
3BA_327D_A2_200715_en.doc
Operating Instructions
STROBEL Class 327D
C o n t e n t s
1General notes on safety ...........................................................................................................5
2General .....................................................................................................................................7
2.1 Operating instructions..................................................................................................7
2.2 Class description, serial number and initial basis for description ...............................7
2.3 Range of application and intended use .......................................................................7
2.4 Technical data...............................................................................................................8
3Set-up and commissioning .................................................................................................... 10
3.1 Unpacking of the machine ........................................................................................ 10
3.2 Setting up the machine (Fig. 1 and Fig. 2)................................................................. 10
3.3 Sense of rotation of the machine (Fig. 3).................................................................. 13
3.4 Motor drive via toothed belt..................................................................................... 13
3.4.1 Tensioning the toothed belt (Fig. 4)............................................................ 13
3.4.2 Positions of the machine............................................................................. 14
3.5 Intermediate lifting (Fig. 5)........................................................................................ 15
4Notes on usage...................................................................................................................... 16
4.1 Needles and threads ................................................................................................. 16
4.2 Inserting the needle (Fig. 6) ...................................................................................... 16
4.3 Threading and thread run (Fig. 6) ............................................................................. 17
4.4 Winding up the thread (Fig. 7) .................................................................................. 18
4.4.1 Installing the bobbin and threading the bobbin thread (Fig. 8) ................. 18
4.5 Thread tensioning...................................................................................................... 19
4.5.1 Thread tensioning - needle thread (Fig. 9).................................................. 19
4.5.2 Thread tensioning –bobbin thread (Fig. 10) .............................................. 20
4.6 Adjusting the stitch length (Fig. 7 and Fig. 11).......................................................... 21
4.7 Stitch depth ............................................................................................................... 22
4.7.1 Adjusting the stitch depth (Fig. 2)............................................................... 22
4.7.2 Digital stitch depth display (Fig. 12)............................................................ 23
4.7.3 Changing the battery (Fig. 12)..................................................................... 23
4.8 Plunger stop............................................................................................................... 24
4.8.1 Adjusting the plunger stop (Fig. 13)............................................................ 24
4.9 Sewing drive .............................................................................................................. 25