Tycon Systems 14641 S 800 W Bludale UT 84065 tyconsystems.com Page 1
EZ-Bridge ®- LT2 Series Inial Set-Up Procedure and Checklist
Thank you for choosing the EZ-Bridge® Wireless Antenna System.
Each Antenna system is factory tested and pre-congured so that most applicaons
are truly “Plug and Play”
Some package models will require addional user-provided Ethernet Cat5/6 jumper cables to
complete the necessary connecons between each Antenna, each PoE Injector and your
Network Devices.
O Unbox all system components within the same room on a non-conducve table or oor.
O Idenfy and keep separate Antenna “A” and Antenna “B” as each will be inialized separately.
(The PoE wall pack injectors are idencal and may be used with either antenna)
Step One: Begin set-up procedure for Antenna “A”
— With the PoE wall-pack injector unplugged from AC power —
O Remove the boom cover from the antenna housing to access the connecon points.
O Insert one end of a CAT5/6 jumper cable into the center RJ45 port. (Center Port aligns with the cover)
and the other end into the “PoE” port of the injector as shown.
IMPORTANT! Before installing any devices, please read all of
the cauons and warnings contained in the system manual.
Warning! These antennas ulize (12 –24 VDC)
Do not connect to Standard PoE Power Sources.
Higher voltages will damage units and void
the warranty
O With another CAT5/6 jumper cable, insert one end into the “LAN” port of the
Injector and the other end into a spare data port of your Switch or Router that is
Connected to an Internet source as shown at the top of page 2.
Cat 5/6
Jumper
7 August 2019