ubiquoss U9264H GE-PON User manual

PON
OLT
U9264H GE-PON
Installation Guide

II
PON
OLT
U9264H GE-PON
Installation Guide
.

PON
OLT
U9264H GE-PON Installation Guide III
Preface
This preface provides the overview of U9264H user guide, which describes guide
conventions, and lists other publications that may be useful.
Introduction
This user guide describes how to install U9264H, the PON OLT of Ubiquoss.
It describes how to install U9264H and connection it to other devices.
Chapter 1 describes the name and function of each part of U9264H and Chapter 2
describes the necessary items and notes for the installation. The user is recommended
to understand U9264H and remember notes through Chapter 1 before the installation
because it will be very useful for the user to install and use U9264H safely.
What are provided with this installation user guide (operation user guide, command user
guide, and configuration user guide) describe the function, use, and setting of U9264H in
details.
This installation user guide is for the experts with the experience of installing and
managing network devices. Consequently, see other network-related references for the
professional terms that are not explained in this user guide.
Related Documents
U9264H switch manual switch manual set includes the followings. For additional information
on this equipment, refer to the following manuals.
Manual Contents
Hardware Installation Guide Switch hardware installation
Initial operating environment configuration
User Guide
Operating configuration for services
System operation, administration and
maintenance
Trouble Shooting
Notice You can download or request the latest documents and information
on the products of Ubiquoss Inc. including U9264H switch from the
website (http://www.ubiquoss.com).
This document is the manual for all the U9264H switches.

PON
OLT
Preface
Introduction
IV
Symbols in this Guide
The symbols below are used to indicate the product names and notes in the user guide.
Product Name
The name of the product (PON OLT system) is U9264H.
Description of Symbols
The user guide uses the following icons and fonts to indicate special messages for the
reader.
Note Presents the useful contents related to the user guide, the references
and data related to the product use, etc.
Caution Describes the situation that data loss and incorrect product operation
can occur, and provides the proper actions to take in the situation.
Warning Describes the situation that product damage and the user’s injury can
occur, and provides the proper actions to take in the situation.
Warning Warning: Optical Terminal
Do not look at the optical terminal directly. It could cause serious
damage to your eyes.
Warning Do not disassemble or assemble the product.
The user must not remove/attach the product cover or
disassemble/assemble the product when the power is on. Otherwise, it
can cause personal injury or property loss.

PON
OLT
U9264H GE-PON Installation Guide V
Organization
The user guide consists of four chapters and two appendices. The summary of each part is
described below.
Chapter 1. Introduction
This chapter introduces the product types and features of U9264H and the name and
function of each part as well.
Chapter 2. Installation Preparation
This chapter explains about the items necessary to install U9264H and notes for
installing and using the product. The user should fully understand the notes in this
chapter before installing the product to prevent any problem that may occur during the
installation of product.
Chapter 3. Installation
This chapter describes how to install U9264H onto a rack and connect each port of the
device.
Chapter 4. Troubleshooting
This chapter describes the problems that can occur during the installation and use of
U9264H and how to resolve them.
Appendix A. Product Spec
Appendix A describes the product specifications of U9264H.
Appendix B. Cable Spec
Appendix B describes the specifications of the cable used to connect the ports of
U9264H.

PON
OLT
Table of Content
Introduction
VI
Table of Content
Preface.......................................................................................................................... III
Introduction......................................................................................................................III
Related Documents.........................................................................................................III
Symbols in this Guide......................................................................................................IV
Organization ..................................................................................................................V
Table of Content............................................................................................................VI
List of Table.................................................................................................................VIII
List of Figure.................................................................................................................IX
Chapter 1. Introduction ..............................................................................1
Overview........................................................................................................................2
Main function and features ...............................................................................................2
Features......................................................................................................................... 3
Front Panel.......................................................................................................................3
Description on each U9264H unit.....................................................................................4
LED for each U9264H unit................................................................................................6
Fan Ventilation..................................................................................................................7
Power Supply ...................................................................................................................8
Ground Terminal...............................................................................................................9
Chapter 2. Installation Preparation .........................................................11
Notes to Take before Installation ................................................................................. 12
Do not disassemble the product.....................................................................................12
Installation site condition.................................................................................................12
Satisfying operational environment conditions ...............................................................12
Prevent static electricity..................................................................................................12
Notes to take when using power.....................................................................................12
Grounding.......................................................................................................................13
Lightening.......................................................................................................................13
Checking a rack before installation.................................................................................13
Preventing overheating...................................................................................................13
Notes to take when cleaning the product........................................................................14
Other notes.....................................................................................................................14
Checking the installation environment............................................................................14
Necessary Items for Installation................................................................................... 15
Package Items............................................................................................................. 16
Chapter 3. Installation ..............................................................................17
Selecting Installation Place.......................................................................................... 18
Mounting on a Rack..................................................................................................... 19
Connecting Power ....................................................................................................... 22
Connecting Console Terminal...................................................................................... 24
Connecting Management Port..................................................................................... 25
Operation Checking..................................................................................................... 26
Checking LEDs...............................................................................................................26
Checking Console ..........................................................................................................26

