Sanipex BAGNO DESIGN BDB-SOK-860-WS User manual

www.sanipexgroup.com
BDB-SOK-860-WS
SOAK FREESTANDING BATHTUB 1600X720X580MM WITH OVERFLOW


IMPORTANT PLEASE READ
B
L
C
x

Installation
•Before Installation
-We recommend that the installation be done by a minimum of 2 people as a
safety precaution. Also make sure to adopt the proper posture when lifting
the bath or basin.
-Adhere to all local building and plumbing codes.
-The diagrams in this guide are not construction plans. They are visual aids.
-For best results, the floor must be level and the wall must be square with the
floor.
Table of Contents
We recommend that you carefully read this guide to ensure your
bathroomware’s proper installation and reliability for many years to come.
Please ensure that your plumbing system is adequate and that you have
sufficient space to complete the installation.
We recommend that you employ a suitably qualified professional to complete
the installation of your new bathtub. We cannot accept responsibility for poor or
incorrect installation. Please keep these instructions in a safe place for future
reference.
Installation
Before Installation
Installation Requirements
Installation Notes
Feet Installation
Plumbing Installation
Freestanding Bathtub Installation

Installation
IMPORTANT! Install this product according to the installation guide. Spout must
provide a minimum of 60mm reach for adequate clearance into bath. Our
products must be installed by certified professional only and according to our
installation guide as well as federal, provincial/state and local building codes and
regulations.
•Installation Requirements
Please read the instructions carefully and follow the specified guidelines so as to
avoid any damage to the fixture.
1. The owner/user of the product must keep this information for future reference.
2. Consult local building codes to make sure the installation complies with
standards.
3. Remove the unit from its packaging. Before disposing of it, inspect the unit to
make sure it is in good shape. Should inspection reveal any damage or defect in
the finish, contact your distributor. The warranty does not cover damages or
defects in the finish once it has been installed. The Manufacturer’s responsibility
for shipping damages ceases upon delivery of the product in good order to the
carrier. All complaints regarding damage due to transport must be made.
4. Place the unit in the bathroom before you start working. Conserve all nuts and
bolts.
5. To protect the unit during installation, we recommend that you lay a piece of
cardboard on the bottom.
6. If the unit is covered with polyethylene protective film, do not remove until
installation is complete to grant maximum protection. However, remove the
film where any two surfaces will be in permanent contact.
7. Verify that all dimensions on the plan are the same as the ones of the unit.
•Installation Notes

•Feet Installation
1. Turn bath upside down on a clean carpet or blanket.
2. Place feet on points A as indicated on Figure.2
*The front and back sets are not the same.
3. Place the feet on the bottom of the bath and seal with
silicone adhesive.
4. Leave to dry for 24hrs.
5. Turn the bath upright and using a spirit level check that
bath does not wobble and stands sturdy over the drain
waste line.
•Plumbing Installation
6. Plumber inserts plug into waste hole of bath.
7. Install drain supplied with Pop Up drain kit onto waste
installed in Step 1.
8. Set up drain waste kit, apply plumbers’ putty to drain
waste basket, screw in Pop Up drain kit.
!
-The tubs weight may vary. We recommend that the installation be
done by 2 people, as a security precaution.
-Also, make sure to adopt a good posture when lifting the tub.
-The diagrams in this guide are not construction plans; they are visual
aids.
Tools
fig. 1 fig. 2
Nikki filler spout/
overflow
Soft-touch pop drain
Drain nut, use only if
tubular brass connection
is in use
Direct verticle/90
degree Elbow drain
waste

Soft-touch
pop drain
(not-included)
fig. 1 fig. 2
-The tubs weight may vary. We recommend that the installation be
done by 2 people, as a security precaution.
-Also, make sure to adopt a good posture when lifting the tub.
-The diagrams in this guide are not construction plans; they are visual
aids.
•Freestanding Bathtub Installation
1. Ensure that the drain pipe in the floor is thoroughly
cleaned before the bath is placed into position and that
the waste hole is positioned correctly.
2. Before the bath is fixed to the floor ensure that the
bath waste and the drainage pipe line up.
3. Make sure all the surfaces are dry and stable before
installing the bathtub. This will ensure durable adhesion.
4. Mark an area with tape on the floor where the bathtub
is going to stand with the template provided, the floor
can now be properly prepared.
5. Position the bathtub and connect the waste, use a spirit
level to ensure that the bathtub is level. Fill the bathtub
with water, let the water run through the waste and
check for leaks.
6. Apply sealant or silicone around the base of the bathtub
to ensure that the bath does not shift.
Tools
!

INB-SOK-860-WS-08-22
www.sanipexgroup.com
Table of contents
Other Sanipex Bathtub manuals
Popular Bathtub manuals by other brands

Whirlpool
Whirlpool Ariel ARL-702 installation manual

Kohler
Kohler K-1151 Homeowner's guide

American Standard
American Standard 3052OD.X0X Installation instructions and owner's manual

Kohler
Kohler K-1111-H2 Roughing-In Guide

Kohler
Kohler K-1158 Roughing-In Guide

Kohler
Kohler Hourglass K-1209-LA Roughing-In Guide