
recommend using clear silicon caulking between the polycarbonate panels and
the trim plates before the trim plates are put on. This is just to assure that the
Monticello stays as dry as possible. Just give a call if you need some more help
with this.
Lastly, we are not perfect. We know that there are better ways to do things,
we just need some suggestions from our customer base as to what they are.
Needless to say we are always open to feedback, good and bad, and we do react
to feedback. Please, if there is an option you do not see that you feel would make
the greenhouse experience better, if there is a different way to explain a set-up
process, or if there is anything else to help make Monticello better we want to
hear from you.
Thank you again for your purchase and we hope you have many years of growing in
your new Monticello Greenhouse.
David Schnurman
Vice President

WWW.RSIWW.COM
1 of 8
List of Parts WARNING: Profiles with cut edges and/or drilled holes
are sharp. Use extreme caution when handling.
The greenhouse is shipped in multiple cartons. These cartons are heavy. Use care when lifting them.
Some parts have sharp edges. Use extreme caution when handling.
Wear proper safety gear including work shoes, gloves and safety goggles.
Keep children and pets away until assembly is complete.
Finish assembling the roof in one session. Do not leave the roof unattended until it is completely assembled.
Place all like parts together in a staging area. Prepare for each step according to instructions in this manual.
If any parts are missing or damaged, before beginning assembly contact Riverstone Customer Service
at (877) 373-3078, email: customerservice@rsiww.com or After Hours Helpline: (443) 574-4764
QTYProfile
F-10 2
23”
24” x 37¼”
41
/2” x 24”
W-7 1
W-9 1
Hardware QTY
S-2C 26
S-2D 16
S-7 26
S-5B 4
S-5D 8
S-11 12
QTYFan Parts
H-3 2
H-1 2
H-2 2
H-4 2
H-5 4
H-7 1
H-8 1
H-6 1
H-10 10’
H-11 8’
H-9 1
B-2 4
Connectors QTY

F-10
F-8
W-7
W-1
W-1
F-1
W-1
W-7
F-10
F-8
W-1
F-7
F-1
WWW.RSIWW.COM 2 of 8
1.1A
Place F-10 profile on
W-7 panel. Make sure
profile fits snugly
between F-8 back
profile and F-1
wall profile.
NOTE: VIEWS FROM INSIDE.
1.1B
Secure B-2 with three T-bolt
assemblies and one S-2C cap
as shown.
B-2
B-2
1.1E
Secure B-2 with three T-bolt assemblies
and one S-2C cap as shown.
1.1F
Working from outside, repeat
steps 3.4B and 3.4E to install
B-2 connectors on F-1 profiles.
1.1c
Place another F-10
Profile about 5” from
top of F-1 profile.
F-8
F-10
F-10
W-7
W-9
W-1
W-1
F-1
1.1D
Fit W-9 panel into channel in F-10
profile. Adjust both so panel is
snug and lines up with top
of W-1 Profiles.
QTYPanel
W-9 1
41
/2” x 24”
QTYConnectors
B-2
S-2C
S-7
4
16
4

WWW.RSIWW.COM
3 of 8
F-6
F-10
F-8
W-7
W-9
W-1
W-1
F-1
F-10
F-10
1.2A
The two sets of F-6 and F-10 profiles fit on top of W-1 panels. Line up bottom bolt
channels with top edge of F-1 and F-7 vertical profiles. Profiles will fit snugly.
Working from inside right corner, place F-6 profile with mitered end
next to corner and angled edge facing up onto corner W-1 panel. F-6
profile fits snugly between F-7 corner profile and F-8 back profile.
1.2B
Continue along back wall.
Place first F-10 profile.
Align with F-6 profile.
NOTE: ALL VIEWS FROM INSIDE.
F-7
F-6
G-1
F-8
W-1
QTYProle
F-6 2
F-10 2
23”
23”

WWW.RSIWW.COM 4 of 8
Connectors QTY
S-2C 2
S-7 2
Fan QTY
H-8 1
Thermostat QTY
H-7 1
Connectors QTY
4
4
S-2D
S-5B
H-7
Install Fan and Solar Panel
Make certain the pieces are in the correct positions before securing.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
2.1A
Working from inside install two T-bolts
into track, lock into place. Fit H-7
thermostat on T-bolts.
Secure with S-2C caps.
Working from inside, fit H-8 fan
over S-11 bolts in F-10 profiles.
2.2A 2.2B
Secure with S-2D nut and S-5B washer.
2.1B
NOTE: VIEWS FROM INSIDE.
S-2D S-5B S-11
F-10
H-7
S-2C
S-2C
W-1
W-7
F-10
F-10
S-11
S-11
S-11
H-8
W-1
W-9
F-7
NOTE: VIEW FROM INSIDE.
Side View

