Utile L95HP Guide

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
1 IC182
Installation
Operation
Maintenance Instructions
Model L95HP –L175HP
Gas Compressor
Serial Number
Site Location
Installation Date

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
2 IC182
Page
General ……………………………………………………………………………………..………………………. 3
Operating Principle …………………………………………………………………………………………………. 3
Health and Safety ……………………………………………………………………………………..………………………. 4
Technical Specification …………………………………………………………………………………………………. 5
Packaging ……………………………………………………………………………………..………………………. 5
Storage ……………………………………………………………………………………..………………………. 5
Handling …………………………………………………………………………………………………..………………………. 6
Installation ……………………………………………………………………………………..………………………. 6
Pre Start-up Checks …………………………………………………………………………………………………. 8
Start-up ……………………………………………………………………………………..………………………. 8
Protective Devices …………………………………………………………………………………………………. 8
Operating Notes ……………………………………………………………………………………..………………………. 9
Stopping Procedure …………………………………………………………………………………………………. 9
Lubrication ……………………………………………………………………………………..………………………. 9
Maintenance ……………………………………………………………………………………..………………………. 10
Troubleshooting …………………………………………………………………………………………………. 11
Check Blade Wear …………………………………………………………………………………………………. 11
Blade Inspection ……………………………………………………………………………………..………………………. 12
Reassembly after Blade Inspection ……………………………………………………………………………………. 12
Cylinder Renewal ……………………………………………………………………………………..………………………. 12
Change Bearings and Seals…………………………………………………………………………………………………. 13
Reassembly ……………………………………………………………………………………..………………………. 13
Spare Parts ……………………………………………………………………………………..………………………. 14
After Sales Service …………………………………………………………………………………………………. 14
Spare Parts List …………………………………………………………………………………………………. 15
Warranty ……………………………………………………………………………………..………………………. 16
Warning
Read the installation and maintenance information before commencing work on this equipment. Your attention is drawn to
the health and safety information on page 4. Until the equipment into which the machine has been incorporated and the
said equipment declared to be in conformity with the Machinery Directive, they must not be put into service.
Foreword
The L series rotary gas compressor has been developed based on many years of experience in the compressor and vacuum
pump industry. Using modern design techniques and production methods coupled with rigorous testing and high quality
standards ensure this series of machines have a long, efficient and reliable service life.
These operating instructions have been written for all personnel who have responsibility to the machine, it contains all the
necessary information required for the machine to have a long trouble free service life. This manual must be stored near
the machine and read before attempting any work on it.
Ensure that all operation and maintenance is only performed by competent and trained personnel and any repairs use only
original parts from the manufacturer.
Contents

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
3 IC182
General
The normal routine of running the machine is very simple. If it is carried out strictly at all times, many years of trouble free
service can be expected.
We emphasise two points of paramount importance-
1. Filtration of incoming air of gas 2. Lubrication
If possible provide a logbook so that the operator can enter daily readings. After several months a record will show whether
the machine is performing as it did originally. If readings are to be taken the following are all that is required. Inlet and
outlet air temperatures, suction conditions and oil drip rate.
A typical layout for the log book is shown in the table below.
Machine Log Book
Date
Inlet Gas Temp.
Discharge Gas Temp.
Inlet Conditions
Oil Drip Rate.
Operating Principle
Rotary sliding vane compressors and vacuum pumps are multi-cell machines, which work on the displacement principle.
They provide a constant, low-pulsation supply of air or gas.
The machines have a cylindrical bored housing. The rotor, which is also cylindrical, is fitted eccentrically in the cylinder so
that a crescent-shaped working chamber is formed. Movable rotor vanes are fitted in the longitudinal grooves in the rotor;
centrifugal force and the force of the air or gas presses the blades against the cylinder-housing wall when the rotor turns.
The vanes divide the crescent-shaped working chamber into cells of different sizes. As the rotor turns, the cell volume on
the intake side increases, and the cell draws air in at low pressure, at which point is open to the intake delivery line. As the
rotor continues to turn, the cell is closed (see fig 1) and the volume of the cell decreases. This causes the enclosed air or
gas to be compressed (see fig 2) and forced out through discharge delivery line under atmospheric pressure.
The machine can only be run in one direction, which is indicated by an arrow on the cylinder. The direction of rotation must
not be reversed.
