programmable from 1 to 10 in Fast (Thyristor) and from 10 to 20 in Normal
(Contactor) switching. Either target PF is set on LAG side and system PF falls below
target PF or if target PF set on LEAD side and system PF goes above target PF in
LEAD side, the unit checks whether the switching capacitor could be persistent or
no. If target PF isnot achieved, the relayswitches on thecapacitor bankaccordingly.
15.
OFF DELAY
In case of FIFO or Straight FIFO (SFIFO) control action, Off Delay is freely
programmable from 1 to 10 in Fast (Thyristor) and from 10 to 20 in Normal
(Contactor) switching. Either target PF is set on LAG side and system PF falls below
0.980 PF LEAD or if target PF set on LEAD side and system PF falls below
OFF_SET parameter in LEAD side, the unit checks whether the switching capacitor
could be persistent or no. If target PF is not achieved, the relay switches off the
capacitor bank accordingly.
16.
REF_BANK
The unit will switch ON and OFF the bank number selected by user in REF_BANK,
in order to detect phase sequence of inputs.
NOTE: Make sure to connect three phase capacitor bank on selected
REF_BANK number.
17.
CHECK_SEQ
This feature can use todetect phasesequence error and correct all values according
to detection. In order to this feature works, the load current should have a value
greater than zero. The unit will switch ON and OFF the bank selected by user in
REF_BANK, in order to perform auto correct. If load is nonlinear or too many sudden
changes occur in the load during this process, it may not be able to correct the
connection. In this case, user must disable non liner load temporarily and repeat the
process or can manually enter the phase sequencevalue.
18.
PHASE_SEQ
User can manually enter phase sequence value if above features fails to recognize
phase inputs due to certain conditions of nonlinear load and etc. phase sequence
value can be set from 0, 60, 120, 180, 240 and 300.
19.
MIN. BANK
In case, the need KVAR exceeds 75% of the minimum capacitor bank, the relay
switches the minimum bank on. Hence, the parameter can also be set to 100%
according to your desire.
20.
AUTO SENSING
In case, the Autosense is set to YES, the unit switches on all relays one by one. The
bank sizes will also display as they get sensed one by one and the user must
therefore be patient and wait for about 4 to 5 minutes while the autosense is in
progress. This process is vital for the smooth operation of the relay. Once all
capacitor bankscouldbe sensed, the relaywill restartfor control action after a while.