Savant Power Storage 20 Installation Guide
This document guides the installer through the complete installation process for the following products:
– Savant Power Storage 20 (PS20-12.5KW-100A) composed of:
Savant Power Inverter (PS-INV-12.5KW-100A-XX) &
Power Storage 20 Battery (PS20-BATT-20KWH)
– Savant Power Storage 20 (PS20-12.5KW-60A) composed of:
Savant Power Inverter (PS-INV-12.5KW-60A-NS) &
Power Storage 20 Battery (PS20-BATT-20KWH)
Document Number: 009-2401-00
Document Date: September 2023
Document Supports daVinci 10.2.3 and Higher

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 2 -
Table of Contents
To access links to the topics within this document, click the corresponding entry in the table below.
Important Safety Information....................................................................................3
1. System Introduction......................................................................................................5
2. Pre-Installation.................................................................................................................6
2.1. Utility Connected Whole Home Backup.......................................................6
2.2. Utility Connected Partial Home Backup .......................................................6
2.3. Retrofitting (AC Coupling) Existing Solar....................................................7
2.4. O Grid Installation...............................................................................................7
2.5. Installation Location .............................................................................................8
3. Physical Installation .......................................................................................................9
3.1. Tools and PPE .........................................................................................................9
3.2. Mounting the System ...........................................................................................9
3.3. Internal Wiring ...................................................................................................... 12
3.4. Battery System Installation.............................................................................. 13
3.5. External Wiring..................................................................................................... 14
3.6. Power Director Installation ............................................................................... 17
3.7. Optional Power Source Wiring....................................................................... 18
3.8. Parallel Systems...................................................................................................20
3.9. Additional Accessories...................................................................................... 22
3.10. Safety Check........................................................................................................ 26
4. Basic Operations...........................................................................................................27
5.1. Boot System ..........................................................................................................27
5.2. Shut Down System............................................................................................. 28
5.3. Reboot System .................................................................................................... 28
5. System Commissioning ............................................................................................. 29
6. Troubleshooting...........................................................................................................30
7. Warranty and Service ................................................................................................ 32
Appendix - Single Line Diagrams.......................................................................... 33

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 3 -
Important Safety Information - Read First
Before installing, configuring, or operating any equipment, Savant recommends
that each dealer, integrator, installer, etc. access and read all relevant technical
documentation. Savant Power technical documentation can be located
by visiting savant.com/power. Vendor documentation is supplied with the
equipment.
Read and understand all safety instructions, cautions, and warnings in this
document and the labels on the equipment.
Safety Statements
Read this entire document before installing or using Savant Power Storage 20.
Failure to read or follow any of the instructions or warnings in this document
can result in personal harm, including death, or damage to the product,
potentially rendering it inoperable.
DANGER!
–A battery can present a risk of electrical shock, fire, or explosion
from vented gases. Observe proper precautions.
–Savant Power Storage 20 must be installed by only Savant
authorized persons who have been trained in working with high
voltage electricity.
–Use Savant Power Storage 20 only as directed.
–Do not handle the device or its components with wet hands,
otherwise electric shock or death may occur.
–Do not use Savant Power Storage 20 if it is defective, appears
cracked, broken, (or otherwise damaged) or fails to operate.
–Never work on the system without first entirely powering down the
system and shutting o and locking out any power supplies to the
inverter.
–To protect the product and its components from damage when
transporting, handle with care. Do not impact, pull, drag, or step
on Savant Power Storage 20. Do not subject Savant Power Storage
20 to any high forces. To help prevent damage, leave Savant Power
Storage 20 in its shipping packaging until it is ready to be installed.
–Any installations must comply with The National Electric Code (NEC)
and local codes.
–Do not insert foreign objects into any part of the Savant Power
Storage 20.
–Any installation must comply with specifications for wire types,
conductor sizes, electrical and thermal insulation, branch circuit
protection, grounding, and disconnect devices.
CAUTION!
–Do not paint any part of Savant Power Storage 20, including any
internal or external components such as the exterior shell or casing.
–When installing Savant Power Storage 20 in a garage or near
vehicles, keep it out of the driving path. It shall be standing on the
floor. If possible, install Savant Power Storage 20 on a side wall.
–Ensure installation is compliant with local and national electrical
codes.
Safety Classifications In this Document
NOTE:Provides special information for installing,
configuring, and operating the equipment.
DANGER!
Indicates a potentially hazardous situation which, if
not avoided, could result in injury, death, or damage
to Savant Power Storage 20.
IMPORTANT!
Indicates potentially hazardous situation which, if
not avoided, could result in medium/slight injury or
damage to Savant Power Storage 20.
CAUTION!
Provides special information for avoiding situations
that may cause damage to equipment.

