
SUNGLO EXPERT GREENHOUSE ASSEMBLY
2 8-15 Update
INTRODUCTION
Your Sunglo Greenhouse is sold complete with all the components necessary for assembly without
cutting or refitting. Included in the kit are all aluminum structural elements, acrylic glazing, door, air
vents, exhaust fan, intake shutter and thermostats. All structural components are marked with a part
number in a location that will not show after assembly. But feel free to remove them during
installation.
We provide the rivet tool, rivets, drill bits, and screws needed to assemble your greenhouse. The drill
bits provided are No. 30 and No. 11 sizes. Should you need more drill bits you can use a 1/8”
diameter drill bit instead of #30 and 3/16” instead of No. 11. Follow the assembly sequence steps
carefully and do not install rivets until they are specified in the instruction manual and install them only
in the locations shown. Rivets installed too early may cause assembly issues later on. Additional
riveting for strength can be done at a later time. If you place a rivet wrong and need to remove it, use
the same drill bit to drill the rivet out of the hole. Only use the long rivets as recommended. If a hole is
drilled in the wrong location you can always rivet it purely for cosmetic reasons. Long rivets are used
to secure thicker materials. As a guideline most are used for corner posts, trusses, ridge, door frame,
hinges and the black vents. Only use long rivets where specified.
In addition to a DVD player here is a list of tools to have during the assembly:
1. Tape measure and pencil.
2. Electric hand drill or quality battery hand drill and 5/16” drill bit. (For door latch)
3. Framing level 4’ or longer for foundation and 9” torpedo level for greenhouse assembly.
4. Framing square. (For foundation assembly and lower “U” rail attachment)
5. Rubber mallet or dead blow hammer.
6. Caulking gun with 1 tube of silicone caulk. (Optional)
7. Standard Phillips and flat head screwdrivers.
8. Blue “painters” masking tape. (3/4 or 1 inch) (Optional)
9. Small vise grips. (At least 2 needle nose. More is better to secure items before riveting.)
10. Spray bottle with soapy water. (For lubricant during lower wall installation) (Optional)
11. 5/16” drill bit for installation of the door lock.
PLEASE PERFORM A COMPLETE INVENTORY OF YOUR KIT BY MATCHING ALL THE PARTS TO THE INCLUDED
PACKING LIST BEFORE BEGINNING ASSEMBLY OF YOUR NEW SUNGLO GREENHOUSE.IF YOU DISCOVER
ANY ITEM MISSING,PLEASE CALL US AT (425) 251-8005 OR E-MAIL US AT
INFO@SUNGLOGREENHOUSES.COM
PLEASE STUDY THE INSTALLATION DVD AND READ THROUGH THE INSTRUCTION MANUAL BEFORE
BEGINNING ASSEMBLY OF YOUR SUNGLO GREENHOUSE.THIS WILL PREPARE YOU FOR THE INDIVIDUAL
STEPS AND ALLOW YOU TO PROPERLY ESTIMATE THE TIME NEEDED FOR ASSEMBLY.PLAN YOUR DAY SO
YOU HAVE TIME TO INSTALL AT MINIMUM THE LOWER WALLS,GABLE ENDS,RIDGE HEADER AND
TRUSSES.THIS WILL ASSURE A STABLE ASSEMBLY IF YOU ARE GOING TO LEAVE THE GREENHOUSE
PARTIALLY FINISHED OVERNIGHT.HIGH WINDS COULD DAMAGE A PARTIALLY BUILT GREENHOUSE.