General
Operating Principle
Fig. 1
Discharge
Intake
Fig. 2
Discharge
Intake

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
4 IC182
Read the installation and operating instructions carefully.
Rotating machinery and pressurised components, which may contain toxic, flammable or otherwise hazardous media are
potentially dangerous equipment if not operated and maintained correctly. It is imperative that all users of such equipment
fully educate themselves to the potential dangers and satisfy themselves that the personnel responsible for installing,
testing, commissioning, operating and maintaining the plant are competent to do so. Instruction manuals are provided for
guidance but must assume some basic level of competence by users. If there are any doubts or ambiguities concerning
correct procedures, ask Utile Engineering. DO NOT TAKE RISKS.
Certain machinery can generate high levels of noise which can be harmful if exposed to it for lengthy periods of time.
Various codes of practice are in existence and users must ensure that adequate precautions are taken to prevent a health
hazard to employees or third party.
Equipment with internal pressures above or below ambient pressures can create a hazard. Before attempting to investigate
problems, service or maintain equipment, it must be safely depressurised or pressurised to ambient conditions. Also since
the gaseous medium may be flammable, toxic, corrosive or otherwise hazardous it may be necessary to purge the
installation with an inert gas, such as nitrogen. Special precautions are necessary for certain gases and the user must
ensure that adequate procedures are implemented.
Moving parts of machinery must not be touched and all such parts must be adequately guarded. Suitable guards are
provided and must be securely retained in position at all times.
Before commencing maintenance, servicing or making other adjustments, the prime mover and other equipment must be
isolated electrically or otherwise immobilised to prevent accidental start-up. In this vein, a fully qualified electrician should
carry out all electrical work and all electrical equipment should be isolated before it is touched and pneumatic or hydraulic
controls depressurised and made safe. Procedures must also exist to ensure that electrical or other inputs cannot be
restored accidentally during the maintenance or service period.
Safety trips, emergency stop-buttons and other such devices (if fitted) are to be checked regularly to ensure that they
continue to function correctly and will protect the installation and personnel in the event of an emergency.
NO attempt should be made to touch the machine whilst it is rotating. Particular care is needed when checking rotor
clearances. Any movement of rotors may trap fingers.
Most machines, certain pipes and ancillaries become hot during operation whilst certain machines with sub-zero inlet
temperatures may result in very cold surfaces. If it is possible for personnel to come into contact with such surfaces
unknowingly or accidentally they should be guarded.
If severe vibration is observed, the cause of this should be immediately investigated and the situation rectified. Excessive
vibration can lead to fatigue and other failures. Similarly, if during operation a significant change is noticed in the level of
vibration, noise, temperature or any other parameter, the cause of such changes must be determined, and the cause
rectified. Inlet filters must be inspected regularly so that liquid or debris is not allowed to enter the machine, which could
cause damage and consequently injury to personnel.
During routine maintenance, coupling alignment should be checked for misalignment.
Only approved lubricants must be used and quantities, etc must be checked regularly.
Before restarting after servicing, all nuts, set screws, etc must be checked for tightness, check all joints, for leaks and carry
out purging as necessary before introducing the process gas. Also, before start-up, check the machine inlet and outlet
isolating valves are open both non-return valves (if fitted) are the correct orientation.
Adjacent pipework and equipment must not impose undue forces and moments on the machinery flanges.
All welding work must be carried out be an approved gas coded welder.
In order to prevent reverse rotation of machines, it is ESSENTIAL that a non-return valve be installed in the inlet pipework.
Otherwise a hazardous situation can arise during a normal shutdown or if the prime mover power supply is interrupted for a
period of time.
The environment around the installation may need to be monitored in order to detect gas leaks etc., and consideration
must be given to the installation of gas detecting equipment, and the class of electric equipment.
All personnel working in or passing through the area should be adequately warned by signs and trained to exercise
appropriate safety precautions. Ensure the correct personal protective equipment is worn at all times.
