manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Thermon
  6. •
  7. Cable Tester
  8. •
  9. Thermon Terminator ZL Reference guide

Thermon Terminator ZL Reference guide

For Power Connecon or End Terminaon Applicaons
Terminator
TM ZL
Lighted Power Connecon/
End Terminaon Kit
INSTALLATION PROCEDURES
2
Kit Contents
Item Quanty Descripon
1 1
Expediter Assembly
Support Cap with O-Ring
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2 1 Juncon Box Lid
3 1 Juncon Box Base with O-Ring
4 1 Nut
5 1 Banding
6 1 Banding Guide
7 1
Terminal Blocks with DIN Rail
(Refer to terminal specicaons for maximum
allowable wire size)
8 1 Juncon Box Cord
Dimensions
TerminatorTM ZL INSTALLATION PROCEDURES
Order Separately
PETK Power and End Terminaon Kits (per cable)
PETK-1 for BSX, RSX, VSX-HT
PETK-2 for KSX, HTSX
PETK-3 for HPT, FP
Item Quanty Descripon
1 1 RTV Tube
2 1 Power Connecon Boot
3 1 End Cap
4 1 Tape Strip 6" (PETK-3 only)
5 1 End Terminaon Cauon Label
6 1 GRW-G Grommet (PETK-3 only)
7 1 Ground Sleeve
IP66/Type 4X -60°C ≤Ta ≤ +55°C
Listed Heat Tracing Cable System 137M
Ordinary & Hazardous Locaons
Class I, Division 2, Groups A, B, C, & D
Class II, Division 2, Groups F & G, Class III
Class I, Zone 1, AEx eb IIC T6...T4
09.2238691,-G,-S, Ex eb IIC T6...T4
Tools Required
Cercaons/Approvals
Installaon Precauons
• To minimize the potenal for arcing and re caused by product
damage or improper installaon use ground-fault protecon.
The Naonal Electrical Code (NEC) and Canadian Electrical Code
(CEC) require ground-fault protecon of equipment for each
branch circuit supplying electric heat tracing.
• Installaon must comply with Thermon requirements and
be installed in accordance with the NEC, CEC, or any other
applicable naonal and local codes.
• Component approvals and performance rangs are based on
the use of Thermon specied parts only. User supplied power
connecon ngs must be listed or cered for intended use.
• De-energize all power sources before opening enclosure.
• Avoid electrostac charge. Clean only with a damp cloth.
• Keep ends of heang cable and kit components dry before and
during installaon.
• Individuals installing these products are responsible for
complying with all applicable safety and health guidelines.
Proper personal protecve equipment, or PPE, should be ulized
during installaon. Contact Thermon if you have any addional
quesons.
FMG 10.0022X Ex eb IIC T6...T4, Ex tb IIIC T85°C…T135°C
1725 II 2 GD Ex eb IIC T6...T4, Ex tb IIIC T85°C…T135°C FM 10ATEX0058X
12
6
4
3
8
5
7
1
2 64
3 5
7
3
TerminatorTM ZL INSTALLATION PROCEDURES
1. Locate bus connecon (HPT and FP only) and
cable as shown. Cut end of cable at angle to aid
in piercing grommet. Leave addional cable for
expansion loop. See page 4 for mulple cable
installaon ps.
4. Insert banding guide into expediter and snap
into place.
2. Insert cable into expediter. If mounted on
boom or side of pipe, punch out weep hole.
Note: For HPT and FP cable, exchange grommet in
Terminator with GRW-G provided in PETK-3.
3. Slide expediter toward pipe and route cable
through support base entry.
7. Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instrucons.
8. Push excess cable back through expediter.
Tighten cap securely. Tape cable expansion loop
to pipe.
9. Mount juncon box base on expediter. Make
sure to align slots to properly orient juncon
box base. If mounng horizontally, threaded
gland holes must face downward.
5. Mount expediter to pipe using pipe band. Do
not band over cable.
6. Cut o end of cable.
Corporate Headquarters: 100 Thermon Dr • PO Box 609 San Marcos, TX 78667-0609 • Phone: 512-396-5801 • 1-800-820-4328
For the Thermon oce nearest you visit us at . . . www.thermon.com
© Thermon, Inc. • Printed in U.S.A. • Informaon subject to change.
10. Install power cable (if necessary). 11. Install quick mount terminal blocks and ghten
screws (if necessary). Complete system wiring.
Tightening torque 1.5 Nm–1.8 Nm (1.1 -lb–1.3
-lb).
12. Install juncon box lid and twist hand ght.
Insert screwdriver into ratchet slots located on
side of juncon box base.
13. Use screwdriver to ratchet on juncon box lid.
Lid will rotate 30 degrees. Lid latch mechanism
fully engaged. To remove lid, repeat steps 12
and 13 but in the opposite direcon.
Locate bus connecon (HPT and FP only) and cable
as shown. Cut end of cable at angle to aid in piercing
grommet. Leave addional cable for expansion loop.
Two Cable Layout Tips
Insert two cables into expediter.
Note: For HPT and FP cable, exchange grommet in
Terminator with GRW-G provided in PETK-3.
Power Connecon (1 to 2 Heang Cables)
Wiring Details
End Terminaon (1 Heang Cable Only)
Ground
Power Supply
Ground
L2 or N
L1
Ground
Form PN50848-0519
TerminatorTM ZL INSTALLATION PROCEDURES

Popular Cable Tester manuals by other brands

Behringer CT100 user manual

Behringer

Behringer CT100 user manual

ANTIFERENCE ATR269 user guide

ANTIFERENCE

ANTIFERENCE ATR269 user guide

Tenmars TM-901 user manual

Tenmars

Tenmars TM-901 user manual

Genie CT10 user guide

Genie

Genie CT10 user guide

Black Box TS075A-R3 Specifications

Black Box

Black Box TS075A-R3 Specifications

Black Box LanXPLORER user manual

Black Box

Black Box LanXPLORER user manual

Psiber CableTracker 10 user guide

Psiber

Psiber CableTracker 10 user guide

TRENDnet TC-NT1 user guide

TRENDnet

TRENDnet TC-NT1 user guide

Greenlee 45395 user guide

Greenlee

Greenlee 45395 user guide

VOLTCRAFT VC731 operating instructions

VOLTCRAFT

VOLTCRAFT VC731 operating instructions

Velleman VTTEST14 manual

Velleman

Velleman VTTEST14 manual

Triax CAT6 manual

Triax

Triax CAT6 manual

Greenlee PA1594 instruction manual

Greenlee

Greenlee PA1594 instruction manual

Microtest 8751 user manual

Microtest

Microtest 8751 user manual

AEMC CA7024 TDR user manual

AEMC

AEMC CA7024 TDR user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.