Storage Canopy FB204016DP User manual

1
Fabric Building
Double Truss Peak Style
Model# FB204016DP 20’x40’x16’
(8’ arch space)
Assembly Instructions

2
Equipment List
Speed Wrench
22#.23#.24#
Hammer (30lb)
Rope (12#)
Long Tape (50m)
Hammer Drill*1
Lifter*2
Crane*1
Forklift*1
Protective
equipment

3
YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER.
Thank you for purchasing our shelter. When properly assembled and maintained, this product will provide years
of reliable service. These instructions include helpful hints and important information needed to safely assemble
and properly maintain the shelter. Please read these instructions before you begin.
If you have any questions during the assembly, please contact local dealer for assistance.
SAFETY PRECAUTIONS
. Wear eye protection.
. Wear head protection
. Wear gloves when handling metal tubes
. Use a portable GFCI (Ground Fault Circuit Interrupter) when working with power tools and cords.
. Do not climb on the shelter or framing during or after construction.
. Do not occupy the shelter during high winds, tornadoes, or hurricanes.
. Provide adequate ventilation if the structure is enclosed.
. Do not store hazardous materials in the shelter.
. Provide proper ingress and egress to prevent entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this shelter, please read the MUST READ document included with the shipment.
WARNING: The anchor assembly is an integral part of the shelter construction. Improper anchoring may
cause shelter instability and failure of the structure. Failing to anchor the shelter properly will void the
manufacturer’s warranty and may cause serious injury and damage.
LOCATION
Choosing the proper location is an important step before you begin to assemble the structure.
The following suggestions and precautions will help you determine whether your selected location is the best
location.
. Never erect the structure under power lines.
. Identify whether underground cables and pipes are present before preparing the site or anchoring the
structure.
. Location should be away from structures that could cause snow to drift on or around the building
. Do not position the shelter where large loads such as snow and ice, large tree branches, or other overhead
obstacles could fall.
. Your shelter’s cover can be quickly removed and stored prior to severe weather conditions. If strong winds or
severe weather is forecast in your area, we recommend removal of cover.
SITE
After choosing a location, proper preparation of the site is essential. The following site characteristics will help
ensure the integrity of the structure.
. The support structure must be level to properly and safely erect and anchor the frame.
. Drainage: Water draining off the structure and from areas surrounding the site should drain away from the site
to prevent damage to the site, the structure, and contents of the structure.
WARNING: The individuals assembling this structure are responsible for designing and furnishing all
temporary bracing, shoring and support needed during the assembly process. For safety reasons, those who are
not familiar with recognized construction methods and techniques must seek the help of a qualified contractor.

4
Fabric Building 20'x40'x16' Parts List
Part
Code
Description
Qty/
pcs
1
top truss for 2nd to 5th arch
4
1A
top truss for 1st arch (front wall)
1
1B
top truss for 6th arch (back wall)
1
2
roof truss for 2th to 5th arch
8
2A
roof truss for 1st arch (front wall)
2
2B
roof truss for 6th arch (back wall)
2
3
shoulder truss for 1st to 6th arch
12
4
upright truss for 2nd to 5th arch
8
4A
upright truss for 1st and 6th arch
(front&back wall)
4
5
purlin
35
6
connection plate for steel wire No.21
20
7
corner base plate (left & right) for 1st
and 6th arch, installed with ratchet
4
8
interior base plate for 2nd to 5th
arch, installed with ratchet
8

5
9
tensioning tube for roof cover (4+1
pieces/set)
2 sets
10
tube clip for steel wire No.21
40
11
bolt M8x50 for truss swaged end
connection
192
12
bolt M10x70 for purlin connection
42
13
end plug (Φ32) for tensioning tube
No.9
4
14
belt for ratchet on base plate
12
15
knitting rope for roof cover (2
bundles)
1 pack
16
roof cover
1
17
duct tape
2
18
expansion bolt
48
19
steel wire turnbuckle
20
20
steel wire clamp
40
21
steel wire
20
22
square tube post on the lower left
side of the front door
1
23
square tube post on the lower right
side of the front door
1
24
square tube post on the upper left
side of the front door
1
25
square tube post on the upper right
side of the front door
1

6
26
connetion plate for square tube post
No.22, 23, 24, 25 (2pcs/set)
2 sets
27
post on the lower side of the back
door
1
28
post on the upper side of the back
door
1
29
base plate for back door
1
30
cross beam for front door
1
30A
vertical tube for door beam No.30
1
31
side rail for front wall (two sides)
4
32
upper rail for back wall
2
33
middle rail for back wall
2
34
lower rail for back wall
2
35
rail for installing winch
1
36
support tube for rail No.35
1
37
pole for door opening
1
38
front door bracing tube (2pcs/set)
3 sets
39
front door bracing tube (bottom)
(2pcs/set)
1 set
40
bolt M8x70 for swaged end
connection
6
41
carriage bolt M10x80 for rail
2
42
bolt M10x30 for rail and connection
plate
22
43
bolt M10x50 for post and truss
6