Health and Safety

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
5 IC182
Nameplate Data
Machine Model eg L95
Machine Serial Number
(Always quote this in
correspondence)
Logo
Temperature Classification
450C –T1 300C –T2
200C –T3 135C –T4
100C –T5 85C –T6
CE Marking
Contact address & numbers
Zone Rating
0 –Very High Protection - Gas Area
1 –High Protection - Gas Area
2 –Normal Protection - Gas Area
Year of
Manufacture
Ex
Mark
Equipment Group
I –Mines
II –Surface Indus
Gas/Dust
G –Gas
D - Dust
Protection Category
1–V.High Protection
2–High Protection
3–Normal Protection
Technical Specification
The model, machine serial number, year of manufacture, temperature class and zone rating for the machine appear on the
machine data plate, other machine data can be found in the following table.
Units
L95HP
L130HP
L175HP
Maximum Pressure
Bar
2.00
2.00
2.00
Speed –Maximum
R.P.M.
1600
1600
1600
Speed - Minimum
R.P.M.
700
700
700
Volume at 1 Bar at Max. Speed (Air)
m3/hr
185
275
395
Volume at 1 Bar at Max. Speed (Bio Gas (SG=0.8))
m3/hr
180
265
380
Absorbed Power at 1 Bar at Max. Speed (Air)
kW
7.5
11.5
15.0
Absorbed Power at 1 bar at Max. Speed (Bio Gas)
kW
7.0
10.0
13.0
Maximum Ambient Temperature
C
40
40
40
Surface Temperature at Max. Press. at Max. Speed (Air)
C
Moment of Inertia
kg m2
0.015
0.021
0.029
Noise Level at 1 metre
db (A)
88 - 92
88 - 92
88 - 92
Weight
kg
85
105
125
Note: Machine must not be used on any other gas than originally specified. Utile Engineering must be consulted if traces of
any other gas are introduced into the machine.
Packaging
The packaging conforms to the relevant regulations. The symbols used on the packages are
shown on the right. The machines are bolted down on a pallet and therefore should not
move during transportation and either cased or shrink wrapped for general protection. The
ancillary components are packed suitably within the case. The packaging and contents
should be received in good condition. When unpacking do not remove the inlet/outlet
protection covers.
The contents should be inspected against the advice note, notify Utile Engineering within 3
days of any items, which are damaged or are missing, followed by a written claim within
seven days of the goods being delivered.
Storage
If the machine is not required for immediate installation, the machine should be stored in a clean, dry area protected from
the weather. The intake and discharge port covers must remain in position until the machine is installed. We recommend
that the shaft be turned a few revolutions by hand to ensure the machine is running free every month until the machine is
installed.
The green protective coating on the shaft remains effective for approximately 1 year. If the machine is stored for a longer
period of time, the coat must be renewed.
Technical Specification
Packaging
Storage
Top /
This Way Up
Fragile

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
6 IC182
Handling
Skilled personnel working in accordance with safe working practices must carry
out the lifting of machines. Before lifting the correct equipment must be
available. Cranes, jacks, slings, and lifting beams must be capable of carrying
the weight of the machine to be lifted. The lifting eyebolt situated in the top of
the cylinder and a crane hook must be used when lifting or moving the
machine (see fig 3). Do not use the machine ports or the shaft extension for
lifting or moving the machine.
For weights see above in Technical Specification.
Installation
Before commencing installation, a site specific risk assessment, method statement and hazard identification list must be
completed and adhered to. All work must be carried out in a safe area. Utile Engineering trained personnel or those trained
to an equivalent standard should carry out installation, any claims for damage due to faulty installation will be void. The
machine is delivered ready to be connected, with only the removal of the intake and discharge protection covers. All
warning labels and instructions must be observed and retained with the machine. Before installation, ensure there is no
damage to the machine and that it turns freely by hand.
Typical tools required for installation include: -
Set of spanners Pipe Wrenches Set of screwdrivers Hacksaw
Hammer / mallet Drill (low voltage)
Typical bolt tightening torques are: -
Bolt Tightening Torques
Size
Torque
Size
Torque
M4
4.00 Nm
M12
70.00 Nm
M5
6.00 Nm
M16
100.00 Nm
M6
10.00 Nm
M20
150.00 Nm
M8
18.00 Nm
M24
250.00 Nm
M10
40.00 Nm
Location
The machine should be installed in a clean, dry, well-ventilated area. Allow adequate space and facilities for service,
inspection and future expansion. A minimum of 0.75m of working space around the machine is recommended. Adequate
space around the motor and machine, particularly any fan inlets, is also necessary to facilitate cooling airflow. If several
machines are installed in close proximity, care must be taken to ensure there is no recirculation of exhausted warm air.
