Introduction
Foreword
Thank you for purchasing IER steamOvap electric steam Humidifier.
If you have questions or comments please contact us:
www.steamOvap.com
info@steamOvap.com
1-844-357-4477
Intended use
SB space blower for steam humidifier is intended exclusively to distribute steam
produced by a steam humidifier for direct in-space air humidification.
Operating conditions are specified in this Installation and Operation Manual (IOM).
Operation of this Space blower in the intended use scope requires that all directions
and information contained in this IOM are observed.
Any other use or operation outside the above design scope without written
authorization from steamOvap may lead to trouble and hazardous conditions and
will void warranty.
No alteration or modification to the Space blower must be done without written
authorization from steamOvap.
Replacement of any defective components must be done with original component
and spare parts from steamOvap representative.
Installation and Operation Manual Limitation
This IOM is intended for trained and qualified personnel and must be applied along
with the applicable local codes and regulations.
Any work related to installation or service for this humidifier must comply with local
code and regulation regarding safety and prevention of accidents.
End of life disposition
Disconnect Space blower from power supply, electrical control signal, Steam line,
and condensate line. Space blower can then be removed from the wall or from
steam humidifier.
Space blower is an electrical equipment and as such MUST not be disposed of in
domestic waste.
This Space blower should be returned to the closest steamOvap authorized
representative for proper dismantling, recycling and disposition of components
according to local regulations.

3
Table of content
Introduction ........................................................................................ 2
Table of content ................................................................................. 3
Safety warnings .................................................................................. 4
Before to proceed to Installation ......................................................... 5
Space blower Overview ...................................................................... 6
Installation overview ........................................................................... 8
Installation – step 1 IER Positioning & Mounting ................................ 8
Installation – step 4 Steam line installation ....................................... 11
Installation – step 5 Power supply installation .................................. 12
Installation – step 6 Control installation ............................................ 13
Verification before start-up ............................................................... 14
Start-up & normal operation ............................................................. 15
Maintenance & service ..................................................................... 15
Warranty .......................................................................................... 16

S A F E T Y
4
Safety warnings
General
Risk of electric shock.
Disconnect power supply before installation or service.
For safety and warranty reasons, Installation and service of this humidifier should be carried
out by trained and qualified personnel.
Any work related to installation and service of this humidifier must comply with local code and
regulation regarding safety and prevention of accidents.
Electrical Warning
Risk of electric shock.
Disconnect power supply before installation or service.
Power supply connexion must be done by a trained and qualified electrician.
Any work related to power supply installation or service of this humidifier must comply with
local code and regulation regarding safety and prevention of accidents.
Steam safety warning
Any work related to steam line and condensate returns lines installation or service of
such for this space blower for humidifier must comply with local code and regulation
regarding safety and prevention of accidents.
Risk of malfunction. Steam lines should not have any restriction or blockage that may cause a
burst of pressure in the steam line.
Risk of malfunction. Do not block steam outlet(s).
section
0

I N T E N D E D U S E
5
Before to proceed to Installation
Please read this Installation and Operation manual before to proceed to the Installation
Receiving & Unpacking
1. Upon receipt verify that packaging is complete and not damaged.
In case of damage, and/or missing boxes advise immediately the carrier by writing a note
on the waybill.
2. Verify that model of the space blower matches the purchase order and that all
accessories are included.
3. Any missing item should be reported as soon as possible to steamOvap or its
representative and within 5 business days after receipt.
steamOvap will not assume any responsibility for missing item after this delay.
4. Proceed carefully to unpacking, and check that the humidifier and its accessories are not
damaged. in case of damage please proceed as for point 3
Included in standard delivery of Space blower
1. This IOM
For Remote model:
2. Collar(s) to secure steam hose
3. 3 feet long condensate line & collars
section
1

O V E R V I E W
6
Space blower Overview
Space blower
Built-in Remote
Figure 1 – SB Built-in Overview
Figure 2 – SB Remote Overview
Model designation and options codification
Type & Model
S=Small
M=Medium
Nominal Voltage
SB S 120
section
2

O V E R V I E W
7
SB ratings
Model Steam
Capacity Airflow Power Voltage Current
Remote Built-in
SBS 26lb/h
[12kg/h]
220CFM
[375m3/h] 34W 120Vac Same as
IER
0.3A @
120Vac
SBM 65lb/h
[29.5kg/h]
330CFM
[560m3/h] 60W 120Vac Same as
IER
0.6A @
120Vac
SBL 96lb/h
[44kg/h]
330CFM
[560m3/h] 60W 120Vac Same as
IER
0.6A @
120Vac
IER Dimensions
Built-in Remote
Figure 3 – Built-in SB dimensions
Figure 4 – Remote SB dimensions
Model Dimensions
Steam
Inlet Ø Net weight
W
H
H1
D
SBS
Built-in
20in
[510m
m]
23in
[585mm]
8.5in
[216mm]
13in
[330mm] 1.5in
[DN40]
8lb
[3.6kg]
SBS
Remote
9.25in
[235m
m]
7in
[178mm] / 9in
[229mm]
SBM / SBL
Built-in
23.5in
[590m
m]
38in
[965mm]
10.5in
[267mm]
17.5in
[445mm] 2in
[DN50]
10lb
[4.5kg]
SBM / SBL
Remote
11.25in
[292m
m]
9in
[229mm] / 12in
[305mm]

