Introduction
Product Specifications
Factors Affecting Installation
Installation Procedure
Inspect Shipping Container
Inspect Contents of Container
Accessory Kit
Installing Mounting Brackets
Mounting Panel to Rack
Ground Wiring
Input Wiring
Test Voltages and Alarms
Outputs
Breaker Replacement
Circuit Breakers
Dimensions
Lugs
Maintenance
Service
3
4
6
7
7
7
8
9
9
10
11
12
13
14
14
15
16
16
16

3
© Transtector 2017. All Rights Reserved.
Introduction
Transtector’s AC Edge 240 is a compact (2U) 240Vac secondary power distribution panel featuring two, 240Vac single phase 60A
input buses with dedicated neutrals. The AC Edge provides power for a wide range of local or remote, wireless and wireline, data
and mission critical communications applications. The panel fits 19 in. or 23 in. racks (23 in. brackets sold seperately; need 2X of P/N
2001-389).
The AC Edge supports the use of six breaker output positions per line. Accepted breakers listed in the table on Page 14 range from
1A to 10A with a UL classification of QVNU2. 5A and 10A breakers are available from Transtector, sold separately and installed by site
personnel (see Page 14 for part numbers).
The front of the panel contains six LEDs:
• One on each line (labeled PWR, the LED is green when power is supplied to the unit and off when no power is supplied)
• One on each line for tripped breaker indication (labeled FA, the LED is off during normal operation and red indicating a tripped
breaker)
• One on each supression module (the LED is green when powered and functioning and red when powered and not functioning).
Form C dry contacts on the rear provide connectivity via a single 15-socket (female), D-type connector (HD-15) to remote audible/
visual alarm devices for announcing/displaying power, breaker, and bay failures. The supression modules can be replaced when
required (only when the unit is not powered, see page 14 for instructions).
Input ground connection made via a two hole compression lug on the back of the chassis. Chassis ground connection is tied to input
ground. All output connections are made via the IEC 320-C13 connectors on the back of the unit.

Installation Manual | AC Edge 240
4
Product Specifications
Electrical Specication
Nominal Universal Voltage Range 220 Vac to 240 Vac
Frequency Rating 50 / 60 Hz
Input Rating 60 A, 250 Vac per phase, max
Input Interrupt Device Not provided, building install must be capable of interupting up to a 60 A source.
Input Conguration 2 wire + PE ground each phase
Output Conguration 6, IEC 320-C13 outlets per phase (total of 12 positions not to exceed a total of
60 A output per phase and 10 A per output position). L1 input feeds L1 outputs,
L2 input feeds L2 outputs.
Breaker Output Current 1 A to 10 A single-pole, hydraulic-magnetic, non-delay, slow-trip breakers (sold
separately; see page 14 for breaker part numbers).
Output Wire Size #18 AWG to #12 AWG, depending on output breaker rating
Alarm Indicators Power L1, L2 LEDs (2): green for power on; off for power off/failure
Fuse Alarm LEDs (2): red for tripped breaker; off for normal operation
Surge LEDs (1 per module): green for good; red for failure
Alarm Relay Contacts Dry Form C for power, fuse, and bay alarm failures
Relay Contact Rating 240 Vac, 1.5 A
Bay Relay Activation 12 Vdc

5
© Transtector 2017. All Rights Reserved.
Product Specifications cont.
Mechanical Specication
Input Terminals 4 position spring-cage terminal block, #18 to #4 AWG
Output Load Terminals IEC 320-C13 receptacle
Ground Terminal Dual M6 studs on 5/8” centers
Alarm Terminals Single 15-socket, high density, D-type connector
Chassis Material 18 gauge CRS, zinc plated with black powder coat bezel
Weight (out of box) ≈ 17 lbs (≈ 7.7 kg)
Weight (shipping) ≈ 20 lbs (≈ 9 kg)
Chassis Dimensions (Nominal, without
rack mounting brackets)
3.47” H x 17.4” W x 13.5” D
(88 mm x 442 mm x 342 mm)
Rack Mounting 2RU, 19” per EIA Standard, RS-310-D (optional 23” brackets available)
Mount near ush to rack or extended up to 5” in 1 1/4” increments.
Rear Panel Safety Screw mounted, hinged access panel provides tooled access only.
Environmental Specication
Storage Temperature 14ºF to 149ºF (-10ºC to 65ºC)
Operating Temperature 14ºF to 131ºF (-10ºC to 55ºC)
Relative Humidity 90% (non condensing)
Compliance Specication
Safety IEC 60950-1:2005 (Second Edition) + Am 1:2009 + Am 2:2013

