
A. Disconnect RDAT & Power from the main unit.
B. RemoveCoverfrommainunitbyunscrewingthesixhexheadscrewswiththe3/32"AllenwrenchsuppliedwiththeEPX2.
C. Remove 2 Jumpers on connector P5 corresponding to LOL, LRL, LOR & LRR.
D. RemovetheTopHalfofthe2Standoffscarefully by hand from the main unit. It is not necessary to remove the top screws
when separating the standoff into its segments.
MAN-0953-C
©5/97
®®
E. Install E14 carefully into header connections P3, P4 and P5.
F. Replace 2 Top Standoffs, with screws intact, carefully by hand. (
Do Not Overtighten.
)
G. Replace Cover on the main unit with the six hex head screws.
H. Reconnect RDAT & Power to main unit.
I. Adapt E14 Software by selecting DCard from the Setup menu and select E14 or refer to page 36 of your EPX2Manual.
J. Congratulations! You have successfully installed your optional Equalizer Module.
ATTENTION: To maintain your EPX
2
warranty, we recommend your Authorized Rockford Fosgate Dealer install your new accessory.
INSTALLING THE OPTIONAL SYM-E14 DCARD
® ®
P4
P5
P3
BB
B
B
A
B
DC
D
™
P4
P5
P3
F
E
F
EE
EE
E