TABLE OF CONTENTS
XIV © SAMSUNG Electronics Co., Ltd.
Figure 2.18 Fixing 3 Sector Pole Type RRH-2WB (5)...........................................................2-19
Figure 2.19 Fixing 3 Sector Pole Type RRH-2WB (6)...........................................................2-20
Figure 2.20 Bolt Specifications for 3 Sector Pole Type RRH-2WB-Examples.......................2-21
Figure 2.21 Example of Installing on the Tower ....................................................................2-22
Figure 2.22 Fixing Tower Type RRH-2WB (1).......................................................................2-23
Figure 2.23 Fixing Tower Type RRH-2WB (2).......................................................................2-24
Figure 2.24 Fixing Tower Type RRH-2WB (3).......................................................................2-25
Figure 2.25 Fixing Tower Type RRH-2WB (4).......................................................................2-26
Figure 2.26 Fixing Tower Type RRH-2WB (5).......................................................................2-27
Figure 2.27 Fixing Tower Type RRH-2WB (6).......................................................................2-28
Figure 2.28 Fixing Tower Type RRH-2WB (7).......................................................................2-29
Figure 2.29 Fixing Tower Type RRH-2WB (8).......................................................................2-30
Figure 2.30 Leveling Test before Fixing Anchor Bolts ...........................................................2-31
Figure 2.31 Leveling Test before Fixing System ...................................................................2-32
Figure 2.32 Schematic Diagram for Insulation Test...............................................................2-33
Figure 3.1 Work Flow for Cabling............................................................................................3-1
Figure 3.2 Cabling Diagram....................................................................................................3-5
Figure 3.3 Connection of the RRH-2WB Ground Cable..........................................................3-8
Figure 3.4 Power Equipment Diagram..................................................................................3-10
Figure 3.5 Installing the RRH-2WB Power Cable (1) ............................................................3-11
Figure 3.6 Installing the RRH-2WB Power Cable (2) ............................................................3-12
Figure 3.7 Power Cable Connector.......................................................................................3-13
Figure 3.8 Cable connection between the DU and the RRH-2WB (Optical connection) .......3-15
Figure 3.9 Optic Cable Connector between DU and RRH-2WB_RRH-2WB side.................3-16
Figure 3.10 Cable Connection of RET ..................................................................................3-20
Figure 3.11 RET Cable Connector........................................................................................3-21
Figure 3.12 Feeder Line Connection Diagram......................................................................3-22
Figure 3.13 Connection of Feeder Cable (Detail A) ..............................................................3-23
Figure 3.14 Connection of Feeder Cable (Detail B)..............................................................3-24
Figure 3.15 Heat Shrink Tube Specification..........................................................................3-26
Figure A.1 Sector Antenna..................................................................................................... A-2
Figure B.1 Feeder Cable Grounding (1)................................................................................. B-4
Figure B.2 Feeder Cable Grounding (2)................................................................................. B-5
Figure B.3 Feeder Cable Grounding (3)................................................................................. B-6
Figure B.4 Feeder Cable Grounding (4)................................................................................. B-7
Figure B.5 Connecting the Tower Ground Cable.................................................................... B-9