
5 Connecons
(1) USB B (for future funcons)
(2) USB A (for future funcons)
(3) PC/Ethernet (SmartWeb configuraon)
Default IP address: 192.168.1.100
(4) Fieldbus connecon (for future funcons)
(5) Ethernet 1 (internal ProLink communicaon)
(6) Power supply connecon
ProLink CPU Module
Connecon overview
1 General safety informaon
Read this document carefully before seng up the
Schaeffler ProLink device. Keep the document during
the enre service life of the device.
Adhere to the operang instrucons and the technical
data. Otherwise personal injury or damage to property
may occur.
The device must be suitable for the planned applicaons
and for the environmental condions without any
restricons.
Only use the device for its intended purpose (see
Funcons).
The manufacturer assumes no liability and warranty
for any consequences caused by incorrect use of the
device.
The device must be installed and electrically connected,
set up, operated and maintained by qualified and
authorised specialists.
Protect the device units and cables against damage.
2 Funcons
The ProLink CPU module collects data from the vibraon
modules and converts the data into characterisc values
and trends. Via the SmartWeb soware, this data can be
directly analysed on the device.
Electrostac discharge
The device contains components that can be damaged or
destroyed by electrostac discharge. To safely avoid
electrostac discharge, you must operate the device on a
grounded mounng rail. When handling the device observe
the required safety precauons against electrostac
Contact voltages and ambient condions
Mount the device in a control cabinet to protect it from
dangerous contact voltages and ambient condions. The
installaon of the control cabinet must be in accordance
with local and naonal regulaons.
3 Installing the device
1. Ensure that the device is disconnected from power.
2. Mount the device vercally in a control cabinet on a
35 mm DIN mounng rail.
3. Leave enough space between the device and the top
and boom of the control cabinet to ensure good
venlaon.
1. Connect the VDC power supply unit to the power supply
connecon of the CPU module.
2. Connect the power supply connecon of the CPU
module to the connecon of the vibraon module.
Please note the maximum cable lenght of 3 meters. See
also the illustraons in Connecons and Wiring.
4 Connecng the power supply
Electrical connecon
The device must be connected by a qualified electrician.
The local and naonal regulaons for the installaon of
electrical devices must be adhered to. 6 Wiring
1 2 3 4
1
3
Front view Top view
Top view
2
4
5
6
discharge (ESD) in accordance with EN 61340‐5‐1 and
IEC 61340‐5‐1.