San Franciscan Roaster SF1-LB User manual

THE SAN FRANCISCAN
MODEL SF1-LB COFFEE
ROASTER

SF 1LB Manual – Page 1
THE SAN FRANCISCAN
MODEL SF 1 LB.
(GAS MODEL)
DATA SHEET
Maximum Hourly Capacity 3 lbs.
Weight 100 lbs.
Counter Space 17"w x 32"l x 27"h
Hot Air Exhaust 4 " diam t r pip
(50 CFM)
Voltage 110 Volts 1 PH.
Amperage 2 Amps.
Gas Line Requirements 1/4"
B U 7" NG 11" LP 10,000 BTU

SF 1LB Manual – Page 2
CAUTIONS:
Post in a promin nt location th instructions to b follow d if us r sm lls gas.
Obtain information from local gas suppli r.
—FOR YOUR SAFETY—
DO NOT STORE OR USE GASOLINE OR OTHER
FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY
OF THIS OR ANY OTHER APPLIANCE.
“Int nd d for oth r than hous hold
us .”
«Non d stiné à l’usag
dom stiqu .»
WARNING:
Improp r
installation,
adjustm nt, alt ration, s rvic
or
maint nanc can caus
prop rty
damag ,
injury or d ath. R ad th
installation,
op rating and main-t nanc
instructions
thoroughly b for installing or s rvicing
this quipm nt.
AVERTISSEMENT:
L’installation, le
réglage,
la modification, la réparation ou
l’entretien
incorrect de cet
appareil peut causer
des
dommages matériels, des blessures ou
la
mort. Lire
attentivement les
instructions
d’installation, de fonctionnement
et
d’entretien avant de
procéder à
son
installation ou
entretien.
WARNING:
El ctrical
Grounding Instructions
This applianc is quipp d with a
thr -prong
(grounding) plug for your prot ction
against
shock hazard and should b plugg d
dir ctly
into a prop rly ground d
thr -
prong
r c ptacl . Do not cut or r mov
th
grounding prong from this
plug.
AVERTISSEMENT:
Mise à la
terre
Cet appareil est pourvu d’une fiche à
trois
broches dont une mise à la terre assurant
une
protection contre les chocs électriques.
La
prise dans laquelle elle est branchée doit
être
correctement mise à la terre. Ne pas
Cooper
ni enlever la broche de mise à la terre de la fiche.
FOR 110 Volt Singl Phas 50 OR 60 HZ

SF 1LB Manual – Page 3
INSTRUCTIONS FOR OPERATING
THE SAN FRANCISCAN ONE POUND SAMPLE ROASTER
READ THOROUGHLY BEFORE ATTEMPTING TO OPERATE
Step 1:
•Switch roast r on
•Drum rotat s
•Exhaust-Cooling fan on
Step 2:
•L t run 90 s conds to air out syst m. Gr n light will com on.
Step 3:
•Turn main gas valv handl all th way count r clockwis (which is th full on
position)
•Push pilot saf ty valv down and hold Imm diat ly push r d ignitor button
num rous tim s until you h ar flam ignit
•R l as pilot saf ty switch aft r 30 s conds. Flam should stay on.
If not, r p at st p 3
Ignitor Button
Main Valve
Gas Handle Electrical
Solenoid
Valve
Pilot Safety
Valve
Push/Pull
Cooling
Knob Gas
Regulator

SF 1LB Manual – Page 4
Step 4:
•Turn gas about 1/4 to 1/2 on
•Warm up machin about 15 min. th n shut gas off not to xc d 400 d gr s
Step 5:
•Put gr n coff in hopp r 1/4 to 1 pound
•Pull cooling tray v nt knob to l ss n air flow through drum whil charging
gr n b ans
•Charg gr n b ans
•Clos cooling tray v nt
Step 6:
•Turn on gas 1/4
•Push r d ignitor till you s fir is going through th hol on sid
Step 7:
•Turn gas on 3/4 to full
•Allow t mp ratur to r ad 435 to 465 d gr s
•Ch ck roast with sampl r and obs rv color through sight glass.
•Roasting tim will rang from 12 to 16 minut s
Step 8:
•Roast compl t d
•Turn gas off
•Pull cooling tray v nt knob
•Op n door and discharg b ans
•Us sampl scoop r to stir b ans
•Clos discharg door
•L t coff cool

SF 1LB Manual – Page 5
MAINTENANCE
•Vacuum th insid of th chaff cyclon daily.
•Onc a month, apply on squirt of gr as on back b aring using a gr as gun and
hi-t mp gr as bought at your local hardwar stor .
•Onc a month r mov cov r (using an all n k y) wh r indicat d by "r mov to
cl an" sign locat d on th low r l ft sid of th roast r und r th "San
Franciscan" nam plat .
•Vacuum or blow that ar a to cl an.
•Onc v ry four months disconn ct th l ctric plug to th chaff cyclon motor
by untwisting. R mov thr all n scr ws on sid of lid (NOT SCREWS TO
MOTORS) so that th motor and lid can b r mov d from th top of th chaff
cyclon . This will nabl you to do a thorough cl aning of th insid chaff
cyclon and lid.

