EnglishDeutsch
 logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Takara Belmont
  6. •
  7. Hot Tub
  8. •
  9. Takara Belmont Yume Oasis User manual

Takara Belmont Yume Oasis User manual

This manual suits for next models

4

Other Takara Belmont Hot Tub manuals

Takara Belmont INOVA-EX User manual

Takara Belmont

Takara Belmont INOVA-EX User manual

Takara Belmont YUME User manual

Takara Belmont

Takara Belmont YUME User manual

Takara Belmont YUME NAGOMI User manual

Takara Belmont

Takara Belmont YUME NAGOMI User manual

Takara Belmont RS Adria II User manual

Takara Belmont

Takara Belmont RS Adria II User manual

Popular Hot Tub manuals by other brands

Bestway Lay-Z-Spa 54189 manual

Bestway

Bestway Lay-Z-Spa 54189 manual

Jacuzzi ARGA ARG101C0110 Use & maintenance

Jacuzzi

Jacuzzi ARGA ARG101C0110 Use & maintenance

Softub PRESTIGE Owners Manual Water Treatment Guide

Softub

Softub PRESTIGE Owners Manual Water Treatment Guide

JNJ SPAS SPA-318 Programming instructions

JNJ SPAS

JNJ SPAS SPA-318 Programming instructions

KIRAMI Comfort Family Instructions for use

KIRAMI

KIRAMI Comfort Family Instructions for use

QCA Spa VS501 PAK (VL260 TOPSIDE) owner's manual

QCA Spa

QCA Spa VS501 PAK (VL260 TOPSIDE) owner's manual

HoMedics FB-655HJ-GB manual

HoMedics

HoMedics FB-655HJ-GB manual

Everyday Hot Tubs 530 owner's manual

Everyday Hot Tubs

Everyday Hot Tubs 530 owner's manual

anko SS-601A user manual

anko

anko SS-601A user manual

Jacuzzi Duetta 6042 Specification sheet

Jacuzzi

Jacuzzi Duetta 6042 Specification sheet

Pooli OS030979B product manual

Pooli

Pooli OS030979B product manual

Jacuzzi alimia instructions

Jacuzzi

Jacuzzi alimia instructions

ab Solares Smart Spa operating manual

ab

ab Solares Smart Spa operating manual

CalderaSpas CalderaSpas Utopia Series owner's manual

CalderaSpas

CalderaSpas CalderaSpas Utopia Series owner's manual

Outsunny 848-047V70 Assembly guide

Outsunny

Outsunny 848-047V70 Assembly guide

Aquatic INFINITY 1 Specifications

Aquatic

Aquatic INFINITY 1 Specifications

Master Spas MP Force owner's manual

Master Spas

Master Spas MP Force owner's manual

Asteria 5630 owner's manual

Asteria

Asteria 5630 owner's manual

https://manuals.online logo
https://manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2026 Manuals.Online. All Rights Reserved.

