Skytrac DSAT-300 Series Use and care manual

DSAT-300 Battery Replacement Instructions
DOC0595
Applies to: 108-300-01, 108-300-02
Document Revision: 01.000
Dec 15, 2009
SkyTrac Systems Ltd.
200-170 Rutland Road
Kelowna, BC Canada
Tel. +1 250 765-2393
Fax +1 250 765-3767
Web: www.skytrac.ca
Copyright © 2009 SkyTrac Systems Ltd.
All rights reserved.

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 2 of 21
Restricted Proprietary and Confidential Information
Proprietary Notice: The Information contained in this document is
proprietary and confidential to SkyTrac Systems Ltd.
Document Revision History
Rev Page
Description Date Author Approval
01.000
237 Initial Release Dec 15, 2009 CB T. Ratch

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 3 of 21
Restricted Proprietary and Confidential Information
Table Of Contents
1 Battery Replacement Procedures..............................................................................4
2 DSAT-300E...................................................................................................................4
3 DSAT-300I ..................................................................................................................14

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 4 of 21
Restricted Proprietary and Confidential Information
1 B
ATTERY
R
EPLACEMENT
P
ROCEDURES
The battery replacement procedure is given as a number of steps below. The actual
appearance of parts may differ from those shown. Pictures are for reference only.
2 DSAT-300E
Note: To avoid damage to the unit due to Electro Static Discharge (ESD) the battery
replacement should be performed in an ESD controlled environment, i.e. on an electrically
conductive mat with the person performing the replacement using an ESD strap connected
to the mat/ground at all times. Avoid touching the circuit board and its’ components.
1. Unfasten and remove the screws from the DSAT-300 at 6 locations using a #1
Phillips head screw driver (screw: Phillips #4-40). Retain the screws for later use.
Figure 1–Screw Locations
2. Turn the DSAT-300 over and lift the top enclosure from the right side as shown in
Figure2
, creating a hinge on the left end of the enclosure.
Figure2–Unhinging theEnclosures

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 5 of 21
Restricted Proprietary and Confidential Information
3. Hold the top enclosure perpendicular to the bottom enclosure as shown in
Figure3
.
Figure3–PerpendicularPosition
Note: It is recommended to ensure that the Top Enclosure is held (or rested against a
wall) on top of the bottom enclosure similar to the Figure below in order to avoid the
connectors otherwise the connectors can short components on the microprocessor.
Figure4–RecommendedEnclosure“Resting”Position

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 6 of 21
Restricted Proprietary and Confidential Information
4. Disconnect the Batteries from the PCB.
Figure5–Disconnecting theBatteries
5. Release the batteries from between the battery cross bar and battery mounting
foam.
Figure6–BatteryRelease

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 7 of 21
Restricted Proprietary and Confidential Information
6. Slip the battery connectors under the battery cross bar where there is no heat shrink
(mid region) and remove the batteries as shown in
Figure7
.
Figure7–BatteryRemoval
7. Take one of the replacement batteries and bend the cable around the front face to
the right as shown in
Figure8
.
Figure8–BatteryCable Bend

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 8 of 21
Restricted Proprietary and Confidential Information
8. Bend the cables to the side with a loop as shown in
Figure9
.
Figure9–BottomBatteryCable Bends
9. Repeat steps 7 and 0 for the second battery but to the left this time to get a battery
with cables bent to the left as shown in
Figure10
.
Figure10–Top BatteryCable Bends

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 9 of 21
Restricted Proprietary and Confidential Information
10. Take the battery with its cables bent to the right and slide its connector underneath
the battery cross bar as shown in
Figure11
.
Figure11–BatteryConnectorTuck
11. Position the battery between the battery mounting foam and the battery cross bar
ensuring that the body is tangent to the mounting standoffs of the enclosure as
shown in the Figure below.
Figure12–BatteryPosition

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 10 of 21
Restricted Proprietary and Confidential Information
12. Orient the battery so that the battery cable and its circuit are upwards as shown in
Figure13
. This will eliminate assembly collisions.
Figure13–BatteryOrientation
13. Connect the battery connectors to their nearest receptacle. Ensure that the Bottom
battery cable is over top the GPS cable as shown in
Figure14
.
Figure14–BatteryConnection

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 11 of 21
Restricted Proprietary and Confidential Information
14. Repeat the above steps for the second battery, the battery installation should now
look like
Figure15
.
Figure15–BatteryInstallation Complete
15. Lower the top enclosure onto the bottom enclosure creating a pivot at the right end
as shown in the
Figure17
.
Figure16–LoweringtheEnclosures
Note: The IRIDIUM® modem is to be sandwiched between the batteries.