PON
OLT
U9264H GE-PON Installation Guide VII
Setting IPAddress ..........................................................................................................26
Chapter 4. Troubleshooting.....................................................................29
Troubleshooting Case..................................................................................................30
Appendix A. Product Spec.......................................................................33
Appendix B. Cable Spec ..........................................................................35
Ethernet cable.................................................................................................................36
Optical cable...................................................................................................................36
Console cable.................................................................................................................37

PON
OLT
List of Table
Introduction
VIII
List of Table
Table 1 Description on each U9264H unit ...............................................................4
Table 2 LED for each U9264H unit ..........................................................................6
Table 3 List of items necessary for Installation......................................................15
Table 4 List of Package Items................................................................................16
Table 5 Specification..............................................................................................33
Table 6 Console Cable Pin Signal .........................................................................37

PON
OLT
U9264H GE-PON Installation Guide IX
List of Figure
Figure 1. Front Panel...............................................................................................3
Figure 2. Slot layout.................................................................................................3
Figure 3. SCU..........................................................................................................4
Figure 4. PSU-AD....................................................................................................4
Figure 5. PSU-PD....................................................................................................4
Figure 6. FMU..........................................................................................................5
Figure 7. PIU-8E......................................................................................................5
Figure 8. LIU-8M......................................................................................................5
Figure 9. LIU-8T.......................................................................................................5
Figure 10. LIU-2X.....................................................................................................5
Figure 11. Rear and Side.........................................................................................7
Figure 12. U9264H AC Power Connection Diagram ...............................................8
Figure 13. U9264H DC Power Connection Diagram...............................................8
Figure 14. U9264H AC Connecting Power............................................................22
Figure 15. U9264H DC Connecting Power............................................................23
Figure 16. Connecting Console Terminal...............................................................24
Figure 17. Connecting Management Port..............................................................25


PON
OLT
U9264H GE-PON Installation Guide 1
Chapter 1. Introduction
This chapter introduces the product types and features of U9264H and the name and
function of each part as well.
The chapter consists of the followings:
Overview
Features

PON
OLT
Overview
Introduction
2
Overview
This section describes the function and features of an EPON OLT U9264H.
Main function and features
Ubiquoss U9264H, adopted the state-of-the-art PON technology, can accommodate both the
downstream and upstream 1.25G EPON optical line service(1.25G Line Card) or
downstream 2.5G/upstream 1.25G EPON optical line service(2.5G Line Card or Turbo GE-
PON Line Card).
In addition, U9264H supports not only 1000Base-X SFP modules with various distance
coverage and 10/100/1000Base-T RJ-45 type modules for Uplink to connect to the Ethernet
network.
The PON Line Card is a modular type, giving flexibility in numbers of subscribers to be
accommodated and bandwidth to be allocated the subscribers. The Uplink Line Cards also
have modular type. U9264H provides scalability in PON OLT so that any PON Line Card can
be plugged into any of 8 dedicated PON OLT slots.
Structure of PON OLT
Ubiquoss PON OLT system consists of;
Optical Line Terminal(OLT) that is connected to the Internet Core Network
in the Central Office, performs IP routing and Ethernet switching, and
provides passive optical subscriber line
Remote Nodes (RN) that consists passive optical distribution network and
splits an optical line up to 32(In case that GPON is 64) without any electric
power feed and management.
Optical Network Terminal (ONT) that provides the passive optical
subscriber line interface.
U9264H supports various functions exceeding those expected in the existing Ethernet
switches, including Quality of Service(QoS) function, Management function that allows to
take prompt actions against the problems with the system and a subscriber line, Security
function that secures subscriber information safely, and Subscriber Management function
that secures a user’s right from illegal users such as cracker.

PON
OLT
U9264H GE-PON Installation Guide 3
Features
Front Panel
Figure 1. Front Panel
Figure 2. Slot Layout
P
S
U
P
A
Slot
P
I
U
1
Slot
P
I
U
2
Slot
P
I
U
3
Slot
P
I
U
4
Slot
L
I
U
5
Slot
S
C
U
A
Slot
S
C
U
B
Slot
L
I
U
6
Slot
P
I
U
7
Slot
P
I
U
8
Slot
P
I
U
9
Slot
P
I
U
10
Slot
P
S
U
P
D
Slot
Rack
AC Power
Unit
Fan
Rack Fan Fan
DC Power
Unit

PON
OLT
Features
Introduction
4
Description on each U9264H unit
Table 1 Description on each U9264H unit
Unit Description Remarks
SCU System Management Block and Switch Configuration Unit Common
PSU-PA AC 110/220V Power Module: Supporting redundancy. Common
PSU-PD DC -48V Power Module: Supporting redundancy. Common
FMU Fan Module Unit: Modular unit Common
PIU-8E EPON 1.25G 8-port Line Card
The applicable EPON optical module is SFP type. - Note (1) Line Card
PIU-4E2 EPON 2.5G 4-port Line Card Optional
LIU-8M 1000Base-X 8port Line Card
The applicable optical module is SFP type - Note (2) Line Card
LIU-8T 10/100/1000Base-Tx 8-port Line Card Line Card
LIU-2X 10GBase-xR 2-port Line Card Line Card
Note (1) – As for the applicable PON optical modules, only the approved products are
supported.
Note (2) - As for the applicable PON optical modules, only the approved products are
supported.
Figure 3. SCU
Figure 4. PSU-AD
Figure 5. PSU-PD