Foundation
Simple slab type foundations, designed for static loadings only are satisfactory. The foundations should raise the machine to
a reasonable height above the floor for convenient service and inspection. The use of anti-vibration mounts between the
base and foundation are recommended, these absorb the vibrations generated by the rotating parts of the machine and
insulate it against any vibration in the surrounding environment. Ensure that the anti-vibration mounts are evenly loaded.
Foundation bolts should fix the base.
Electrical Supply and Connection
The voltage rating of the supply must be compatible with the motor and the fittings. All electrical installation must be
carried out by a qualified electrician and in accordance with current regulations and within the framework of the Electricity
of Work Regulation 1990. Ensure all electrical connections, plugs, sockets etc are secure before switching the supply on.
Earthing
It is important that the motor enclosure is soundly earthed by metallic earth continuity conductor, or by separate earth
bonding, but in all cases the installation must be made and tested and approved for this feature by a qualified installer
before the supply is applied to the motor.
Handling
Installation
Fig. 3

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
7 IC182
Fitting Pulleys and Couplings
These should be bored to our standard limits (details supplied upon request) and fitted to the shaft with a screwing motion.
On no account should they be driven on. Tapping of fitments onto the machine shaft with a hammer or mallet, causes
bearing damage. This results in an increase in bearing noise and a significant reduction in bearing life. Attention should be
paid to the guarding of all moving parts.
Drive Alignment
The rotor shaft must always be horizontal. There are three basis modes of misalignment, these are angular, parallel and
axial (shown in fig. 4).
Flexible Coupling
1. Remove any dirt, oil, etc. from all mating surfaces. Place bush in hub and match
half holes on both shafts.
2. Place setscrews loosely in threaded holes. Mount assembly in desired position on
shafts.
3. Tighten setscrews. Place disc/flexible coupling in position, and bring the shafts
together obtaining the manufacturers assembled length for the coupling given in
their instructions.
4. To check for angular alignment: (see fig. 5)
Rotate the coupling through 90°and measure the distance between the faces.
Repeat adjusting the shafts until four identical measurements are obtained.
To check for parallel alignment: (see fig. 5)
Place a straight edge across the coupling. The hubs will be in correct alignment
when the straight edge contacts the 4 points squarely.
Drive Belts
1. Remove any dirt, oil, etc. from all mating surfaces. Place bush in hub and match
half holes on both shafts.
2. Mount assembly in desired position on shafts ensuring both shafts are parallel and
in correct alignment, use a straight edge, a correctly aligned drive will contact both
pulleys squarely (see fig. 6).
3. Fit driving belts. Measure span of belts between
tangent points of the two pulleys. A deflection of
1.5mm is obtained for every 100mm of the
measured span. Compare the deflection force
required with the table. If the force required is
according to the table then the tension is suitable.
Too little force indicates under-tension and visa-
versa.
4. The belts should be tensioned towards the high side, to allow for the tension drop
after the belts have been run-in. Belt tension should be checked daily in the first
week after installation/renewal.
Warning:
Excessive tension on the pulleys will damage the bearings and lead to a probable shaft rupture.
Belts, which become charged electrostatically, must not be used in hazardous atmospheres.
Belt
Section
Force Required to
deflect belt 1.5mm per
100mm span (kgf)
SPZ
0.5 to 0.8
SPA
1.0 to 1.5
SPB
2.0 to 3.1
SPC
4.1 to 6.1
Parallel Alignment Check
Angular Alignment Check
Fig. 5
Angular Misalignment
Parallel Misalignment
Axial Misalignment
Fig. 4
Correct pulley alignment
Span Distance
Fig. 6
Installation

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
8 IC182
Pipework
The connecting pipework must be completely clean, dry and free from internal rust or scale.
When fitting the intake and discharge pipework it is essential that adequate supports be provided and that it is properly
aligned to prevent excessive strain being placed upon the machine, flexible pipe should be placed in the pipeline to
remove this strain.
During installation care must be taken to ensure that no foreign matter enters the machine or serious damage may
result.
An intake filter should be fitted into the intake side to prevent any particles from entering the machine.
Use P.T.F.E. tape only as a jointing medium since surplus from jointing compounds will damage the blades if drawn
into the machine.