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 4 -
Electronic Waste Information
This symbol on the product or on its packaging indicates that this
product must not be disposed of with normal household waste. It is
your responsibility to dispose of electrical waste in a manner that is
consistent with local guidelines.
For more information about where you can drop o waste
equipment for recycling, please contact your local city oce, waste disposal
service, or the shop where you purchased the product.
FCC Compliance
This device complies with Part 15 of the FCC Rules. Operation is subject to the
following two conditions:
1. This device may not cause harmful interference, and
2. This device must accept any interference received, including
interference that may cause undesired operation.
DANGER! Changes or modifications not expressly approved by the party
responsible for compliance could void the user’s authority to operate
the equipment.
RF Warning Statement
The device has been evaluated to meet general RF exposure requirement.
The device can be used in portable exposure conditions without restriction.

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 5 -
1. System Introduction
The Savant Power Storage 20 is an all-in-one energy solution that acts as a power control system to manage a variety of interconnected power sources
alongside an energy storage system to enable energy resiliency in the event of grid disruptions and significant costs savings during every-day operation.
The Savant Power Storage 20 is composed of three main components:
–Savant Power Inverter
–Savant Power Storage 20 Battery
–Savant Power Director
For Savant Power Storage 20 inverter and battery parts and features, see the Savant Power Storage 20 - 60A Quick Reference Guide or Savant Power
Storage 20 - 100A Quick Reference Guide on the Savant Customer Community.

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 6 -
2. Pre-Installation
2.1. Utility Connected Whole Home Backup
Osets power consumption while providing backup power for the whole home during a utility disruption. Requires enough battery and inverter
capacity to power all backed up loads. Can be installed with or without solar sell back (“Net-Metering”) enabled.
IP Network
Load Center
+
Savant Power Modules Power Storage 20
Service Entry
Rated Disconnect
Smart Meter Utility Service
Automated Start
Whole Home Generator
Optional
DC Solar
Optional
Power Director
2.2. Utility Connected Partial Home Backup
Osets power consumption while providing backup power for the most critical loads during a utility disruption. May enable a smaller system to be
installed. Can be installed with or without solar sell back (“Net-Metering”) enabled.
IP Network
Power Director
Sub Panel
+
Savant Power Modules Power Storage 20
Smart Meter Utility Service
Generator
Optional
DC Solar
Optional
Main Service Panel
(Non-backed up)
Automated Start

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 7 -
2.3. Intregrating (AC Coupling) Existing Solar
Easily integrate existing grid tied solar installations with o-grid resiliency and time-of-use optimization.
NOTE: AC Coupled solar may land in the load center as pictured in the diagram below, or directly into the GEN input of the Savant Power Inverter.
Contact Savant engineering for more information about how to integrate a generator with an AC Coupled system.
IP Network
Load Center
+
Savant Power Modules
Power Storage 20
Service Entry
Rated Disconnect
Smart Meter Utility Service
Solar
Power Director
AC Coupled
Solar
2.4. O Grid Installation
Generate 100% of energy consumed on-site. Ideal for scenarios where utility is not available, or interconnection is not possible.
IP Network
Load Center
+
Savant Power Modules
Power Storage 20
Power Director
Automated Start
Whole Home Generator DC Solar