PON
OLT
U9264H GE-PON Installation Guide 5
Figure 6. FMU
Figure 7. PIU-8E
Caution Risk of explosion if battery is replaced by an incorrect type.
Dispose of used batteries according to the instrocutions.
Figure 8. LIU-8M
Figure 9. LIU-8T
Figure 10. LIU-2X

PON
OLT
Features
Introduction
6
LED for each U9264H unit
Table 2 LED for each U9264H unit
Unit LED Status Description
GREEN ON Power ON
PWR ORANGE ON Reset or Power Fail
ON System Critical Alarm ON
CR RED
OFF System Critical Alarm OFF
ON System MajorAlarm ON
MJ ORANGE OFF System MajorAlarm OFF
ON System MinorAlarm ON
MN ORANGE OFF System MinorAlarm OFF
GREEN ON FAN normal status
FAN ORANGE ON FAN Alarm status
GREEN BLINK SCUActive operation mode.
ACT/ST ORANGE ON SCU Standby operation mode
ON USB Memory Busy status
USB/BUSY GREEN OFF USB Memory Run status
ON Management Ethernet Link Up
SCU
LNK/ACT GREEN
BLINK Management Ethernet TX/RX status
OFF Power: Normal
PWR GREEN
ON Power: ON
OFF Power: OFF
PSU-PA/
PSU-PD FAIL RED
ON Power: Fail
OFF Power: OFF
RUN GREEN
ON FAN:ACT
OFF FAN: STOP
FMU FAIL RED
ON FAN: FAIL
GREEN ON Power ON
PWR ORANGE ON Reset or Power Fail
OFF No Link
ON PON Interface link
GREEN BLINK PON Interface TX/RX Status
PIU-8E P1~8
ORANGE OFF Normal Status
GREEN ON Power ON
PWR ORANGE ON Reset or Power Fail
OFF No Link
ON PON Interface link
GREEN BLINK PON Interface TX/RX Status
OFF Normal Status
LIU-8M
LIU-8T
LIU-2X P1~8(2)
ORANGE ON Alarm on PON Interface

PON
OLT
U9264H GE-PON Installation Guide 7
Fan Ventilation
The Fan Vent is the place that the external cold air is supplied through to prevent the product
from being overheated.
Figure 11. Rear and Side
Caution U9264H has the structure that the Fan Module (FMU) is located on
the top of the device so that the cooling is done through the hot air
rising from the bottom (convection cooling). Consequently, if the top
and the bottom of the device are blocked, the internal warm air and
the external cold air cannot be circulated properly and the product
can be overheated.
Ground terminal
Ventilation Hole

PON
OLT
Features
Introduction
8
Power Supply
U9264H uses AC or DC to supply power to the system, and it provides two terminals that
provide power to the system for power redundancy as shown below.
Figure 12. U9264H AC Power Connection Diagram
Figure 13. U9264H DC Power Connection Diagram
Power Switch
Power Port
Fuse Terminal
Power Switch
Power Terminal
Status LED
Status LED

PON
OLT
U9264H GE-PON Installation Guide 9
The power switch is used to turn on or off the power supply. If the power supply is out of
order, set the power switch of the applicable power supply to OFF (O direction) before
replacing the power supply. The status of the power supply is displayed through the power
display LED on the front of the device.
Note U9264H provides two power supplies for power redundancy in order
to provide stable power. For power redundancy, each power input
terminal should be connected to different power sources. In case a
power supply has a problem and fails to provide power properly, the
power redundancy function allows the other power supply to provide
power to the system so that the system can seamlessly operate
without any disturbance. This power redundancy does not require any
additional action as long as the power is supplied from two different
power supplies.
Ground Terminal
A ground terminal is used to connect the system and the ground.
Warning For the electric safety, the product administrator and user should
ground the product before supplying power to the product. If the product
is not grounded, static electricity or sparks can be generated and the
product can be damaged by a surge or a thunderstorm

Table of contents
Other ubiquoss Network Hardware manuals
Popular Network Hardware manuals by other brands

Intersil
Intersil HWB3163 user guide

Ubiquiti
Ubiquiti ES-10X quick start guide

Nortel
Nortel BayStack 100 Series Setting up

ATTO Technology
ATTO Technology iPBridge 2700C Installation and operation manual

PIKA
PIKA REbus Beacon installation manual

ADTRAN
ADTRAN NetVanta Analog Modem Dial Backup Interface... quick start guide

IBASE Technology
IBASE Technology FWA6504 user manual

Huawei
Huawei CZ36E-20Z quick guide

Lindy
Lindy 2X RJ-45 Short manual

Cisco
Cisco WAVE-574-K9 - Wide Area Virtualization Engine... Hardware installation guide

Paradyne
Paradyne iMarc SLV 9820-2M installation instructions

ActionTec
ActionTec WCB5000 user guide