Mounting order
1. u::Lux NetCon or u::Lux NetCon Power must snap into place on the top-hat rail.
2. Connect the network cable (not included in the scope of delivery) for the u::Lux Switch RJ45
to LAN1 or/and LAN .
We recommend the use of a Patchpane (taking into account the potentia equa ization) so
that a shie ded network cab e can be ead to ground or to get a better ground-contact from the
insta ation cab e to the Patch cab e. When indicated, a ready existing oca connecting
instructions must abso ute y be obeyed.
3. For the control or cascading connect the network cable (not included in the scope of
delivery) to LAN3 or/and LAN4.
4. Connect the energy supply.
A plug connector (Phoenix - MSTBA ,5/ -ST-5,08) is included in the scope of delivery.
Connect the negative supply voltage of the energy supply to Pin – VCC and the positive
supply voltage to +VCC (see Chapter General Information).
Startup
After connecting the power supply all green LEDs have to illuminate. With these LEDs the presence
of the following voltages is indicated:
1. Energy supply with supply voltage VCC.
2. Internal voltage generation 3,3 vo ts.
3. Internal voltage generation 48 vo ts (on ports LAN1 and LAN ).
If a network cable is connected to each of LAN1 – LAN4 and a physical connection (LINK) is
established, the corresponding yellow LED illuminates permanently. As soon as there is traffic on
the connection (ACTIVITY) it will be signalized by this flashing LED. Regarding the LAN ports we
recommend the connection of the following network subscribers:
LAN1: is used exclusively to connect up to 10 u::Lux Switches RJ45.
LAN : is used exclusively to connect up to 10 u::Lux Switches RJ45.
LAN3: is used to connect a PLC control or to connect another u::Lux NetCon Power module
(cascading) or a computer.
LAN4: is used to connect a PLC control or to connect another u::Lux NetCon Power module
(cascading) or a computer.
Startup order
1. Control of the green LED. All 4 LEDs have to illuminate.