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 8 -
2.5. Installation Location
The components of the Savant Power Storage 20 shall be installed in a location that is suitable for use. Installing the system in a manner inconsistent
with the guidance given below may void system warranty. The following items should be considered when installing the Savant Power Storage 20:
–The Savant Power Storage 20 is built with NEMA 4X enclosure, enabling outdoor install locations. Choose an installation area where ambient
temperature remains between 32°F to 114°F (0°C to 46°C) and out of direct sunlight. Exposing the system to temperatures outside of this range
can negatively impact the longevity of the equipment and will void the warranty.
–Choose a flat, horizontal foundation against a wall without potential exposure to overhead water sources, snow accumulation or flooding.
IMPORTANT! Concrete anchors are included with each system to allow the system to be secured to the foundation.
–Reserve enough space for maintenance requirement for each side of the unit.
–Ensure enough clearance around the system and space between multiple Savant Power Storage 20 units to correspond with National Electric
Code (NEC) and local requirements.
Maintenance Space Requirements
36in
(92cm)
11.8in
(30cm)
8.0in
(20cm)
Example shows the maintenance space requirements for a right entry cabinet. Actual maintenance space requirements may vary.

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 9 -
3. Physical Installation
3.1. Tools and PPE
–Rotary hammer drill with
3/8in and 1/2in drill bits
–5/32in or 4mm hex screw
driver
–Philips screw driver
–Rubber hammer
–1/8in or 3mm flat head
screw driver
–Cable cutter
–Measuring tape
–Leveling instrument
–Vacuum
–Insulated gloves
–Safety goggles
–Safety shoes
–Dust mask
–Multimeter
–Marker
–17mm socket wrench
–Optional Accessories
3.2. Mounting the System
The following installation instructions are for a right-entry (PS20-BATT-20KWH-ENCL-XX) cabinet. For parallel systems, a left-entry (PS20-BATT-
20KWH-ENCL-LEFT-XX) cabinet may be used where batteries are inserted from the opposite side.
CAUTION!
–Dust collection required during drilling.
–Make sure the cabinet is firmly on the floor. The wall bracket is only designed to keep the battery system from tipping forward and cannot
support the weight of the battery.
1. Open the battery enclosure with a PH2 Philips screwdriver and remove the accessories kit.
2. Assemble the bracket as shown using M5x12 screws.
3. Attach the bracket to the back side of the battery system with M5x12 machine screws. Torque: 44 lb-in (5 N*m).
13
2

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 10 -
4. (OPTIONAL, Per Local Code) Drill a 0.5 in (25mm) hole with a 2 in (50mm) depth. Embed the anchor expansion bolts and ax the cabinet to
the ground. Use included cardboard template and take note of spacing between unit and wall to allow for the bracket.
5. Install bracket and battery system on the wall with M6x50 tapping screws.
NOTE: If installing on a concrete wall, properly drill into the wall with M6x50 expansion anchor screws.
6. Remove the battery seal cap (BAT/COM) on the bottom of Savant Power Inverter.
7. Hang the inverter on the bracket.
547
305mm
(12in)
406mm
(16in)
6

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 11 -
9
8. Fasten Savant Power Inverter and the battery cabinet with conduit and screw kits.
9. Fasten the inverter and the bracket with M5x12 machine screws. Torque: 26.5 lb-in (3 N*m).
10. If the inverter is installed separately from the battery system, use the bracket to mount inverter. Install the bracket on the wall with M6x50
tapping screws, hang on bracket, and fasten it with M4x16 screws.
NOTE: If you are installing it on a concrete wall, drill into the wall and attach with M5x12 tapping screws.
11. If the battery system is installed separately from inverter, the bracket for battery system is required. Attach the bracket to the back side of the
battery system with M8x16 machine screws. Torque: 44 lb-in (5 N*m). Install the bracket on the wall with M6x50 tapping screws.
NOTE: If you are installing it on a concrete wall, drill into the wall with M6x50 expansion anchor screws.
10
10
11
8
16in
12in