Installation Manual | AC Edge 240
6
Factors Affecting Installation
Elevated Operating Ambient
If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than
room ambient. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum
ambient temperature specified by Transtector.
Reduced Air Flow
Installation of the equipment in a rack should be such that the amount of airflow required for safe operation of the equipment is not
compromised.
Mechanical Loading
Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to the uneven mechanical
loading.
Circuit Overloading Consideration
Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits
might have on over-current protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used
when addressing this concern.
Reliable Earthing
Reliable earthing of the rack-mounted equipment should be maintained. Particular attention should be given to supply connections
other than direct connections to the branch circuits (ACEG).
Disconnect Device
A readily accessible disconnect device should be incorporated in the building installation wiring.
Warnings
This product shall be installed and serviced only by qualified personnel. The product is intended for installation in a restricted access
area. Only use tools (for example, crimping tools, dies) and components (for example, breakers and wiring connectors) approved by
recognized agencies and authorities (for example, UL, TUV, NEC).
Hazardous Voltage. Multiple power sources may be available. Disconnect all power before servicing. Before connecting input power
cables make sure input power to panel is turned off. Read and understand these instructions before installing this product. If neces-
sary, contact Transtector for technical assistance: by phone at 1.800.882.9110 or 208.772.8515. Or email us at customerservice@
smithspower.com.

7
© Transtector 2017. All Rights Reserved.
Installation Procedure
Product Warning Labels
Label indicates the potential hazards associated with installation and operation of unit.
DANGER! RISK OF ELECTRIC SHOCK. SERVICE BY QUALIFIED TECHNICIAN ONLY.
WARNING! VOLTAGE/CURRENT RATINGS. 230/240Vac; 2 WIRE + PE EACH PHASE; 60A MAX
EACH L-N.
Label indicates the potential increased temperature of the external surfaces of the chassis.
CAUTION! CHASSIS MAY BE HOT.
Label indicates the need to disconnect all power supply source prior to servicing the unit.
WARNING! DISCONNECT ALL SUPPLY SOURCES PRIOR TO SERVICE.
Label indicates LINE and Label indicates test input terminals, voltage,
NEUTRAL connections, max frequency, and maximum load current.
load current, voltage, and
frequency for permanent wire
connections.
Label indicates ground connection
location.
Inspect Shipping Container
1. If damage is suspected, request that the carrier’s representative be present during unpacking. Note: Transtector is not liable for
damages incurred during shipping.
Inspect Contents of Container
2. During unpacking, inspect panel for damage. If damaged, contact the carrier. Report details of damage to Transtector by phone
at 1.800.882.9110 or 208.772.8515, or email us at customerservice@smithspower.com.
3. Check contents of accessory kit, as listed in the table on page 8. If any items are missing, contact Transtector by phone at
1.800.882.9110 or 208.772.8515, or email us at customerservice@smithspower.com.
4. If required, prior to fastening the 19 in. or 23 in. brackets to the panel, lightly coat the bracket’s contacting surface – between the
bracket and the panel – with an anti-oxidant.
5. Fasten 19 in. or 23 in. rack brackets to panel using supplied fasteners (eight, 10-32 flat head screws). (See “Bracket Installation”
on Page 9.) Torque fasteners to no greater than 23.7 inch pounds (~2.68 Newton meter). Note: Panel brackets provide near flush
front-face mounting or extended mounting up to 5 inch in 1 1/4 inch increments.
Model: AC240V60DF 6/6
P/N: 1101-1173

