18. Remove factory coil spring and replace with new Softride® rear coil
springs. Be sure to retain the upper bump stop as shown. (See Photo
#13)
20. Re-Attach track bar and brakelines. Install new Skyjacker sway bar end
links. Install using the bushings and hardware supplied. (See Photo #14)
21. Install new rear shocks. (See Arrow in Photo #15)
22. Install tires/wheel and lower vehicle to the ground
FINAL NOTES:
* After installation is complete, double check that all nuts and bolts are
tight.
* Check to ensure there is adequate clearance between All rotating,
mobile and fixed members. Check clearance between inner side
wall of tires.
* Ensure there is adequate clearance between exhaust and brake
lines, fuel lines, fuel tank, floor board, and wiring harnesses. Check
steering gear for interference and proper working order. Inspect
brake lines for damage and adequate clearance. Test brake system.
* With the vehicle on the floor, cycle steering lock to lock and inspect
steering, suspension, drive line and brake line systems for proper
operation, tightness and adequate clearance.
* Front end realignment is necessary so have a qualified alignment
center realign front end to factory specifications.
Photo #13
Photo #14
Photo #15
I-FJ730ST Pg 3