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 12 -
L1 NL2 L1 NL2 L1 NL2
RS232
DC 12V
BCMS
RS485-1C-LEDSIMSD
RESET
USB4
USB3
GPS
USB2
NETWORK
LHG
DC 12V DC 12V
C-LED
P S G
UPCS
GBA
DC 12V
TR
RS232
G
RSD
DC- DC+REF
BAT- BAT+REF
PV1+ PV1- PV2+ PV2-
CAN
CAN
DC 12V
DC-DC+ REF L1 N L2 L1 N L2 L1 N L2
BAT-BAT+ REF
PV1+ PV1-PV2+ PV2-
LHG
DC 12V DC 12V C-LED
PS G
UPCS
GBA
TR
RS232
G
GROUND
GROUND
REF
BAT+
DC 12V
BAT/COM TO
BATTERY STORAGE
WIRING
BAT-
BCMS TO CAN
DC 12V
CAN
DC 12V
GROUND
BAT/COM TO
INVERTER WIRING
REF BAT- BAT+
REF
BCMS TO CAN
BAT+
BAT-
DC 12V
3.3. Internal Wiring
1. Unfasten the screws from the battery storage wiring cover and wiring panel of the
Savant Power Inverter using a 4mm hex screwdriver, removing both cover plates.
2. Connect the inverter to the battery system with ground wire, Torque: 26.5 lb-in (3
N*m) feeding the ground wire through the BAT/COM to the battery storage wiring
panel.
3. Connect power, 12V DC and communication cables from the battery system to the
inverter. Insert the wires according to the corresponding colors of the silkscreen on
the terminal.
NOTE: Conductor colors of the 60A unit will dier from the installation guide.
2
CAN
DC 12V
1

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 13 -
3.4. Battery System Installation
1. Open the Battery Access Door with a hex screwdriver.
2. Number all battery labels with a number 1-8.
3. Install battery 8 in the bottom battery slot. Then continue to install all batteries in ascending slots in reverse numerical order, with battery 8 on
the bottom and battery 1 in the top. See the diagram below for reference.
NOTE: Always keep the batteries connected in the order that they were originally installed.
4. Fasten all modules on both sides using M4x8 screws. Torque: 10 lb-in (1.2 N*m).
NOTE: Do not install the door on the cabinet until installation has been completed and the system has been tested for proper function.
1
1
2
3
4
5
6
7
2
8
3

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 14 -
3.5. External Wiring
CAUTION! All cables shall be connected in sequence as listed in this manual.
1. Make all grid, generator and load connections as shown in the single line diagrams in Appendix: Single Line Diagrams.
NOTE: Savant Power Inverter includes a built-in RSD transmitter. Please contact Savant for supported models of RSD receivers. If the Savant
Power Storage 20 is placed near the main panel, the PV disconnect (PV switch) on the Savant Power Inverter can be used as an RSD Initiation
Device.
If the Savant Power Storage 20 is placed far from the main panel, it is recommended to use the Emergency Switch as an RSD Initiation Device.
CAUTION! In areas with frequent lightning storms, a Class 2 SPD (Surge Protection Device) shall be installed in front ends of both Solar
and Grid inputs.
2. Refer to the table below for minimum copper wire sizing and ratings.
Voltage Temperature Class Gauge
AC 600V 75°C/167°F 2AWG (33.6mm2)
Ground 600V 75°C/167°F 6AWG (13.3mm2)
PV/Battery 600V 75°C/167°F 10AWG (5.26mm2)
RSD Option 2 / 12Vdc /
AFCI Communication
30V 60°C/140°F 24AWG (0.204mm2)
CAT5 Ethernet 30V 60°C/140°F Standard Ethernet cable
3. Refer to the table below for minimum external circuit breaker sizing and ratings.
Voltage Current Rating
AC 600V 100A
PV 600V 30A
RSD Option 2 30V 1A
NOTE: If smaller-size wires and breakers are to be used for AC connection, grid output current can be configured via the Savant Power Storage
app. Please contact Savant Support to confirm your configurations.