7
44
bolt M6x45 for door bracing tube
No.38, 39
4
45
bolt M12x130 for square tube post
No.22, 23, 24, 25
10
46
bolt M10x70 for square tube post
No.22, 23, 24, 25
9
47
knitting rope for front and back cover
(6 bundles)
2 packs
48
cable tie for fixing front and back
cover
60
49
expansion bolt
12
50
steel wire for front door
1 bundle
51
steel wire clamp for front door
4
52
winch for front door
1
53
front and back cover
1 each

8
INSTALLATION PROCESS
A—BASE PLATES INSTALLATION
Please refer to the below diagram to mark the position of base plates
The measurement is from center to center of base plates. Referring to the diagram and confirm the
place of base plates. ENSURE THAT THE FOUNDATION IS SQUARE.
Note: The expansion bolt (No.18, 49) applies for fixing base plate on concrete ground.

9
B—FRAME INSTALLATION
First Arch and Front Wall
1. Find Trusses (No.1A, 2A, 3, 4A) for first arch and connect them by bolt M8x50 (No.11).
2. Find relative parts of posts and rails for front wall and assemble them according to the below
diagram.

10
Second Arch to Fifth Arch Installation
3. Find Trusses (No.1, 2, 3 and 4) for second to fifth arch and connect them by bolt M8x50 (No.11).

11
Sixth Arch and Back Wall Installation
4. Find Trusses (No.1B, 2B, 3 and 4A) for sixth arch and connect them by bolt M8x50 (No.11).
5. Find relative parts of posts and rails for back wall and assemble them according to the below
diagram.

12
Purlin and Steel Wire Installation
6. Lift the assembled arches onto base plates (No.7 and 8) and connect them by bolt M8x50 (No.11).
7. When finish installing the first and second arches, install purlin (No.5) and connect them by bolt
M10x70 (No.12). Then the third arch and purlins. In this turn, one arch and then purlin tubes until
the fifth arch.
8. Install steel wires (No.21) between arches by steel wire turnbuckle (No.19), steel wire clamp (No.20),
connection plate (No.6) and tube clip (No.10).
9. Wrap every truss joint by duct tape (No.17) to protect roof cover.

13
C-INSTALLING COVER
Front Cover and Winch Door Installation
1. Install the winch door refer to the diagram bellow.
2. Install front cover (No.53) to the first arch and posts and rails on front wall by rope (No.47) and cable
tie (No.48).
WINCH DOOR INSTALLATION

14
1. Install the front door frame and door winch bracket
2. Fix the winch to the bracket. Make sure the winch handle faces the outside. Refer to Figure 1.

15
3. Take out the door curtain cloth and lay it on the ground. Pay attention to the direction. The side with
pipe pockets faces inward.
4. Connect the door bracing tube (2pcs/set) with M6x40 bolt.
5. Thread the door bracing tube into the pocket from top to bottom. Pay attention to the bottom
bracing tube. There are holes on both sides for fixing steel wire rope. Refer to Figure 2.

16
6. Put the steel wire rope through the pulley on the door frame as shown in Figure 3, so that the steel
wire rope is located on the inner side of the door frame and on the same plane as the pulley, and then
the steel wire rope sags naturally. Keep the length of both sides equal, and naturally sag to the ground.
7. Fix each end of steel wire rope to the hole on bottom bracing tube with steel wire clamps. Make
sure fix it firmly.
8. Put the door bracing tube into the track from the gap at the bottom,from top to bottom.

17
9. Adjust the length of the steel wire rope to be equal on both sides.Fix the wire rope fold to the hole in
the winch. Refer to Figure 4.
4

18
10. Turn the winch clockwise to lift the door curtain cloth and bracing tubes to a position about
40-50cm away from the cross beam. Lace the eyelets on the cloth to cross beam with a rope. Refer to
Figure 5.

19
11. Now the winch door installation is completed.Turn the winch clockwise to raise and
counterclockwise to lower the door. The steel wire rope shall be evenly wound on the winch so that the
door can rise and fall smoothly.

20
Front Cover Installation
Table of contents
Other Storage Canopy Tent manuals

Storage Canopy
Storage Canopy End Wall EWC2620R User manual

Storage Canopy
Storage Canopy FB335017DP User manual

Storage Canopy
Storage Canopy Metal Carport 12'x20'x10' Instructions for use

Storage Canopy
Storage Canopy EWC3340R User manual

Storage Canopy
Storage Canopy EWC3340DTPR User manual

Storage Canopy
Storage Canopy EWC4040R User manual

Storage Canopy
Storage Canopy EWC2020R User manual
Popular Tent manuals by other brands

ShelterLogic
ShelterLogic 25797 Assembly

North American
North American 25770 quick start guide

RioOutdoors
RioOutdoors 4P-DH installation instructions

Buffalo Tools
Buffalo Tools HUBL3 quick start guide

Palram Applications
Palram Applications Tucson 4300 manual

ShelterLogic
ShelterLogic 30'W x 15'H instructions