
4
XT302C DELUXE PROGRAMMABLE HEAT-COOL THERMOSTAT
69-1213—1 (T8624)
Pub. No. 18-HD25D7-5
Temperature Settings
Refer to Table 2 for the default program. For 7-Day and
24-Hour Operation, the settings are the same for each day of
the week. Refer to the Owners Guide, Pub. No.22-5127-04,
for instructions on changing the default settings.
Table 2. Default Program Settings.
The Leave, Return and Sleep periods may be cleared.For
example, the daytime energy-savings period (from Leave to
Return) may not be used by the homeowner.To clear any
period, follow the instructions in the Owners Guide in the
Clearing Schedule Period
section.
Fig. 10. Display of all the segments of the LCD.
INSTALLER SETUP
The Installer Setup is used to customize the thermostat for
specific systems.Some of the options include Comfort-R™
control activation, Fahrenheit vs. Centigrade temperature
display, outdoor temperature display (requires outdoor
sensor installation), and system changeover.Installer Setup
numbers are listed in Table 3.The table includes all the
configuration options and the factory-settings for the
XT302C Deluxe Programmable Multistage Thermostat .
NOTE: For most applications, the thermostat factory-
settings apply. Review the factory settings in Table 2
and if no changes are necessary, go to the Installer
Self-Test section.
IMPORTANT
The chart CustomizingYour Thermostat found in the
beginning of the Owners Guide (see Fig. 9) must be
completed.The homeowner identifies the options
you install by referring to this chart.
Installer Setup Procedure
1. Press and hold the Information , Increase ▲,
and Decrease ▼keys at the same time until all display
segments and the first setup number displays
(all display segments appear for approximately three
seconds before the setup number displays). See
Figs. 11 and 12.
M10349
INSTALLER SETUP
NUMBER DISPLAY
(COLUMN 2 OF TABLE 3)
FACTORY SETTING OR OTHER
CHOICE DISPLAY (COLUMN 3
OR 5 OF TABLE 3)
Comfort-R™
CONTROL OFF ON
AUTO ONLY
(SYSTEM
AUTOMATICALLY
SELECTS HEAT
OR COOL)
PROGRAMMING
OUTDOOR
TEMPERATURE
DISPLAY
SYSTEM
SETTING
(HEATING
AND
COOLING
SETTING)
CLOCK
FORMAT
TEMPERATURE
DISPLAY
COOLING
DROOP
Adaptive
Intelligent
Recovery™
CONTROL
(A HONEYWELL
TRADEMARK)
7-DAY
PROGRAMMING
NO OUTDOOR
TEMPERATURE
IS DISPLAYED
AUTO/MANUAL
(SYSTEM
AUTOMATICALLY
SELECTS
HEAT OR COOL;
YOU CAN
SELECT HEAT,
COOL OR OFF.)
24-HOUR
CLOCK FORMAT
FARENHEIT (°F)
ON
ON
24-HOUR
PROGRAMMING
NO OUTDOOR
TEMPERATURE
IS DISPLAYED
MANUAL ONLY
(YOU SELECT
HEAT, COOL
OR OFF.)
24-HOUR
CLOCK FORMAT
CENTIGRADE (°C)
OFF
OFF
(CONVENTIONAL
RECOVERY)
CONSTANT
TEMPERATURE
SETPOINT
PROGRAMMING
M17110 Fig. 11. Display of Installer Setup number and option.
Aux Ht
Heat
Auto
System Fan
Off Auto
Wake
Mon
Wait
In
Room
Outdoor
Auto
Sav
AM
PM
Hold for
Cool Repl Batt
On
Recovery
DST
Cool
TueWedThuFriSatSun
LeaveReturnSleep
M17111
Set Program
Set Day/Time
Start Time Temporary Setting Enrg
Em Heat
Em Ht
Figure 9. CustomizingYour Thermostat chart,
from Owners Guide, Pub. No. 22-5127-04.
Period Time Heat
Setpoint Cool
Setpoint Fan
Setting
Wake 6:00 AM 70°F
(21°C) 78°F
(25.5°C) Auto
Leave 8:00 AM 62°F
(16.5°C) 85°F
(29.5°C) Auto
Return 5:00 PM 70°F
(21°C) 78°F
(25.5°C) Auto
Sleep 10:00 PM 62°F
(16.5°C) 82°F
(28°C) Auto