
Fixings Supplied
3
Fixings not shown at actual size.
Tools Required For Assembly
• Allen Key (supplied)
• 19-22mm spanner (supplied)
Assembly
• Please lay out all nuts and bolts and check lengths before assembly. It is recommended
that the carton is cut open and spread out on the oor and used as a protective surface
during assembly. Refer to the assembly diagrams as necessary.
• Important - while every precaution has been made in the manufacture of this product, care
must be taken during assembly in case sharp edges are present.
• Remove all transit packaged parts from the inside of the grill body before assembling.
Ref Description Illustration Qty
M6 x 12
Bolt 51A
Technical Data
CE Approval: 2797/21
Main Burner Heat Input: 3.9kW (main burner) x 3 =11.7kW
Searing Burner Heat Input: 4.8kW
Side Burner Heat Input: 3.1kW
Injector Size: Main burner 0.95mm, searing burner 1.05mm, side burner 0.85mm
Gas/Pressure: Butane-28mbar/Propane-37mbar
Gas Consumption: 1411 grams per hour
Gas Category: I3+
Total Heat Input: 3.9kW (main burner) x 3 + 4.8kW (searing burner) + 3.1kW (side burner)
=19.6kW
0359DL05646
Global Headquarters
Universal Innovations
Kilcoole Industrial Estate
Kilcoole
Co. Wicklow
Ireland
A63 DX27