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 15 -
DC- DC+ REF L1 NL2 L1 NL2 L1 NL2
BAT- BAT+ REF
DC 12V
BCMS
RS485-1
DC 12V
DC 12V
CAN
DC 12V
DC- DC+REF L1 N L2 L1 N L2 L1 N L2
BAT-BAT+ REF
PV1+ PV1-PV2+ PV2-
LHG
DC 12V DC 12V C-LED
PS G
UPCS
GBA
TR
RS232
G
4. Connect Savant Power inverter to ground. Torque: 26.5 lb-in (3 N*m).
5. Connect Savant Power Inverter to the grid.
DANGER! Generators shall NOT be connected through the grid interface. The bidirectional energy flow through the grid interface will result
in damage and malfunctioning of the generator.
6. Connect output of generator or AC coupled solar inverter to GEN terminals of inverter. Follow the instructions on the Savant Power Storage app
for wiring and setting of generator automatic control.
NOTE: System must be programmed for appropriate connected power source. Programming details can be found in the Savant Power Storage
App Setup Guide on the Savant Customer Community.
4
5
6

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 16 -
7. Make load connections from Savant Power Inverter to load.
8. Make photovoltaic array connections from the Savant Power Inverter as shown below.
CAUTION! Do not connect the positive or negative PV connections to ground. Doing so may damage the inverter.
9. Connect the communication cable to RS232 port and 12Vdc power cable to DC 12V port.
10. Connect Savant Power Inverter to a router or Savant Power Director using a CAT5 or higher Ethernet cable.
NOTE: Use waterproof port where required.
11. For systems with connections to AC coupled PV Inverter, and/or multiple parallel applications, see section 3.6.
C-LED
P S G
UPCS
GBA
DC 12V
TR
RS232
G
RSD
I O
DC 12V
DC 12V
CAN
HFG CW G G SW L
L1 NL2 L1 NL2 L1 NL2
RS232
DC 12V
BCMS
RS485-1C-LEDSIMSD
RESET
USB4
USB3
GPS
USB2
NETWORK
CONNECTIONS
TO LOAD
CONNECTIONS TO
PHOTO VOLTAIC
ARRAY
CONNECTIONS TO
PHOTO VOLTAIC
ARRAY
DC- DC+REFBAT- BAT+REF
PV1+ PV1- PV2+ PV2-
CONNECTION
TO ROUTER OR
DIRECTOR
RS232 CONNECTION
DC 12V CONNECTION
7
8
9
10

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 17 -
3.6. Power Director Installation
Refer to Savant Power & Light App Deployment Guide and Savant Power Quick Reference Guide on the Savant Customer Community for more
detailed instructions regarding installing and configuring the Savant Power Director.
1. Install Director in appropriate location using the included bracket.
NOTE: It is recommended to install the Director within 10ft (3m) of any load center with Power Modules included. If Power Modules will be
installed in numerous panels, a Panel Bridge Controller (PBC) will be required. Contact Savant support for more information.
2. The Savant Power Director and Savant Power Inverter communicate over IP. Connect the PoE port of Director to the Network Port of inverter.
NOTE: If using the Director over WiFi, the router may be omitted.
3. Commission the Director according to the Savant Power & Light App Deployment Guide.
L1 NL2 L1 NL2 L1 NL2
RS232
DC 12V
BCMS
RS485-1C-LEDSIMSD
RESET
USB4
USB3
GPS
USB2
NETWORK
DC- DC+REF
BAT- BAT+REF
PV1+ PV1- PV2+ PV2-
Network Switch
MAIN
NETWORK
Power Director
PoEGPIO 5VDC
C-LED
P S G
UPCS
GBA
DC 12V
TR
RS232
G
RSD
I O
DC 12V
DC 12V
CAN
HFG CW G G SW L