When the machine is delivering into or exhausting from a receiver, or working with a system having a large storage
capacity, it is essential to fit a non-return valve in the pipework, preferably on the intake side to prevent the machine
from running in reverse on shutdown.
Arrange both the intake and discharge pipework so that any condensate flows away from the machine.
If user is installing their own protective switches and other devices these must be suitable for operation in the zone
classified.
All pipework and fittings must comply with IGEM/UP/2 or the national standard for the country of installation.
Pre Start-up Checks
Before starting the machine for the first time after installation, maintenance or after a long downtime, make the following
checks: -
Ensure all the anchor bolts for the machine, base and motor are securely fastened.
Check that the machine is free running by turning the shaft by hand through a few revolutions.
Flick start the motor to check that the direction of rotation agrees with the arrow on top of the machine cylinder. Note
this should be completed with the coupling/drive belts removed.
Recheck coupling/drive alignment and retension (see page 7).
Ensure all equipment is installed and earthed in accordance with current legislation.
Check all piping connections.
If the system is to be pressure tested, all gauges and pressure switches must be isolated or removed. Maximum purge
or pressure test is 1.50 times the working pressure.
Check all protective devices ensuring they are working correctly.
Ensure personnel are adequately protected from accidental contact with all dangerous equipment.
Fill the oil tank with Shell Turbo T68 oil or equivalent (see lubrication), prime the oil lines to the machine.
Instruct the operating personnel that the machine is operational.
Protective Devices
All pressure and temperature switches must be set and tested at the desired set point by simulating the set point in actual
operation.
With the machine running at the duty pressure after warming up, adjust the discharge temperature switch downwards to
actuate and stop the machine. Reset the switch at the cut out temperature plus 10C - 15C in order to avoid false tripping
from small and reasonable increases above normal levels.
Adjust the high pressure cut out switch in the same manner and reset at working pressure plus 10%.
After the first 50 running hours, remove the cone shaped mesh strainer from the inlet, clean and replace. If a large amount
of debris has been collected run for a further 50 hour period repeating the process until the filter remains clean.
Start-up
Proceed as follows: -
i. When starting compressors the intake valves are fully open. Compressors can usually be started against normal
discharge pressure.
ii. Some compressors are piped with a manual start-up bypass valve from discharge to intake, for pressure equalisation
during startup, This must be fully opened before startup.
iii. Start the drive motor and bring the machine up to operating speed.
iv. When full speed is reached slowly close the manual start-up bypass valve.
v. Check and adjust the lubricator drip rate to that indicated in the lubrication section.
vi. Check all protective devices and controls making sure they are working correctly.
Pre Start-up Checks
Protective Devices
Start-up

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
9 IC182
Operating Notes
Daily, check the oil drip rate through the indicator. Fill the oil tank.
After the initial running in period, check the belt tension. Belt squeal denotes a loose belt that requires tightening.
Inspect the filter fitted to the inlet, regularly clean and renew the element when necessary.
Excessive discharge temperature for normal operation as indicated by the rise in temperature shown in the log book
indicates inadequate cooling, faulty lubrication or a dirty intake filter. The machine should be stopped and inspected.
Check the machine internally for wear every 10,000 running hours. (see Inspection and Service)
The blade depth should be checked after the initial 2,000 running hours and thereafter every 5,000 running hours for
wear and renew if the rubbing tips have worn to a depth of 67mm. (see Check Blade Wear).
Condensate if allowed to enter the machine can cause severe blade wear.
If adjustment of the oil drip rate is required (see lubrication).
If machine is on a standby service, run for a few minutes each week.
Stopping Procedure
Proceed as follows: -
i. Trip out or Stop the drive motor.
Lubrication
Prime oil pipes prior to initial start and every time machine is
dismantled for service, as serious damage will occur if the
machine runs unlubricated. The lubrication system is a total
loss system, recycling of oil is not recommended
The recommended grade of oil is Shell Turbo T68 the typical
physical characteristics are shown above.
Oil feed rate per calibrated oil drip measuring device is shown
on the right. These are available from our spares department.
The feed rates can be increased/decreased pro-rata with
speed.
Oil pump adjustment
The pump is adjusted to the correct flow rate when despatched from our works. If it
found necessary to alter the oil feed, then proceed as follows using fig. 7:
1. Remove the cover (1) to expose two pistons (2).
2. Slacken off the locknuts (3) and adjust the feed as required.
To increase the flow, turn the two adjusting screws (4) clockwise, or anti-clockwise to
decrease.