WWW.RSIWW.COM
5 of 8
Shutter QTY
H-6 1
Connectors QTY
S-2C 8
S-7 8
Shutter Parts QTY
H-2 2
H-1 2
Tape QTY
H-10 10’
Working on the ground, line
up holes in H-1 brackets with
holes in H-6 shutter. Secure
with S-7 bolts and S-2 caps.
2.3A
H-1
H-1
H-6
2.3B
Working from outside insert
four T-bolt assemblies into
slots on H-1 brackets.
Secure to F-8 and F-1
profiles as shown.
F-10
F-8
F-1
H-1
H-1
H-2
H-2
H-6
2.3c
Place H-2 Profile on top of shutter. Smooth aluminium tape
along edges at top and sides. Repeat to install H-2 on bottom.
H-1
H-2 H-10
H-6
H-1
S-11
S-11
S-7
S-2C
S-2C
S-2C
S-2C
H-1
H-1
H-6
NOTE: VIEWS FROM OUTSIDE.

WWW.RSIWW.COM 6 of 8
H-4
H-3
H-3
H-4
H-9
2.4D
Install H-9 solar panel on H-3 profiles
and secure with S-2D nut.
H-9
S-5D
S-11
S-2D
S-5D
S-11
S-2D
S-5D
S-11
S-2D
S-5D
S-11
S-2D
2.4c
Install 4 S-5A
connectors on to
H-9, 2 at the top
and 2 at the bottom.
Side View From Top
S-2D
S-11
H-3
H-9
S-5D
H-9
S-11
S-2D
H-4
H-3
H-3
H-4
H-5
H-5
H-5
H-5
2.4B
Place H-3 profile on H-4 brackets. Fit H-5 connector underneath and
secure with S-11 bolts, S-5D washers and S-2D nuts as shown.
View from bottom
S-5D
S-11
S-2D
H-4
H-3
H-5
NOTE: VIEWS FROM OUTSIDE.
Connectors QTY
H-5 4
Solar Panel QTY
H-9 1 H-3 2 S-2C 4
S-7 4
Connectors QTY
S-11 8
S-5D 8
S-2D 12
H-4 2
Solar Panel Parts QTY
H-4
H-4 F-1
F-8
2.4A
Working from outside, fit H-4 brackets ontoT-bolts on F-8 and F-1 profiles.
Secure with S-2C caps.
S-2C
NOTE: VIEWS FROM OUTSIDE.
Bottom View

WWW.RSIWW.COM
6 of 8
Working from inside.
Drill hole through
polycarbonate.
2.5A
NOTE: VIEW FROM INSIDE.
H-9
2.5B
Connect wires to Solar Panel.
Push the wires to the inside of the
greenhouse (leaving enough wire on
the outside to connect).
NOTE: VIEW FROM OUTSIDE.
2.5c
Measure over to the thermostat
with the wire. You will need to
cut the positive wire. Look at
the solar panel connectors to
determine the positive wire. You
will hook the positive wire coming
in from the solar panel to the
top lug of the thermostat. The
other wire will be attached to the
bottom lug. (NOTE you are only
breaking one leg of the circuit).
This wire to
Solar Panel.
This wire
to Fan.
Thermostat
Control Unit
with Cover
removed.
Wire QTY
H-11 16’
NOTE: VIEW FROM INSIDE.

WWW.RSIWW.COM 8 of 8
H-7
H-8
Charge
Controller
Battery
2.5E
OPTIONAL CHARGE CONTROLLER AND BATTERY: For accurate wiring
using charge controller and battery, refer to the wiring diagram provided
with the charge controller.
NOTE: VIEW FROM INSIDE.
H-7
H-8
2.5D
Continue the wire over
to the fan and attach
to the wires of the fan
with the two wire nuts
provided. If it runs
backwards reverse wires.
NOTE: VIEW FROM INSIDE.