1
YUME OASIS Installation Instructions
Contents
Before Installation
Usage Conditions
Preparation Before Installation Of floor unit
YUME OASIS Packing
Installation
Of
Floor Unit
Piping In Floor Unit
Carrying The Upper Unit
Connection Check With The Upper Unit
Test Water Flow
Cleaning And Check Of The Floor Unit
Cleaning And Check Of The Upper Unit
After Installation
Specifications
Chair Correlation Dimension
M E M O
2
5
6
12
13
16
18
22
23
24
25
27
29
30
35
Upper unit
Back Wash Basin
(YUME Basin)
Model No.AY-OAYMYM-*
    AY-OAYMYM-*NB
Floor unit
Model No.AY-OAYM-F
Upper unit
Side Wash Basin
Model No.AY-OAYMSS-*
The CAUTIONs listed here are to ensure that YUME OASIS can be installed safely, and to prevent and danger or
risk to the person installing YUME OASIS or those around them.
All of these CAUTIONs are important for safety. TAKARA BELMONT is not responsible for any damage or risk
to the person installing YUME OASIS or those around them due to accidents if YUME OASIS is installed
without adhering to the CAUTIONs.
If YUME OASIS is installed after ignoring this symbol, there is the risk of light or moderate injury or physical damage.
CAUTION
March 20173rd Edition
※The actual shape of YUME OASIS and the images and
dimensions listed in these instructions may be modified
and are subject to change without notice.
To the customers
・Customers must not install YUME OASIS by themselves.
・Please give us your order of installation.
Never install this product by yourself.
・Customers must store these instructions in a safe place
so as not to lose them.
To the installer
・The instructions should be thoroughly read and
understood before installation to ensure that YUME OASIS
is installed correctly.
・After installation, give these instructions to the customer.
TAKARA BELMONT CORPORATION
The "*" part of the individual Model No.
shown above depends on the product color.
The latter of Model No. is without "NB"
This product is battery specification.
Be prepared for AA size battery
(LR6,2 pcs)[not included]
*1590
30
430
F.L
23 60 135 135
50 65
255
105
105
2
F.L
CAUTION
Before Installation
●Plumbing Drawing
・Vertical Plumbing (Unit: mm)
・Horizontal Plumbing (Unit: mm)
Piping space
Piping space
Drain VU40/VP40
60 or more
Drainpipe
Resin case Resin case
●Always ensure the gradient of drain line according to the number of units to be installed as shown on page 4.
●For vertical plumbing, make sure to adjust the top end of the piping to be lower than the lower end of the resin case.
The space for attaching the stop valve and for piping connection with the floor unit is necessary in the resin case.
●In general, vertical plumbing is recommended when the floor mount pump is fastened.
(The floor-fastening bolt may interfere with the pipe.)
●If horizontal plumbing is necessary, pay careful attention to the interference with the floor-fastening bolt.
●When the floor mount high locks pump (SP-CH) is fastened onto the floor, be aware of the following dimensions:
 *1=350 mm or more
 *2=85 mm or less
 *3=68 mm or less
●In the case of horizontal plumbing, a floor-fastening type pump such as SP-FM, SP-FT and SP-FD cannot be used because
of interference between the pipe and the fastening bolt.
Hot water supply
Water supply
Drain
Center line
Center line
Center line
50以上
590
430
135 135
95
255
23
25 2050 172
50
20
25
35
105
105
F.L F.L
Drain VU40/VP40
*2
*3
F.L
65
Hot water supply Rc1/2 13 mm
Water supply Rc1/2 13 mm
Water supply Rc1/2 13 mm
60 to 70 (Distance to the socket end)
45 to 55 (Distance to the socket end)
Hot water supply Rc1/2 13 mm
イス側Seat side
イス側
Seat side
●Plumbing Layout Of Horizontal Plumbing
Stop valve
(accessory)
Flexible hose
(accessory) Drain VU40
Hot water supply Rc1/2
(Copper pipe: 13 mm)
Flexible hose
(accessory)
Flexible hose
(accessory)
Hot water supply Pipe
(Copper pipe of 20 CP or more)
Seat side
Drainpipe
Number of upper units to be used simultaneously
2 units or less; at least VU 50
3 units or more; at least UV 75
3
CAUTION
Pay careful attention to the interference
between the floor-fastening bolt and the
pipe.
Water supply Pipe
(PVC pipe of 20 VP or more,
or Copper pipe of 20 CP or more)
Water supply Rc1/2 13 mm
○Ensure that the material or finishing of the floor surface is waterproof or has a waterproof coating applied.
○Always ensure that the floor surface is horizontally level.
○Ensure that the floor surface is smooth and free from bumps around the attachment areas.
○Prevent the step height of floor joint.
○Be sure to use a floor panel of 3 mm thickness.
○Use a hard floor panel made of polyvinyl chloride (PVC) tiles, etc.
○Do NOT use a cushion floor. Using a cushion floor may cause troubles in detaching and attaching the upper unit.
○For installation of upstairs, make sure to take appropriate waterproof measures.
○Do not use a floor panel with significant bumps or dents that disturb transfer of the upper unit.
