Thermon Terminator ZL Reference guide

For Power Connecon or End Terminaon Applicaons
Terminator
TM ZL
Lighted Power Connecon/
End Terminaon Kit
INSTALLATION PROCEDURES

2
Kit Contents
Item Quanty Descripon
1 1
Expediter Assembly
Support Cap with O-Ring
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2 1 Juncon Box Lid
3 1 Juncon Box Base with O-Ring
4 1 Nut
5 1 Banding
6 1 Banding Guide
7 1
Terminal Blocks with DIN Rail
(Refer to terminal specicaons for maximum
allowable wire size)
8 1 Juncon Box Cord
Dimensions
TerminatorTM ZL INSTALLATION PROCEDURES
Order Separately
PETK Power and End Terminaon Kits (per cable)
PETK-1 for BSX, RSX, VSX-HT
PETK-2 for KSX, HTSX
PETK-3 for HPT, FP
Item Quanty Descripon
1 1 RTV Tube
2 1 Power Connecon Boot
3 1 End Cap
4 1 Tape Strip 6" (PETK-3 only)
5 1 End Terminaon Cauon Label
6 1 GRW-G Grommet (PETK-3 only)
7 1 Ground Sleeve
IP66/Type 4X -60°C ≤Ta ≤ +55°C
Listed Heat Tracing Cable System 137M
Ordinary & Hazardous Locaons
Class I, Division 2, Groups A, B, C, & D
Class II, Division 2, Groups F & G, Class III
Class I, Zone 1, AEx eb IIC T6...T4
09.2238691,-G,-S, Ex eb IIC T6...T4
Tools Required
Cercaons/Approvals
Installaon Precauons
• To minimize the potenal for arcing and re caused by product
damage or improper installaon use ground-fault protecon.
The Naonal Electrical Code (NEC) and Canadian Electrical Code
(CEC) require ground-fault protecon of equipment for each
branch circuit supplying electric heat tracing.
• Installaon must comply with Thermon requirements and
be installed in accordance with the NEC, CEC, or any other
applicable naonal and local codes.
• Component approvals and performance rangs are based on
the use of Thermon specied parts only. User supplied power
connecon ngs must be listed or cered for intended use.
• De-energize all power sources before opening enclosure.
• Avoid electrostac charge. Clean only with a damp cloth.
• Keep ends of heang cable and kit components dry before and
during installaon.
• Individuals installing these products are responsible for
complying with all applicable safety and health guidelines.
Proper personal protecve equipment, or PPE, should be ulized
during installaon. Contact Thermon if you have any addional
quesons.
FMG 10.0022X Ex eb IIC T6...T4, Ex tb IIIC T85°C…T135°C
1725 II 2 GD Ex eb IIC T6...T4, Ex tb IIIC T85°C…T135°C FM 10ATEX0058X
12
6
4
3
8
5
7
1
2 64
3 5
7

3
TerminatorTM ZL INSTALLATION PROCEDURES
1. Locate bus connecon (HPT and FP only) and
cable as shown. Cut end of cable at angle to aid
in piercing grommet. Leave addional cable for
expansion loop. See page 4 for mulple cable
installaon ps.
4. Insert banding guide into expediter and snap
into place.
2. Insert cable into expediter. If mounted on
boom or side of pipe, punch out weep hole.
Note: For HPT and FP cable, exchange grommet in
Terminator with GRW-G provided in PETK-3.
3. Slide expediter toward pipe and route cable
through support base entry.
7. Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instrucons.
8. Push excess cable back through expediter.
Tighten cap securely. Tape cable expansion loop
to pipe.
9. Mount juncon box base on expediter. Make
sure to align slots to properly orient juncon
box base. If mounng horizontally, threaded
gland holes must face downward.
5. Mount expediter to pipe using pipe band. Do
not band over cable.
6. Cut o end of cable.

Corporate Headquarters: 100 Thermon Dr • PO Box 609 San Marcos, TX 78667-0609 • Phone: 512-396-5801 • 1-800-820-4328
For the Thermon oce nearest you visit us at . . . www.thermon.com
© Thermon, Inc. • Printed in U.S.A. • Informaon subject to change.
10. Install power cable (if necessary). 11. Install quick mount terminal blocks and ghten
screws (if necessary). Complete system wiring.
Tightening torque 1.5 Nm–1.8 Nm (1.1 -lb–1.3
-lb).
12. Install juncon box lid and twist hand ght.
Insert screwdriver into ratchet slots located on
side of juncon box base.
13. Use screwdriver to ratchet on juncon box lid.
Lid will rotate 30 degrees. Lid latch mechanism
fully engaged. To remove lid, repeat steps 12
and 13 but in the opposite direcon.
Locate bus connecon (HPT and FP only) and cable
as shown. Cut end of cable at angle to aid in piercing
grommet. Leave addional cable for expansion loop.
Two Cable Layout Tips
Insert two cables into expediter.
Note: For HPT and FP cable, exchange grommet in
Terminator with GRW-G provided in PETK-3.
Power Connecon (1 to 2 Heang Cables)
Wiring Details
End Terminaon (1 Heang Cable Only)
Ground
Power Supply
Ground
L2 or N
L1
Ground
Form PN50848-0519
TerminatorTM ZL INSTALLATION PROCEDURES