
VGE B.V. • Nieuwe Eerdsebaan 26 • 5482 VS Schijndel Netherlands • +31 88 222 1 999 • info@vgebv.nl • www.vgebv.com
VGEM005-GB190
Pag. 4/116
Installation & User Manual
4.5.3 HMI (Human Machine Interface) ............................................................................................32
4.5.4 Menu structure.......................................................................................................................32
4.5.5 Notifications ...........................................................................................................................41
4.5.6 Default settings......................................................................................................................41
4.5.7 Control options.......................................................................................................................42
4.6 Accessories ..................................................................................................................................43
4.6.1 Lamp tester............................................................................................................................43
4.6.2 Mercury collector ...................................................................................................................43
4.6.3 Face protection......................................................................................................................43
4.6.4 Gloves ...................................................................................................................................44
4.6.5 Torque screwdriver ................................................................................................................44
5Technical data .....................................................................................................................................45
5.1 General.........................................................................................................................................45
5.2 System specific.............................................................................................................................45
5.3 Control..........................................................................................................................................45
5.4 System specific.............................................................................................................................46
5.5 Time sequence diagram...............................................................................................................47
5.5.1 Normal conditions ..................................................................................................................47
5.5.2 UV warning and alarm ...........................................................................................................48
5.5.3 Lamp failure...........................................................................................................................49
5.5.4 No or stopped flow (with flow switch) .....................................................................................50
5.5.5 Water temperature warning and alarm...................................................................................51
5.5.6 Radiation chamber and/or control panel overheating .............................................................52
6Installation............................................................................................................................................53
6.1 Application examples ....................................................................................................................53
6.2 Mechanical installation..................................................................................................................54
6.3 Installation drawings .....................................................................................................................56
6.3.1 Vertical pipes .........................................................................................................................56
6.3.2 Horizontal pipes.....................................................................................................................57
6.4 Bypass installation ........................................................................................................................58
6.5 Corrosive water.............................................................................................................................59
6.6 Lamp socket assembly .................................................................................................................60
6.7 Lamp installation...........................................................................................................................61
6.8 Electrical installation .....................................................................................................................63
7Starting up a VGE Pro UV system .......................................................................................................65
7.1 Mains voltage................................................................................................................................65
7.2 Menu settings ...............................................................................................................................66
7.3 Water in the system ......................................................................................................................66
7.4 Cooling of the UV system..............................................................................................................66