○Do not use a floor panel that becomes slippery when water is leaking.
○Use the waterproof material for the floor.
○If the product is installed on the floor above a room, always make sure to take appropriate waterproof measures
(waterproofing work, installation of a stainless steel pan, attachment of a leakage sensor, etc.).
○This company will not bear any responsibility whatsoever for water leakage due to the waterproof installation failure.
■Floor Surface
■Water Leakage
Make sure to prevent the water leakage for the worst.
■Installation Of Pipes
■Plumbing
●Diameter of pipes and gradient of drain line
●Drainpipe end treatment (Ascending part dimensions)
The following are important points to adhere to during the installation of pipes.
Read through the details carefully and ensure that the pipes are installed correctly.
・When installing this product, ensure that installation of pipes adheres to the instructions outlined in "CAUTIONs during
installation of pipes". Installing pipes without reading through the CAUTIONs will mean water may not mix properly,
and a set temperature will not be achieved.
・This product is designed for indoor installation. Always install this product indoors.
Refer to the Plumbing Drawing on page 2.
・Use dependent drainage for YUME OASIS only.
・Layout the drain line in a straight line as best as possible.
Number of upper units to
be used simultaneously Diameter of Drainpipe Gradient of drain line
2 units or less
3 units or more
At least VU 50
At least VU 75
<CAUTION>
Use a drainpipe of appropriate diameter according to the
number of units to be installed.
At least 1/100
At least 1/50
4
CAUTION Make sure that the drainpipe does not have double trapping.
Drain failure or abnormal noises may occur.
・Set the hot water temperature to 80℃or less.
・Set the temperature 10℃or higher than the shower temperature used.
5
○Water supply (primary) plumbing
・In the case of using city water direct pressure line, consult to local contractors designated by the water supply
Works Department. Installation must be made in compliance with the plumbing code requirements such as the
"Water Supply Works Department Installation Standard", etc. in your area.
・In the case of using lines other than the city water line (fall supply line from elevated water tank), consult to local
contractors designated by the water supply Works Department. Installation must be made in compliance with the
plumbing code requirements such as the "Water Supply Works Department Installation Standard", etc. in your area.
○Do not use pipes made of materials that may introduce rust for the water supply Pipe.
In general, VP pipes or other materials specified by regulations in that particular region, are recommended for installation.
○In general, Type L deoxidized copper pipes are recommended for hot water pipes.
○In general, the same diameter and same pressure is recommended for hot water pipes and water supply pipes.
○Always use a reamer to demurred the ends of cut pipes.
○Avoid using inverted U-shaped pipes (siphon) as these can cause air to become trapped.
○Always connect hot water pipes and water supply pipes after removing all contaminants such as dirt, sand and oil as these
can cause problems.
○After connecting the pipes and testing water flow, clean the filter and shower head.
○Ensure that the Drainpipe is installed at a gradient of 1/50 for a diameter of φ75 or less, or 1/100 for a diameter of φ75 or
more.
○Do not connect the hot water pipes and water supply pipes in reverse.
Connecting pipes in reverse will mean the temperature of water cannot be controlled properly by the water taps, which can
cause problems including burns.
○Ensure that the hot water pipes from water boilers are only run over a short distance so as to minimize resistance.
Longer pipes can cause fluctuations in temperature and poor hot water delivery.
○Always wrap pipes with lagging material after installation is complete.
○Plumbing particulars for water heater
・In general, the same diameter and same pressure is recommended for main hot water pipes and main water supply pipes.
・Contact a professional for installation of water heater.
○Equipment comes with hair trap installed.
■Hot Water Supply And Water Supply Conditions
Water used
■CAUTIONs During Installation Of Pipes
・Public water supply
(do not use non-drinkable well water or water that contains rust or sand.)
・If the water hardness is 80 ppm or higher, install a water softener to prevent the buildup of scale.
Aeration may be minimal when using shampoo even if drinkable well water is used, so a water
softener should be installed.
・Use a pressure set between 0.1 to 0.4 MPa (1 to 4 kg f/cm2).
If multiple YUME OASIS are used, ensure that the pressure does not drop below 0.1 MPa (1 kg f/cm2).
・Set the water supply pressure ≧hot water supply pressure.
・Set the difference between the hot water supply pressure and water supply pressure to within