I N T E N D E D U S E
8
Installation overview
General
1. Installation of this space blower should be carried out by trained and qualified
personnel.
2. Any work related to installation of this space blower must comply with local code and
regulation regarding safety and prevention of accidents.
WARNING. Risk of electric shock.
Power supply must be disconnected during installation.
Main power should be connected only after all installation steps have been completed and
properly verified.
Installation steps :
1. Positioning & mounting of Space blower/humidifier
2. If Remotely installed from humidifier
a. Steam line installation
b. Condensate line installation
c. Power supply installation
d. Control signal installation
Installation – step 1
IER Positioning & Mounting
General guidelines for positioning
Space blower should be positioned so that:
Length of the steam line (or hose) is as short as possible,
In case steam hose is used, the bend radius of 12in (300mm) is ensured
Space blower is easily accessible for service
CAUTION: Risk of water damage. Ensure that the surrounding area below and
around the space blower will not be damaged by any possible water projection.
CAUTION: Do not install Space blower above any electrical equipment, as water leak
from connection or abnormal operation can cause malfunction or short circuit.
IER maximum ambient conditions:
Temperature: 41°F to 122°F [+5 to +50°C]
Relative Humidity: 90%RH max (non condensing)
Ingress Protection for SB space blower standard enclosure: IP20
section
3

I N S T A L L A T I O N
9
Clearances for Space blower
Figure 5 – minimum clearances for SB
Clearance guidelines
There is no minimum clearance on both side of the Space blower, but it is a good practice to
have a clearance of 4 to 8 in [100 to 200mm] for ease of installation and service
Front clearance of 80in [2000mm] is required for steam absorption.
A top clearance is required of 24in [600mm] for access and for steam absorption to avoid any
condensing on the ceiling.

I N S T A L L A T I O N
10
General guidelines for Mounting
CAUTION. Risk of malfunction. Space blower must be levelled in X & Z axis.
CAUTION: Do not install Space blower above any electrical equipment, as water leak
from connection or abnormal operation can cause malfunction or short circuit.
Built-in SB
There are no specific installation steps for the mounting of the built-in space blower since it is
directly attached on the top of the IER steam humidifier.
Follow same installation steps for mounting as the one included in the IER electric steam
humidifier IOM.
Remote SB
Figure 6 – SB mounting holes location
Model A
SBS
SBM
SBL
6.5in
[165mm]
Wall installation
1. Verify that wall structure and strength is appropriate to support the operating weight of
the Space blower.
2. Mark the wall or support according to the above holes location, and drill 2 holes to the
wall or support as per the size of anchors and/or screws.
3. Use anchors of sufficient size (at least 1/4in [6mm]). Insert those anchors and the 2
screws, ensure that the screw heads extends 1/4in [6mm] from the wall, so that the
Space box will be able to be hung on those 2 screws.
4. With Top cover removed, hung the Space blower onto the 2 screws.
Ensure that the Space blower is properly levelled.
Tighten the 2 screws. Re verify the level in the 2 direction X and Z axis.
5. Re-install the top cover to the Space blower.
Ensure that the mounting bracket is properly levelled.
1. With front cover removed, hung the IER electric steam humidifier onto the mounting
bracket.
2. Insert the bottom screw through the back plate of the humidifier and into the anchors
in the wall.
Tighten the bottom screw. Re verify the level in the 2 direction X and Z axis.

I N S T A L L A T I O N
11
Installation – step 4
Steam line installation
Built-in SB
Steam line and condensate return are factory installed on Built-in Space blower.
Remote SB
Figure 7 – Steam & condensate line for Remote SB
Installation steps :
1. Install the steam hose or rigid steam pipe between the steam humidifier and the Space
blower.
Note: when using rigid steam pipe (stainless steel or copper) it is a good practice to
install a small length of steam hose in between steam humidifier and rigid pipe and then
Space blower for ease of installation and service.
Allow for a slope of 2° minimum.
2. Secure all connexion with hose clamps
3. Connect the condensate return from Space blower and provide a condensate trap of 8in
[200mm] minimum as shown on above figure.
Allow for a slope of 2° minimum.
Condensate return can be re-directed to the steam humidifier, or to an open drain.
4. Secure all connexion with hose clamps

I N S T A L L A T I O N
12
Installation – step 5
Power supply installation
Electrical Warning
Risk of electric shock.
Disconnect power supply before installation or service.
Any work related to power supply installation of this humidifier must comply with local code
and regulation regarding safety and prevention of accidents.
SB electrical ratings
Model Power Voltage Current
Remote Built-in
SBS 34W 120Vac Same as
IER 0.3A @ 120Vac
SBM / SBL 60W 120Vac Same as
IER 0.6A @ 120Vac
Built-in SB
Power supply is factory installed on Built-in Space blower, connected in the steam humidifier
electrical panel, see wiring diagram.
Remote SB
Remote Space blower is provided with standard 120Vac electrical plug for easy connection to
electrical outlet