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 18 -
3.7. Optional Power Source Integration and Wiring
3.7.1 Generator Integration
The Power Storage 20 is designed to integrate seamlessly with an on-site generator to provide additional resilience.
1. Land the AC output of the generator into the GEN input of the inverter (L1/L2/N).
2. If using a whole home generator with two-wire start, wire the Energy Management System (EMS) as shown:
NOTE: Other generators are supported with dierent wiring configurations; contact Savant support for more information.
3. Use the Savant Power Storage app to program the auto-start and stopping parameters of the connected generator.
L1 NL2 L1 NL2 L1 NL2
RS232
DC 12V
BCMS
RS485-1C-LEDSIMSD
RESET
USB4
USB3
GPS
USB2
NETWORK
CONNECTIONS
TO GENERATOR
AC OUTPUT
DC- DC+REF
BAT- BAT+REF
PV1+ PV1- PV2+ PV2-
N01
COM2
N02
DI1
DI3
NC1
COM1
NC2
DI2
COM
CONNECTIONS
TO GENERATOR
C-LED
P S G
UPCS
GBA
DC 12V
TR
RS232
G
RSD
I O
DC 12V
DC 12V
CAN
HFG CW G G SW L
1
2

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 19 -
3.7.2 AC Coupled Solar Wiring
The Savant Power Storage 20 enables easy integration of a grid tied solar installation to enable continued solar production in a grid down scenario. It
is recommended to use a UL 1741SA compliant inverter when AC coupling into the Savant Power Storage 20.
CAUTION! Do not interconnect a generator to a system that is installed with AC Coupled solar attached as it can lead to damage to the
generator and inverter!
1. Land the output of the AC coupled solar inverter into the GEN input of the inverter or into the backed-up load center.
NOTE: The PS-INV-12.5KW-60A-XX model will only support AC coupling into the backed-up load center whereas the PS-INV-12.5KW-100A-XX
can support either location
NOTE: Paralleled systems should only have AC coupling into the GEN input of the inverter.
2. Use the Savant Power Storage app to program the parameters of the AC coupled system.

Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 20 -
3.8. Parallel Systems
The Savant Power Storage 20 can support multi-unit installs with all units operating in parallel to increase the available power and storage for a
single site installation. The Appendix provides single line diagrams giving a high level overview of parallel system configuration.
NOTE: Systems with a model number ending in ‘NS’ do not support parallel configuration. Please contact Savant support for more information.
1. Wire internal components for all units in system in alignment with section 3.3.
2. Wire DC coupled solar to each unit independently.
NOTE: It is recommended to balance solar input across the systems used in a parallel configuration for optimal performance.
3. Combine the Load Output of all units at a single location before landing in the backed-up loads panel.
4. Connect CAT5 or CAT6 cable between the external RJ45 ports marked ‘Parallel’ between each inverter in the system.
NOTE: External Parallel ports are equivalent and can be used interchangeably.
5. Install the included resistors in the first and last system of the parallel install. Make sure to tighten the RJ45 port where resistors are installed.
6. Assign one of the units in the system as the “Leader” of the system. Additional systems will be designated as “Followers”.
7. Wire all optional accessories (generator auto-start, E-Stop Button, etc) to the Leader of each parallel installation. See more about accessories in
section 3.8.
LeaderFollowerFollower
PARALLEL
Table of contents
Popular Storage manuals by other brands

Hewlett Packard Enterprise
Hewlett Packard Enterprise ProLiant DL20 Gen10 Maintenance and service guide

Western Digital
Western Digital Ultrastar Data102 Configurations

Lenovo
Lenovo ThinkSystem DE Series manual

SECUDRIVE
SECUDRIVE USB OFFICE/CAD user guide

Panasonic
Panasonic microP2 user guide

Huawei
Huawei FusionModule1000A20 installation guide