0.2. MPa (2 kg f/cm2).
Hot water
temperature
into the product
Hot water supply
temperature
Hot water supply,
water supply
pressure
・For a water heater, TAKARA simultaneous hot water supply system "DANRYU" for barber and
esthetic salon is recommended. Refer to the installation manual of "DANRYU" for installing "DANRYU.”
・Whenusinganinstantaneouswaterheater,theequivalenceofNo.16orbetterisrecommended.
(Shampoo capacity equals to one unit of RS OASIS per one unit of instantaneous water heater.)
・When using a hot water storage system boiler, refer to the installation manual of the boiler.
・A high temperature fluid (steam) that is hotter than the hot water supply specified above may damage the
hot water supply pipe.
Do not connect the hot water supply pipe with a steam generator to cause high temperature steam.
Conditions Of Use
6
D-dimension
A-dimension
Marking lines
Mirror
2 Marking (Installation position)
CAUTION
Preparation Before Installation Of Floor Unit
■ Mortar Bury Method
1 Marking
Mark the floor level (F.L.) and the mortar finish level (★).
Always ensure the gradient of drain line according to
the number of units to be installed as shown on page
4.
3 Installation of form
Install a wooden form for pouring mortar.
Align the center of form and floor unit marked in Step 2, and then install those.
● Horizontal plumbing Keep 120 mm or more of the
drainpipe as margin.
Form
Drainpipe
120 mm or more
● Vertical plumbing
Form
170 mm or more
(Mortar finish level)
CAUTION
CAUTION
CAUTION
Make sure that the drainpipe does not have double trapping.
Drain failure or abnormal noises may occur.
Wall
Keep 120 mm or less of
drainpipe from floor level.
There are two preparation methods for installation; "Mortar Bury Method" and "Composite Panel Platform Method".
Select either of the methods according to the installation site conditions.
Refer to the following procedure for Mortar Bury Method, and refer to page 9 for Composite Panel Platform Method.
In the case of the mortar bury method, a wooden form and a bury frame (our
optional item) are required.
Refer to the Chair Correlation Dimension (on pages 30
to 34) and mark the position to place the floor unit.
(The A-dimension and the D-dimension depend on the
chair to use and the reclined posture.)
Rule lines as many as possible so that you can see the
layout of the water supply Pipe, the hot water supply
Pipe and the drainpipe and the floor unit position.
Consider the thickness of the decorative mortar
when the floor panel thickness is determined if floor
panels are not laminated but the floor is finished
with mortar.
Thickness of the floor panel/
thickness of the
decorative mortar
F.L
★
F.L
★
F.L
★
イス側
Seat side
Seat side
120 mm or less
[Form] Cut off three portions
according to pipe positions.
※Floor units installed into the bury frame.
(After the bury frame is installed and the floor is completely finished, the floor unit is installed.)
Mortar Base
4 Installation of mortar base
Install mortar base.
(Mortar finish level)
Pipe
Mortar base
5 Removal of form, Installation of bury frame, and Installation of mortar base
1. Remove the form, and then install the bury frame of floor unit to the position where marked in Step 2.
※Please use our standard bury frame as a bury frame. (optional)
※Attach the white top of bury frame to the top face of the Mortar finish level (★).
Surely attach the top of bury frame
to the line marked ★.
Bury frame
Pipe
Form
Reinforcement Crosspiece
Damp-proof Sheet
【Wall thickness: EA-OAFWYM (optional item)】
Wall thickness t=18㎜
7
Mortar finish thickness
If floor panels are not laminated but the
floor is finished with mortar,
it is always required that the top end of
the mortar work form is also finished with
mortar.
●Do no remove the reinforcement crosspiece until the mortar filling is
dried. The bury frame may bend and prevent the resin case of floor unit
from fitting.
●Do not remove the damp-proof sheet.
It prevents the moisture of mortar from entering the floor unit.
※When installing the floor unit, fine adjustment
will be required.
Be sure to install in the following order:
(1) Install a form and install mortar base.
(2) Install a bury frame and install mortar filling.
F.L
★
F.L
F.L
★
CAUTION
CAUTION
For bottom-strength when install the floor unit,
pour the mortar into the whole of the bottom space.
Laminate a floor panel of 3 mm thickness on the floor and the floor unit lid.
Contact an expert agency in advance for lamination of floor panels.
●Laminate a 3 mm thick floor panel on the floor and the floor unit lid.
If a different thickness is applied, normal detachment/attachment or shower outlet may be disturbed.
●Use a hard floor panel made of PVC tiles, etc.
Do NOT use a cushion floor.
Using a cushion floor may cause troubles in detaching
and attaching the upper unit.
●Laminate the floor panels so that the top end of the
white bury frame is hidden and trim them to the opening.
