Before Connection to Power Supply
• Remove all packing.
• Check equipment and parts for damage. Report any damage immediately to the carrier and
distributor.
• Remove protective plastic coating from the side panels.
• Check that the available power supply is correct to that shown on the rating plate located on the
right -hand side panel.
E85 220-240 Volts A.C, 50 Hz, 1P+N+E, 1.65 kW, 7.2A
Location
• To ensure correct ventilation for the motor and controls the following minimum installation
clearances are to be adhered to:
Electrical Connection
• E85 provers are supplied with pre-fitted cords. Ensure unit is fitted with appropriate cord and plug.
• To access the electrical connection terminal block, grounding lug and strain relief, remove the
right hand side panel.
WARNING - THIS APPLIANCE MUST BE EARTHED / GROUNDED
Water Connection (Auto Fill Models Only)
• A cold water supply should be fitted to the water inlet (¾” BSP connection) which is located near
the rear of the right hand side of the unit.
• Alternately, a connection elbow and sealing washer is supplied with this unit for direct connection
of a ½” ID hose, and is recommended for easy installation and service.
• Connect water supply - Max inlet pressure 80psi / 550kPa.
• Turn on water supply to check for leaks.
Rack Width
• The E85 prover has been designed to accept either 18” or
16” wide trays.
• The prover comes factory set for 18” trays, to change to 16”
trays:
• Remove the RH side rack (lift and extract).
• Undo the thumb screws (A) holding the RH rack
supports (B) and turn RH rack supports around, then
re-secure with thumbscrew.
3
Installation
Installation Requirements
It is most important that this prover is installed correctly and that operation is correct
before use.
Installation shall comply with local electrical, health and safety requirements.
Rear 0mm / 0”
Left-hand side 0mm / 0”
Right-hand side 25mm / 1”
A
A
A
A
B
B
B
B
For 18” trays For 16” trays