Installation Manual | AC Edge 240
8
Installation Procedure cont.
Accessory Kit
Accessory Purpose Quantity Illustration
Flat Head Screw #10-32 x
3/8” with Nylock Patch
Bracket Installation 8
Flat Washer #12 Panel to Rack Installation 4
Lock Washer #12, Split Panel to Rack Installation 4
Screw #12-24 x .5” Pan
Head Phillips
Panel to Rack Installation 4
19” Mounting Bracket Rack Mounting 2
Blank Cover Breaker Blank 12
Breaker Removal Tool Assist with Breaker Removal 2
Designation Card Recording Output Assignments 2
2003-2636 RevB
BREAKER / FUSE TYPE

9
© Transtector 2017. All Rights Reserved.
Installation Procedure cont.
Installing Mounting Brackets
6. Secure mounting brackets to the sides of the panel using 4, #10-32 flat head screws provided. Torque fasteners to 23 inch
pounds. (see Figure 1)
Mounting Panel to Rack
7. Select a location for the AC Edge panel on the rack. Choose to mount power panels at topmost or highest possible rack position.
8. Note: Panel weighs approximately 17 lbs (7.7 kg). Take care to support the panel when installing panel to rack. Two persons may
be required in the following step.
9. Mount panel to rack using two sets of supplied fasteners per side (total of four #12-24 thread-forming, Phillips-head screws, split
lock washers, and flat washers.), as shown in Figure 2 below. Tighten screws to no greater than 35 inch pounds (~4.29 Newton
meter).
Torque Rating Chart
Fastener Connections Maximum Torque (inch pounds) Maximum Torque (Newton meters)
10-32 23 inch pounds 2.65 Newton meters
12-24 35 inch pounds 4.29 Newton meters
M6 55 inch pounds 6.2 Newton meters
Figure 1: Bracket Installation Figure 2: Rack Mounting

Installation Manual | AC Edge 240
10
Installation Procedure cont.
Ground Wiring
This product must be properly grounded to the facility’s ground bus. Failure to do so is dangerous to personnel and may result in
equipment malfunction.
10. Crimp ground lug to a #6 AWG stranded copper wire. One #6 AWG ground wire is the minimum requirement for 240Vac single
phase input to the panel.
11. If required, lightly coat anti-oxidant on contacting surface of the ground lug. (The ground lug is located just left of the access panel
shown in Figure 3.)
12. Fasten lug to panel using the provided M6 KEPS nuts and flat washers. Tighten to 50 - 55 inch pounds (~6.2 Newton meter).
Secure ground wire to rack bonding bar (RBB).
13. Alternate ground lug can be found inside the rear access panel (see Figure 3b). This dual lug will support wire size from 14 AWG
to 2/0 AWG. Ground lug for incoming branch power can be found inside the rear access service wiring panel (see Figure 3b). This
lug will support wire size from 14 AWG to 4 AWG.
Figure 3a: Ground wire connection to RBB Figure 3b: Ground wire connection for incoming branch power

11
© Transtector 2017. All Rights Reserved.
Installation Procedure cont.
Input Wiring
At the power source, install two, single pole, high inrush, circuit breakers (60A max) following proper wire sizing and conduit guidelines
(per NFPA 70 2011 Article 220, Chapter 9 and local/national codes).
Check that input power to the panel is off or disabled before installing input cabling and install customer provided strain relief to one of
three knockout locations located near the access panel on the top, side, and bottom of the chassis.
13. Open input panel door shown in Figure 4a.
14. Feed input cable through strain relief and label all wiring for clear identification.
15. Secure LINE 1 to top location of terminal block, NEUTRAL 1 to second position from the top, LINE 2 to the bottom position, and
NEUTRAL 2 to the 2nd position from the bottom of the input terminal block (see Figure 4a and 4b). To secure wires, follow figure
4a: (1) Strip wire to 18mm [0.70in]; (2) Fully insert wire into terminal block with latch in the open (vertical) position; (3) Fully de-
press latch into the closed (horizontal) position.
16. (Optional) For low power test purposes only, power may be fed to the unit via two IEC 320-C14 power enty modules (labeled L1
Test and L2 Test) found to the right of the input terminal block. Max power per test feed is 10A. After connecting inputs, close
input panel door and secure with captive fasteners. This door must be closed prior to supplying power to the unit. Failure to do
so can result in severe electric shock.
Figure 4a: Terminal block connection
Figure 4b: Input wiring diagram
To prevent possibility of electrical
shock, both power sources must
be disconnected from AC Edge
before servicing. Installation
must meet all local codes and
jurisdictions.

