
1 Overview
Overview
www.ti.com
11 Pop/Click (Disable) ......................................................................................................... 1112 DRV602EVM2 Schematic: DRV602 ..................................................................................... 1213 DRV602EVM2 Schematic: On/Off and Regulator ..................................................................... 1214 DRV602EVM2 PCB Component Placement ............................................................................ 1515 DRV602EVM2 PCB Top Layer ........................................................................................... 1616 DRV602EVM2 PCB Bottom Layer ....................................................................................... 16
List of Tables
1 Key Parameters .............................................................................................................. 32 Recommended Supply Voltage ............................................................................................ 43 DRV602EVM2 Filter Specifications ....................................................................................... 54 General Test Conditions .................................................................................................... 75 Electrical Data ................................................................................................................ 76 Audio Performance Analog Input .......................................................................................... 87 Physical Specifications ...................................................................................................... 88 Related Documentation.................................................................................................... 129 Bill of Materials ............................................................................................................. 1310 PCB Specifications ......................................................................................................... 14
The DRV602EVM2 customer evaluation module (EVM) demonstrates the capabilities and operation of theDRV602 integrated circuit from Texas Instruments.
The DRV602 is a 2-V
RMS
pop-free stereo line driver designed to allow removal of the output dc-blockingcapacitors in audio applications to reduce component count and overall cost. The device is ideal forsingle-supply electronics where size and cost are critical design parameters.
Designed using TI’s patented DirectPath™ technology, the DRV602 is able to drive 2 V
RMS
into a 2.5-k Ωload with 3.3-V supply voltage. The device has differential inputs and uses external gain-setting resistorsthat support a gain range of ±1 V/V to ±10 V/V, and line outputs that have ±8 kV IEC electrostaticdischarge (ESD) protection. The DRV602 also has built-in shutdown control for pop-free on/off control.
Using the DRV602 in audio product applications can reduce component counts considerably compared totraditional methods of generating a 2-V
RMS
output. The DRV602 does not require a power supply greaterthan 3.3 V to generate its 5.6-V
PP
output, nor does it require a split-rail power supply. The DRV602integrates its own charge pump to generate a negative supply rail that provides a clean, pop-free,ground-biased 2-V
RMS
output. The DRV602 is available in a 14-pin TSSOP package.
This EVM is configured with two RCA phono input connectors for analog input; the output signal isavailable on two RCA phono connectors. The power supply is connected via a two-pin, 2,54-mm header.
This evaluation board is designed for testing applications such as set-top boxes, LCD/PDP TVs, Blu-rayDisc™ DVD players, DVD mini-component systems, home theater-in-a-box (HTIB) systems, orsoundcards.
This document presents EVM specifications, audio performance measurements graphs, and designdocumentation that includes complete circuit descriptions, schematic diagrams, a parts list, and PCBlayout design. Gerber (layout) files are available from the TI web site at www.ti.com .
Throughout this document, the abbreviation EVM and the term evaluation module are synonymous withthe DRV602EVM2.
2DRV602EVM2 SLOU248A – December 2008 – Revised January 2009Submit Documentation Feedback