
Flip
1 3
5
2
Spinner Base
>Top
>Boom
Place panels in spinner
base with top side up
Align medium sized holes on Lazy
Susan Side “B” to pre-drilled holes
on Spinner Base
Rotate Side “A” 90° to access
remaining attachment points.
Spinner Top
Attach Spinner Top
& Bottom
(x6)
Aach by screwing the self-drilling
screws through the holes in the top
& boom and into the panels.
(You will create new holes in the panels)
Spinner Base
A
B
Large holes provide through access
to fastening holes
Use MEDIUM sized fastening holes
Large
Small
Medium
Side A
4Fasten first
two points with
through holes
Spin
90°
Side A
(x2)