Lubricator Maintenance
Refill the oil reservoir regularly to ensure that the oil level is not allowed to fall to a
point where air can be drawn into the oil pump. Use only clean, new oil of the
recommended grade. At least once a year, or if the machine has been out of use for a
long period, the oil pump must be thoroughly flushed out with petrol/kerosene to clear any oil residues that may have
solidified in the control ducts. For this operation we recommend the following procedure: -
1. Stop the machine and disconnect all the oil pipes from the oil pump.
2. Remove oil reservoir, drain oil and wash out with petrol/kerosene. Drain again ensuring all oil residues are
removed. Replace reservoir and reconnect the oil feed pipe (oil reservoir to oil pump).
3. Fill the reservoir with petrol/kerosene to cover oil filter element. Loosen oil feed pipe connection at oil pump end
until all air has been expelled. Re-tighten pipe.
4. Start the machine under no load condition and run until petrol/kerosene begins to flow from oil pump discharge
points. This operation takes approximately 10 –15 minutes and providing the machine is run under no load
conditions, no damage will occur.
5. Stop machine, drain oil reservoir and fill with recommended grade of oil. Ensure all oil pipes are primed. Reconnect
oil delivery pipes (oil pump to machine) and start up.
Operating Notes
Stopping Procedure
Lubrication
Fig. 7
Fig. 7
Shell Turbo Oil
T68
Kinematic Viscosity
@ 40C cSt
100C cSt (IP71)
68
8.8
Viscosity Index (IP226)
102
Pour Point C (IP15)
-6
Density @ 15C kg/l (IP160)
0.876
Flash Point (PMCC) C (IP34)
210
Demulsibilty Number max. (IP19)
210
Neutralisation Number mg KOH/g (IP139)
0.15
Model
Speed 900 Rpm
Speed 1400 Rpm
Air
Biogas
Air
Biogas
L95HP
7.25
9.00
11.25
14.00
L130HP
9.00
11.25
14.00
17.50
L175HP
10.75
13.50
16.75
20.75
Oil feed rate per calibrated oil drip indicator using oil pump timing drive speed ratio 1:1

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
10 IC182
Maintenance
Fully trained and competent staff must carry out any maintenance work. Utile Engineering offers contract maintenance
services if required contact our service department.
When carrying out any maintenance and inspections always follow the health and safety guidelines on page 4.
A regular correct maintenance plan is essential to good operational reliability and a long service life for your machine. As
operating conditions vary, no exact timings can be specified for wear checks, repairs and inspections, however the following
plan can be used as a guide until time scales to better suit the machines environment are found.
The machine, ancillaries and surrounding area should be kept as clean as possible.
Ensure all items are properly held and supported during all aspects of maintenance as not to pose a problem for health and
safety. Observe all lifting points and apply care when handling the equipment.
Ensure all machines and associated pipework have cooled down sufficiently before touching and attempting any
maintenance.
Typical tools required for maintenance include: -
Set of spanners Pipe Wrenches Circlip Pliers
Set of screwdrivers Vernier Gauge / Micrometer Two-leg Pulley drawer
Set of Allen Keys Hammer / mallet Feeler Gauges
Typical bolt tightening torques can be seen on page 6.
New gaskets must be fitted every time the machine is dismantled.
Bearings and seals are recommended to be replaced after 15000 operating hours or 2 years whichever is sooner.
Blades must be replaced regardless of wear after 20000 operating hours as failure due to fatigue could cause serious
damage.
After maintenance the machine and equipment must be treated, as new and all pre-commissioning checks should be made.
Install all protective devices and controls properly after completion of work. Ensure all cabling, unions and guards are
correct, secure and in place. Dispose of any used oil and cleaning solutions as prescribed by law.
Maintenance
MAINTENANCE PLAN
DAILY CHECKS
QUARTERLY CHECKS
TASK
CHECK
TASK
CHECK
Check / Fill lubricator reservoir
Check machine for blade wear.
Check Belt condition/Tension (Hourly for
running in period).
Check control panel for wiring, cleanliness and
function of all panel features. (if applicable)
Drain all vessels, condensate traps, outlet
filters manually
Check function of emergency stop button and
local motor isolator. (if applicable)
Clean inlet filters (Daily for 1st week).