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 12 of 21
Restricted Proprietary and Confidential Information
Figure17–EnclosurePivotingat RightSide
16. Before mating the top and bottom enclosure together ensure that the Iridium Cable
is tucked beneath the battery cross bar. Refer to
Figure18
.
Figure18–IridiumCable Tuck

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 13 of 21
Restricted Proprietary and Confidential Information
17. Slowly clamp the top and bottom enclosures together until they are slightly ajar or
fully shut, similar to similar to
Figure19
.
Figure 19 –Enclosure AssemblyGap
18. Turn the assembly over and fasten the top and bottom enclosures together at 6
places using #4-40 screws from step one.
Warning: Do not exceed a torque of 3.2 in-lbs when fastening the enclosure together.

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 14 of 21
Restricted Proprietary and Confidential Information
3
DSAT-300I
1. Unfasten and remove the screws from the DSAT-300 at 6 locations using a #1
Phillips head screw driver (screw: Phillips #4-40). Retain the screws for later use.
Figure 20 – Screw Locations
2. Turn the DSAT over and lift the top enclosure from the right side as shown in
Figure
21
, creating a hinge on the left end of the enclosure.
Figure21–UnhingingtheEnclosures

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 15 of 21
Restricted Proprietary and Confidential Information
3.
Hold the top enclosure perpendicular to the bottom enclosure as shown in
4.
Figure22
Figure22–PerpendicularPosition
5. Disconnect the Batteries from the PCB and remove the top enclosure assembly.
Figure23–DisconnectingtheBatteries

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 16 of 21
Restricted Proprietary and Confidential Information
6. Release the batteries from between the battery cross bar and battery mounting
foam.
Figure24–BatteryRelease
Slip the battery connectors under the battery cross bar where there is no heat shrink
(mid region) and remove the batteries as shown in
7.
Figure25
.
Figure25–BatteryRemoval

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 17 of 21
Restricted Proprietary and Confidential Information
8. Take the new battery and tuck its connector underneath the Battery Cross Bar.
Figure26–BatteryConnectorTuck
9. Bend the Battery Cable around the front face of the Battery as shown in
Figure
27.
Figure27–BatteryCable Position
10. Position the Battery between the cross bar and mounting foam and ensure that the
battery is tangent to the mounting standoffs of the enclosure.

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 18 of 21
Restricted Proprietary and Confidential Information
Figure28–BatteryTangenttoMountingBosses
11. Orient the battery cable and battery’s circuit board upwards in order to avoid
collisions with the modem during assembly.
Figure29– BatteryCable Orientation
12. Bend the battery cable roughly 180 degrees and push the cable down towards the
enclosure as shown in
Figure30
. This will ensure that the cable will not collide with the
PCB during installation.
Figure30– BatteryCableDeformation

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 19 of 21
Restricted Proprietary and Confidential Information
Warning: It is extremely important that the positions of the battery cables are clear of
collisions with the push button connector, battery connectors, and any contact with the
PCB.
13. Repeat steps 9 to 12 for the second battery.
Figure31– BatteryInstallationComplete
14. Connect the battery connectors to their nearest receptacle as shown in
Figure32
.
During battery connections, ensure that the Iridium cable is looped around the
battery connectors as highlighted in the circled area of the Figure below.
Figure32– BatteryConnectionswith Iridium Cable Detour

SkyTrac Systems Ltd.
Document Revision 01.000 DOC0595 Page 20 of 21
Restricted Proprietary and Confidential Information
15. Lower the top enclosure assembly onto the bottom enclosure assembly. Ensure the
power connector and USB receptacle are aligned properly.
16. Pivot the two enclosures at the power connector end as shown in
Figure33
.
Figure33– ImaginaryEnclosureHinge
Warning: Forcing the enclosures together at this point would induce stresses in the PCB
resulting in undesirable deflection.
17. Slowly clamp the top and bottom enclosures together until they are slightly ajar or
fully shut, similar to
Figure34
.
Figure 34 –Enclosure AssemblyGap
18. Turn the assembly over and fasten the top and bottom enclosures together at 6
places using #4-40 screws from step one.
Warning: Do not exceed a torque of 3.2 in-lbs when fastening the enclosure together.
Other manuals for DSAT-300 Series
1
This manual suits for next models
4
Table of contents