LM1099EA
5. Precautions for use
・Before installation the column, replace the liquid in the system with the mobile phase to be used.
・Tubing must have flat ends and must bottom out in the column endfitting. Tubing must be connected to the column
correctly to avoid creating a void between the column frit and tubing, which can cause a leak and result in poor
column performance.
・Install the column according to the direction of the arrow.
・Do not remove the column from LC system before the pressure drops zero.
・Flow rate direction of mobile phases is as indicated on the column label.
・Avoid using a column repeatedly near the pressure limit or making abrupt changes in pressure to prevent shortening of
the column life. The degradation of column performance is likely to occur when used at higher temperatures.
・Please flow the mobile phase at an initial flow rate 0.1 mL/min(0.01 mL/min for PS-80H 250 x 2.0) in order to avoid
the danger of sudden pressure increases.
・Metal ion and amino compounds in sample or mobile phase may degrade the column performance. Please use guard
column in order to avoid the above trouble.
・Do not subject to shock such as dropping, etc.
・Performance of the column should be carried out in accordance with the enclosed “COLUMN
PERFORMANCE REPORT”.
6. Column cleaning and regeneration
When the column performance deteriorates, try cleaning the column using regeneration solution as below at 0.5
mL/min(0.03 mL/min for PS-80H 250 x 2.0) at 50℃ for 2 hours.
(Regeneration column performance)
7.Column storage
・Do not allow the column packing material to dry out.
・Close the column with end stop plugs tightly and store at cool and dark place.
・If it will not be used for a long time, flow the mobile phase at a flow rate of 0.5 mL/min (0.03 mL/min for PS-80H
250 x 2.0) for about 1 hour at least once a month.
ULTRON series packed columns are shipped under highly controlled conditions. However, if you should find any
defect, please contact your dealer or Shinwa.
Note that Shinwa does not warrant the product against column life or deterioration caused by the failure to follow the
above instructions.
50-2 Kagekatsu-cho, Fushimi-ku, Kyoto 612-8307 JAPAN
TEL +81-75-621-2360 URL https://shinwa-cpc.co.jp