Installation Manual | AC Edge 240
12
Installation Procedure cont.
Test Voltages & Alarms
17. Confirm breakers are not installed in the front panel of AC Edge and the provided protective covers are in place.
18. Enable power to the panel via fuse, breaker, or other disconnect device.
19. The LEDs on the front panel should be lit as follows:
• PWR LED for L1 and L2 is lit (green), and
• Suppression Module LED is lit (green), and
• All other LEDs are off
Table 1 - HD15 Pin-Outs
Pin Assignment Pin Assignment
1 L1 Power Alarm NO 9 L1 Suppression Status NC
2 L1 Power Alarm NC 10 L1 Suppression Status NO
3 L2 Power Alarm NO 11 L2 Suppression Status NC
4 L2 Power Alarm NC 12 L2 Suppression Status NO
5 L1 Fuse Alarm NO 13 Common
6 L1 Fuse Alarm NC 14 Common
7 L2 Fuse Alarm NO 15 Common
8 L2 Fuse Alarm NC
20. Test continuity between pins 1-12 and any Common pin (13,14, or 15) of the HD15 connector per Table 1.
• Verify continuity (0 Ohms) for all NC pins.
• Verify an open circuit (∞) for all NO pins.
Note: Normal conditions, that is normally open (NO) and normally closed (NC), are for a normally functioning panel with power
on and no tripped breakers.
Alarms
21. If required for site management alarming, connect panel and/or bay alarm wires to the D-type connector on the rear of the panel
shown in Figure 5.

13
© Transtector 2017. All Rights Reserved.
Outputs
22. The AC Edge power panel outputs consist of 6 IEC 320-C13 connectors per phase. The panel accepts 2 feeds at 240Vac each
with dedicated neutrals. Output positions accept standard IEC 320-C14 connectors (see Figure 5).
23. Connect opposite ends of output conductors to the output loads and label all wiring for clear identification.
24. Turn off or disable fuses, breakers, or other disconnect devices feeding power to the AC Edge panel.
Note: The following steps deal with breakers. Good practice involves turning off power to the panel when installing or replacing
breakers. When that is not possible, rely on and follow established operating company or regulatory practices. However, NEVER
install breakers in a live circuit with the operator handle switched on.
25. Remove blank cover over selected breaker position. Pull the handle of the blank cover to remove. See “Breaker Replacement”
on Page 14.
26. During installation of breakers, ensure that circuit breakers are switched off.
27. Install circuit breakers in the “off” position, with ON letters oriented towards the top of the unit and OFF towards the bottom.
28. When installing breakers, record the ratings and position on the designation card shown in Accessory Kit (see page 8). Insert
card into slot below breakers.
29. Disable AC Edge output loads at the equipment.
30. Turn on output breakers.
31. Turn on or enable fuses, breakers, or other disconnect devices to feed power to the AC Edge unit.
32. Verify that the PWR LEDs are on (green), FA (fuse alarm) LEDs are off, and surge module LED is on (green) for powered line and
off if not powered.
33. Turn off one of the breakers. Expect that the FA (fuse alarm) LED is on (red).
Check the FA (fuse alarm) terminals on the rear of the panel. Expect:
• An open circuit (∞) between C and NC, and
• Continuity (0 Ohms) between C and NO.
34. Make sure all breakers are on.
35. Test power and polarity at the input of each output load.
36. Enable AC Edge ouput loads at equipment. Check loads for proper operation.
Installation Procedure cont.
Figure 5: IEC 320-C13 output positions and alarm connection