SF 1LB Manual – Page 6
LIMITED WARRANTY
The San Franciscan Roaster Co. warrants this product for on y ar from dat of
purchas . W will r pair without charg any d f cts du to faulty mat rial or
workmanship. Pl as r turn th compl t unit, transportation pr paid, to our
location. Th r pair d unit will b r turn d fr ight coll ct to you. This warranty
do s not apply to non-factory acc ssori s or damag caus d wh r r pairs hav b n
mad or att mpt d by oth rs.

SF 1LB Manual – Page 7
A GENERAL TIME & TEMPERATURE CHART
FOR THE UNTRAINED COFFEE ROASTER
•Warm roast r slowly from 0 to 20 minut s
•Charg coff in at 350 d gr s
•Th t mp ratur will drop to approximat ly 275 d gr s. W will call that 0
minut s.
•From 0 minut s to 5 minut s rais t mp ratur to 350 d gr s
5 minut s at 350 d gr s
8 minut s at 380 d gr s
10 minut s at 400 d gr s
12 minut s at 420 d gr s, not to xc d 450 d gr s
•Roast will b compl t d d p nding on d gr of darkn ss in a 13-14-15
minut tim fram .

SF 1LB Manual – Page 8
A GENERAL TIME & TEMPERATURE CHART
FOR THE UNTRAINED COFFEE ROASTER for ROASTERS
BEGINNING WITH SERIAL NUMBER 20001
All temperatures are from the bean probe readout (RED DIGITS).
•Warm roaster for at least 20 minutes according to instructions on page 3.
•Turn gas up to 50-80% of maximum, charge coffee in at 350°-400°F and begin timing
roast.
•Coffee will drop in temperature to approximately 170°- 200°F at around 60 to 80
seconds.
•Adjust heat so that coffee reaches first crack between 8 and 12 minutes. When this
happens will depend on your altitude, the amount and type of beans, and the ambient
temperature. First crack will become steady at approximately 370°-390°F.
If beans are not discharged, second crack will begin somewhere around 410°-430°F. If
you choose to take the beans into second crack, adjust the heat so the time between the
beginning of first crack and the beginning of second crack is somewhere between 3 and 7
minutes.
You can experiment with these times until you find the right time and temperature to
achieve the best flavor for each type of bean you roast.
NOTE: Roasters beginning with serial number 20005 do not use the analog temperature
gauge that was used in prior roasters. These roasters now use a temperature probe that is
connected to the digital readout. The air temperature is in “GREEN” digits. If the air
temperature hits 500°F the gas will automatically shut off to prevent overheating. If this
happens you may turn the roaster off for 3 seconds, then turn back on and can re-ignite
when the light turns back on.
Roasters beginning with serial number 20005 also do not use a push-pull lever to control
the air-flow damper, but rather there is a lever on the left side of the roaster (looking from
the front). When the lever is forward the air is directed through the cooling tray. When the
lever is back the air is directed through the drum. During the roasting cycle place the lever
in the back position. During the cooling cycle place the lever in the forward position.

THE SAN FRANCISCAN
MODEL SF1-LB
CLEANING GUIDE

1
SF1 Roaster Cleaning Guide
WARNING: BE SURE GAS IS TURNED OFF AND ELECTRICAL IS
UNPLUGGED BEFORE CLEANING YOUR ROASTER!!!!! FAILURE TO DO
SO MAY RESULT IN SERIOUS INJURY, PROPERTY DAMAGE, AND EVEN
DEATH!!!!
Unplugging the Roaster is Very Important!
Be Sure Gas Valve on Roaster is Turned Off its Very Important!!

2
Turn off Propane to the Roaster its Very Important!!
Turn off the Natural Gas to the Roaster its Very Important!!

3
Time to clean your Roaster!
Wipe inside and around face plate, clean with a wash cloth, soap, and water.
Remove cooling tray and wipe clean on the top and bottom with soap and water.

4
Wipe clean under the cooling tray with soap and water. Pull handle forward and clean where
the flap comes down. Arrow is pointing to flap.
Remove side door by taking off the two black cap screws with a 5/32 Allen wrench.

5
Once Door is removed wipe down the inside with soap and water be sure NOT to get too wet
inside.
Wipe completely dry when finished and place the door back on the roaster using the 5/32 Allen
wrench to put back the 2 black cap screws. Be careful to not get the air and bean probes caught
in the door. Make sure both black cap screws are tightly back in place but not too tight.

6
Next step is to remove the fan from the top of your chaff cyclone. Remove the 3 black cap
screws with a 3/16th Allen wrench. Be careful that the fan doesn’t fall off the roaster.
One of the black cap screws removed from the bottom of the fan.

7
When setting the roaster fan down be sure it’s on an even flat surface. Check to see if fan needs
to be wiped down, if so lightly use a damp wash cloth. Be careful of your fingers.
Clean the inside of the hot air exhaust vent with a vacuum or a wet wash cloth use soap and
water.

8
Using a 3/16th Allen wrench remove the 3 black cap screws and washers. (Picture is shown with
fan removed)
Top of chaff cyclone with no black cap screws, and washers are all taken off. Lid is ready to be
removed.

9
Remove black lid by lifting up if you can lift up with both hands. You can wipe down all of the lid
and around the inside with soap and water.
Vacuum inside both cylinders inside the chaff cyclone, or wipe them down with soap and water.

10
Put black lid back on and make sure the pieces look like this in order to put it correctly back on
the chaff cyclone. The arrow is pointing to show the inside of the lid to be matched up with the
feed hopper pipe.
Be sure the holes match up
Table of contents