
CORDCONNECTED (PLUGIN) ROOM HEATING UNITS
All cordconnected heaters are factoryconfigured
tobepluggedintoa120Vwalloutlet.Thecircuit
outlettheheaterispluggedintoshouldbedesig
natedsolelytotheheaterforcircuitsizingpur
posesaswellaspeakcontrolandmeteringpur
posesinsomeinstances.Todeterminethecorrect
circuitsize,refertotheFieldConnectionWireand
CircuitBreakerSizingGuideinthismanual.
120Vcordconnectedroom heatingunits must
onlybeusedwithreceptaclesthatareofthe
groundingtypeandsuitablefortheloadofthe
heater.(SeeFigure6forcordandreceptacle
requirements.)
Theroomheater'scordhasaplugasshowninFigure6A.Anadapter,asshowninFigure6B,isavailablefor
connectingthreeblade groundingtypeplugstotwoslotreceptacles. Thegreengroundingmeansextending
fromtheadaptormustbeconnectedtoapermanentground,suchasaproperlygroundedoutletboxasshownin
Figure6C.Thisadaptorshouldnotbeusedifathreeslotgroundedreceptacleisavailable.
HEATER CONTROL WIRING
SteffesETSheatingequipmentisgenerallycontrolledbythePowerCompanyviaapeakcontrolsignal.This
signalcanbesenttotheheaterusingtheSteffesPowerLineCarriersystem,lowvoltagewiring,aSteffesTime
ClockModule,orlinevoltagewiring.Inapplicationsutilizingautomaticchargecontrol,outdoortemperature
informationisrequiredandcanbereceivedviaanoutdoorsensororpowerlinecarriercontrol.
The2100seriesroomheatingunitisfactoryconfiguredforusewithpowerlinecarriercontrol.Refertothe
ConfigurationMenu(Page2.09)forinformationonconfiguringtheheaterfortheapplication.
POWERLINECARRIER(PLC)PEAKCONTROL
TheoptionalSteffesPowerLineCarrier(PLC)controlsystemhastheabilitytocommunicatewiththeheater
throughtheexistingelectricalcircuitsinthestructure.Withthepowerlinecarrieroption,hardwiredlowvoltage
connectionsfromthepower company'speaksignalingswitchconnectdirectlytothetransmittingdevice.The
switchsignalspeakcontroltimestothetransmitter,thetransmittersendsthesignaltoanunlimitednumberof
2100seriesheaters,whichreceive thisinformationandrespondaccordingly.
Inadditiontoprovidingpeakcontrolsignals,thetransmitteralsoprovidesoutdoortemperatureinformationfor
automaticchargecontrol,roomtemperaturesetback,andanticipatedpeakutilitycontrolsignals(ifapplicable).
AsthePLCsystemisoptional,itmustbespecifiedatthetimeofordering.IfutilizingaPLCsystem,referto
theOwner'sandInstaller'smanualaccompanyingthetransmittingdeviceforinformationontheinstallationand
operationofthepowerlinecarriercontrolsystem.
LOWVOLTAGEDIRECTWIREDPEAKCONTROL
Ifusingthelowvoltagecontroloption,theheaterisdirectwiredto
thepowercompany'speakcontrolswitch.Fieldconnectionsfrom
theloadmanagementswitcharemadetotheheater’slowvoltage
wiringharnessthroughthelowvoltageraceway.ClassII(low
voltage)wiringshouldneverenteralinevoltageareaoftheheater,
includingitsumbilical cord.
Somepowercompaniesalsouseanticipated(prepeak)signals.Ifapplicabletoyourinstallation,thecontrol
switchprovidingtheprepeaksignalcanalsobeconnecteddirectlytotheheaterwithlowvoltagewire.Referto
theLowVoltageConnectionsDirectWiredControlsDiagram(Figure7)forreferencetopeakandanticipated
peak low voltage connections.
Ifroutinglowvoltagewirenearlinevoltage
conductors,shieldedwiringmustbeused.
IMPORTANT
GroundingScrew
GroundingMeans
GroundingPin
(Fig6A)
3SlotGrounded
Receptacle
GroundedOutlet
Box(Fig6C)
Adapter(Fig6B)
2SlotReceptacle
120V Receptable Requirements
Figure6
2100 Series Installation 2.05
Installation