Floor panel
Maintenance lid
Do not forget to cut off
the portion for the screw for fastening lid.
Cut off the shaded
portion from the floor panel.
Floor unit lid
Floor panel/decorative mortar
Bury frame
Mortar
※Be sure to cut off in an exactly same shape as the cut window.
If not, the link mechanism of detaching/attaching might not work normally.
※When wood flooring or tiles are used around the openings, select a material equal to or thinner than 12 mm.
Otherwise, the floor unit cannot be secured.
※Even in the case of the installation site with wood flooring or tiles used around the openings, laminate 3 mm
thick hard floor panels made of PVC tiles.
※For the floor panels to laminate, the optional YUME OASIS floor panel kit is available in two colors.
Place another order if necessary.
Preparation for installation is completed. Go to Installation Of Floor Unit on page 13.
These areas are also laminated with floor panels.
Floor panel
6 Finishing of floor surface (finishing of floor unit lid)
8
2. Install mortar filling so as to level the surface with the top end of the bury frame.
Smooth the mortar with a metal
trowel so as to form a flat face with the top end of the bury frame
※Note that the top surface of the bury frame should be finished
with a required thickness of mortar if the floor is finished with mortar.
Reinforcement Crosspiece
Reinforcement Crosspiece
Make a minimum size of incision in the damp-proof
sheet for each pipe and stick out the pipes.
※Use a caulking material to seal around the pipes
that come through the sheet.
Bury frame
CAUTION
 Always ensure the gradient of drain line
according to the number of units to be
installed as shown on page 4.
4 Laying the subflooring material
9
■ Composite Panel Platform Method
1 Marking (floor level)
Mark the floor level (F.L.)
140 mm or more
3 Piping
2 Illustrates the markings (installation position), the support legs and the base panel and
mark the position to place the floor unit.
※Cut the panel + 50 mm larger around the attachment position.
Wall
D-dimensionA-dimension
Marking lines
Hot water supply
Drain
Mirror
Base
Support Leg
Water supply
Refer to the Chair Arrangement Correlation Dimension
(on pages 30 to 34) that illustrates the markings (installa-
tion position), the support legs and the base panel and
mark the position to place the floor unit.
(The A-dimension and the D-dimension depend on the chair
to use and the reclined posture.)
As for markings, rule lines as many as possible so that you
can see the layout of the water supply Pipe, the hot water
supply Pipe and the drainpipe and the floor unit position.
Arrange the support legs and the floor base panel at this
timing.
Lay pipes to meet the floor unit position marked in Step 2 accord-
ing to the Plumbing Drawing on page 2.
For plumbing, check the position of the support legs to hold the
floor in advance and avoid the position to lay the pipes.
※When the floor mount high rocks pump (SP-CH) is fastened
onto the floor, pay attention to the following dimensions:
 *1=350 mm or more
 *2=85 mm or less
 *3=68 mm or less
Make sure that the drainpipe does not have double trapping.
Drain failure or abnormal noises may occur.
Before laying the subflooring material, cut off the
opening in the floor base panel for the unit attach-
ment position.
Check the flexural level of the floor base panel with
the opening and place additional support legs.
CAUTION
F.L
*1
*2
*3
CAUTION
Floor unit installation position
+50㎜
+50㎜
+50㎜ +50㎜
Decorative floor panel
32㎜
Decorative floor panel
Rafter for mounting
(45 mm square)
Resin case
of floor unit
・Machine screws for use (packaged with floor unit)
ø3.8 x 51 Coarse-led (SUS)
Sash
Finishing material
24㎜〜30㎜
※Check the flexural level of the floor base panel again and place additional support legs under the reinforcement frame if required.
Rafter for mounting (45 mm square)
90㎜
90㎜
591㎜
431㎜
10
5 Lamination of floor panels
※Dimensions of the reinforcement frame for unit mounting
CAUTION
The floor unit is fastened by machine screws at 32 mm high
from the floor level.
Make sure to arrange the rafter for fastening at the height.
※The adjustable range of floor unit is up to 150 mm from
floor level.
For raising the floor level over 150 mm, provide a base
inside of the reinforcement frame with rick, block,
and mortar, etc.
[Illustration of rafters]
Maximum length;
up to 150 mm
135㎜
Floor unit
Rafter
Composite panel
591~592㎜
431~432㎜
90㎜90㎜
Subflooring material (t 12)
Finishing material (t 12)
Support Leg
After laying the subflooring material and the finishing material on the base, attach the reinforcement frame
for unit mounting onto the back surface of the subflooring material.
※Do NOT use wood for the base.
The level adjusters may sink down.
※If the base is unstable, securely fix it using mortar
or glues.
Maximum adjustable range:
up to 15 mm
※Adjuster Position
372 128 35
175
175
175
20
【Unit:㎜】