I N S T A L L A T I O N
13
Installation – step 6
Control installation
Built-in SB
Control signal wiring is factory installed on Built-in Space blower, connected in the steam
humidifier electrical panel, see wiring diagram.
Remote SB
Remote Space blower is provided with 15feet of control wire cable.
Connect the 2 wires as indicated below on the steam humidifier control PCB.
Red wire = + signal, White wire = -signal
Figure 8 – Control connection

S T A R T - U P & O P E R A T I O N
14
Verification before start-up
Warning
For safety and warranty reasons, Installation and service of this Space blower should be carried
out by trained and qualified personnel.
Any work related to installation and service of this humidifier must comply with local code and
regulation regarding safety and prevention of accidents.
Risk of electric shock.
Disconnect power supply before verification.
Risk of malfunction. Steam lines should not have any restriction or blockage that
may cause a burst of pressure in the steam line.
Risk of water damage. Ensure that the surrounding area below and around the space
blower will not be damaged by any possible water projection.
Do not install Space blower above any electrical equipment, as water leak from
connection or abnormal operation can cause malfunction or short circuit.
Risk of malfunction. Do not block steam outlet(s).
Check list
Mounting
o Check mounting to verify that the Space blower is level and securely supported
before start-up.
Steam
o Verify that all steam piping has been completed as recommended and that a
slope of minimum 2° is provided.
o Ensure that there is no sag or kink or any possible obstruction in the steam line,
and condensate line.
Condensate return line
o Verify that all condensate return line has been completed as recommended and
that a slope of minimum 2° is provided.
o Ensure that there is no sag or kink or any possible obstruction in condensate line.
o If condensate is returned to the main drain verify that an open drain deported
from Space blower is provided.
Power supply
o Verify that power supply is connected.
Control circuit
o Verify that a control signal wires are connected to the steam humidifier main
PCB.
Once all above verification has been completed and found satisfactory you can powered up the
steam humidifier, and ensure that Space blower is operating properly.
section
4

S T A R T - U P & O P E R A T I O N
15
Start-up & normal operation
Space blower will be ON when the following conditions are met:
o Steam humidifier is ON
o There is a demand for humidity either from a control signal demand or from a
room RH% sensor.
o Steam humidifier has completed all internal conditions to start producing steam.
Blower ON
o As soon as the steam humidifier is heating up water in order to produce steam,
the blower will start.
Blower OFF delay
o Fan Off delay can be set in the Humidifier settings tab on the humidifier user
interface touch panel.
Please refer to steam humidifier IOM.
o When humidifier will stop steam production (when demand is reached) the
blower will stop after this pre-set delay is reached.
Maintenance & service
Space blower is equipped with an air filter located on the air inlet of the blower on the top
cover of the one.
Air filter should be cleaned up regularly.
Air filter should be verified at least every 3 months and cleaning operation frequency should be
adapted depending on the degree of dust present in the surrounding air.

Warranty
steamOvap technologies inc. (hereinafter referred to as steamOvap), warrant for a period of 3
years after installation, that steamOvap manufactured and assembled products are free from
defects in material and workmanship; provided that a start-up report with no default has been
done and signed by the authorized steamOvap local representative. Otherwise the warranty
period is reduced to 18 months.
steamOvap’s obligations and liabilities under this warranty are limited to furnishing
replacement parts to the customer, F.O.B. steamovap’s factory, providing the defective part(s)
is returned freight prepaid by the customer. Parts used for repairs are warranted for the
balance of the term of the warranty on the original product or 90 days, whichever is longer.
No liability whatsoever shall be attached to steamOvap until said products have been paid for
in full and then said liability shall be limited to the original purchase price for the product. Any
further warranty must be in writing, signed by an officer of steamOvap.
steamOvap makes no warranty and assumes no liability unless the equipment is installed in
strict accordance with installation manual in effect at the date of purchase and by qualified and
trained personnel and in accordance to local codes and regulations.
steamOvap makes no warranty and assumes no liability whatsoever for consequential damage
or damage resulting directly from misapplication, incorrect sizing or lack of proper maintenance
of the equipment.
steamOvap retains the right to change the design, specification and performance criteria of its
products without notice or obligation.
In case of litigation or dispute arising, all parties agree that the exclusive venue for any litigation
shall be vested with a court of competent jurisdiction located in the Judicial District of
Montreal, Quebec, Canada.
2019 steamOvap technologies inc.
9495 Charles de la Tour
Montreal, Qc, H4N 1M5
Canada
Tel.: +1-844-357-4477
info@steamOvap.com
www.steamOvap.com
Information contained in this manual is subject to change without notice.
To obtain the latest technical information visit our website at www.steamOvap.com
This manual suits for next models
3
Table of contents