B.) Installing the ScaleBlaster Control BoxPage 4Selecting the Installation Location and Mounting the ScaleBlaster UnitPLEASE READ THE ENTIRE MANUAL BEFORE BEGINNING INSTALLATION. THE LOCATION OF THE SIGNAL CABLE AND THE CONTROL BOX ARE CRITICAL WITH RESPECT TO PRODUCT PERFORMANCE.1.) The unit should be installed by a licensed electrician, and the installation should meet all local and national codes.2.) The best place to install the unit is on the main water line entering the facility, or on the line serving the relevant portion of the facility. First determine where the signal coils will be wrapped. This should be on a straight section of pipe (no elbows, tees, valves or couplings) that is at least four (4) feet long. Also, very important, the signal coils should be at least three (3) feet from any major source of electrical interference. The unit is splash-proof and can be installed outside if necessary. However, in this case a cover should be installed above the unit, and the unit should be kept out of direct sunlight.3.) Mount the control box as close as possible to where the signal wire will wrap on the pipe, so that the cable is as short as possible.4.) The control box, which has a 15-ft. power cord, should be mounted on a wall or other solid surface in a location near an electrical outlet or other power source. The unit is heavy and a sturdy installation is required. We recommend that you use a 3/8" lag and washer for each of the four mounting feet. (See photos below.)5.) Upon being plugged in, the unit will work automatically on either 120 VAC or 240 VAC.NOTE: If you have any questions about installation, contact your dealer or Clearwater Enviro Technologies, Inc. for assistance.Photo 1 - recommended 3/8" mounting lag with washer.Photo 2 - one of the four control box mounting feet.Downloaded from www.Manualslib.com manuals search engine