i iiii:i!i_
i¸i¸i(¸
!ilii
i il;
{{!i_!i
i _!i!(I
iL
_!!!i
4,I (Sene_'a/b st_,tio_ s
TheT-6shouldbe installedin a shadedandventilatedlocation,awayfrom heatand on a hard
leveledsurface,Theunit Shouldbe positionedat least 10cm (4") from the bad<wall,
50 cm (20")from top and40 cm (I 6") eachside,
Pleaseuseonly TANA approvedfittings.
Thewater sourcemustbe not more than5m (I 6 ft) from the unit,
Water pressuremustbe between 2_and 6 bar (30-90 psi),
Thewater line mustbe connectedto the ballvalvebeforethe applianceisconnectedand
the valvehasmust be placedwithin easyreachfor maintenancepurposes,
4,3 Pt'epaHn$ _of Ope,'atio_
The unit leavesthe factory in "SHIPPING MODE" and must undergo the complete installation
procedure before regular useto ensure water tanks are correctly filled and cleaned,
Placethe filter cartridge into the filter housing (see page 17),
Make sure the Heating System switch (see page 5) is in OFFposition,
Plugthe unit into the electric powen
The system performs self-check (two beeps will be heard after _f-7 seconds),
after the second beep, the system will enter a semi automatic installation procedure,
\_/a]t until the "Installation Completed" messageappears on the screen, and then pressthe
"OK" button,
The unit will not start to operate until the "Installation Completed" isconfirmed by pressing
"OK" button at the end of installation procedure,
....Settingboilingtemperature
The Boilingtemperature mustbe set manuallyifthe unit isinstalledin a location at,or more
than,400 m (I 300fit) abovesealevel(for adjustmentseepage 12_),