Installation Manual | AC Edge 240
14
Circuit breakers are held in place by wide plastic barbs at the top and bottom of each breaker. The barbs lock into cutouts in the top
and bottom of the two breaker cages.
Transtector provides two breaker removal tools. The tools are used together to facilitate breaker removal by depressing the barbs while
prying out the breaker.
In use, slip one tool through the slot at the top of the breaker and one through the bottom of the breaker so that the hooked end of each
tool slips into the cutouts above and below the breaker. Then pry up on the top tool and down on the bottom and pull towards the front
of the chassis to unlock the barbs and free the breaker (see Figure 6).
Figure 6: Removing a breaker
Circuit Breakers
The AC Edge 240 panel is compatible with single-pole, Carling Technologies™ M-Series or AIRPAX™ SNAPAK™ series hydraulic
magnetic circuit breakers with on/off rocker positions. All circuit breakers are slow-trip without mid-trip. Transtector sells 5A and 10A
breakers under the following part numbers:
5A Carling M-Series - Transtector Part Number 3750-289
10A Carling M-Series - Transtector Part Number 3750-290
Rating Carling Technologies™ Part Number AIRPAX™ Sensata Part Number
1 A MA1-X-02-234-5-A26-2-E R15-62-1.00A-40384-1-V
2 A MA1-X-02-234-6-A26-2-E R15-62-2.00A-40384-2-V
3 A MA1-X-02-234-7-A26-2-E R15-62-3.00A-40384-3-V
4 A MA1-X-02-234-8-A26-2-E R15-62-4.00A-40384-4-V
5 A MA1-X-02-227-3-A26-2-E R15-62-5.00A-40384-5-V
10 A MA1-X-02-227-2-A26-2-E R15-62-10.0A-40384-10-V
Breaker Replacement

15
© Transtector 2017. All Rights Reserved.
Dimensions

Installation Manual | AC Edge 240
16
Lugs
The following table is a list of standard, two-hole lugs that fit the chassis ground termination on the rear of the panel. Comparable
angled lugs may be used (45º or 90º).
Lug Style Wire Size Burndy Part No. Panduit Part No.
Straight 14-10 AWG YAV10-2TC14 -
8 AWG YA8CL-2TC14 LCD8-14A-L
6 AWG YA6CL-2TC14 LCD6-14A-L
4 AWG YA4CL-2TC14 LCD4-14A-L
2 AWG YA2CL-2TC14 LCD2-14A-Q
Maintenance
AC Edge 240 panels require no scheduled maintenance.
Service
For service (warranty or otherwise) contact Transtector by phone at +1 800.882.9110 or +1 208.772.8515, or online at
www.smithspower.com to obtain an RMA number. Transtector will contact you with cost of repair or replacement (if applicable)
before proceeding with service.

17
© Transtector 2017. All Rights Reserved.
Transtector assumes no liability in the use of this product. Transtector conveys no license under its patent rights or those of others.
Transtector reserves the right to change this product and this publication without notice.
Transtector Systems, Inc.
10701 Airport Drive, Hayden, ID 83835
Toll free +1 800.882.9110
Direct +1.208.772.8515
Fax +1 208.762.6034
Table of contents
Other Transtector Power Distribution Unit manuals
Popular Power Distribution Unit manuals by other brands

Audioroot
Audioroot eSMART TRIO manual

Xtreme Power Conversion
Xtreme Power Conversion SPD-0215 User & installation manual

Altronix
Altronix NetWay8G installation guide

Sonnen
Sonnen sonnenProtect 2500 installation instructions

Planet Networking & Communication
Planet Networking & Communication IPM-16120 user manual

SMA
SMA MULTICLUSTER BOX 36 installation guide