Check motors for excessive vibration and
damage.
Check function of pressure gauges.
WEEKLY CHECKS
Check function of non-return valves
Check lubricator drip rate
Check function of pressure relief valves
Check belt condition / tension
Clean inlet filters (After for 1st week).
Run Standby machine for a few minutes.
YEARLY CHECKS
MONTHLY CHECKS
Clean lubricator and oil lines
Check function and operation of all valves.
Check flanges and joints for leaks.
Check differential pressure across filters (clean
and replace if necessary).
Clean internally vessels, condensate traps,
filters (including elements).
Check function and operation of autodrains /
condensate lines.
Inspect machine internally (at least once a
year)
Clean fins on machine and motors

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
11 IC182
Fig. 8
Scribe mark with rod
resting on rotor, turn
rotor and scribe mark
with rod on blade
Troubleshooting
The following table shows some typical problems and the remedies.
Note: If assistance is required in determining or correcting the fault with the machine then contact our service department.
1. Check Blade Wear
When carrying out any maintenance and inspections always follow the health and
safety guidelines on page 4. Fully trained and competent staff must carry out any
maintenance work.
1.1 Carry out the following procedure after the first 2,000 running hours
and repeat every 5,000-hour interval. Record all measurements.
1.2 With the pump stationary and with the system drained, remove the
eyebolt or plug in the top of the machine cylinder and insert into the
hole beneath a pointed measuring rod 6mm dia x 150mm long until
contact is made with the rotor (see fig. 8). Scribe a mark on the rod.
Slowly rotate the shaft by hand until the rod drops onto the tip of the
blade, scribe a second mark on the rod. Measure the amount of
movement and renew the blades if this exceeds 6mm. Replace the plug
or eyebolt.
Troubleshooting
Check Blade Wear
SYMPTONS
CAUSES
REMEDIES
Machine revolves in wrong direction
Incorrect connection of motor terminal
Re-arrange terminal connection
Discharge air temperature excessive
1. Machine operating at higher duty than
specified.
1. Check rating.
2. Blocked intake filter.
2. Clean intake filter.
3. Insufficient or wrong lubrication.
3. Use correct lubrication and feed rates.
4. Warped / Sticking blades
4. Replace blades
Excessive blade wear
1. Insufficient lubricant to cylinder.
1. Inspect & clean oil lines, oil holes.
2. Incorrect lubricant.
2. Use correct lubricant.
3. Dirty inlet air/gas.
3. Clean & inspect intake.
4. Excessive operating temperature
4. See remedies for excessive discharge
temperature.
Abnormal noise, vibration or periodic
knocking
1. Worn bearing.
1. Replace bearing.
2. Excessive blade wear.
2. Replace blades & check lubrication
3. Erratic cylinder wear.
3. Rebore, redowel & check lubrication.
4. Insufficient lubrication
4. Increase lubrication rate
5. Rotor contacting coverplates
5. Check temperature, pressure &
internal clearances
6. Drive misalignment
6. Realign and retension drive.
7. Warped rotor blades.
7. Replace rotor blades.
8. Excessive liquid carryover.
8. Drain all points.
Pressure cannot be built up or only up
to a certain extent.
1. Worn blades.
1. Replace rotor blades.
2. Improper belt tension.
2. Adjust belt tension.
3. Sticking relief valve.
3. Clean and replace.
Slipping of belts
1. Improper belt tension.
1. Adjust belt tension.
2. Worn belt.
2. Replace with new ones.
Overheating of electric motor
1.Overloading of motor due to excessive
working pressure.
1. Lower working pressure.
Machine does not start
1. Breakdown of electric current
1. Contact power company.
2. Malfunction of motor.
2. Check motor.
3. Wrong motor connections.
3. Check electrical connections.
Shaft partially or totally locked
1. Faulty bearing
1. Replace bearing.
2. Foreign particles in machine.
2. Disassemble machine and remove
foreign particles.
3. Machine seized.
3. Repair machine.

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
12 IC182
2. Blade Inspection
When carrying out any maintenance and inspections always follow the health and safety guidelines on page 4. Ensure all
electric circuits are isolated and cannot be switched on, and that the pipeline system has been cleared and is pressurised to
atmospheric pressure. Fully trained and competent service personnel must carry out any maintenance work.
Inspection commences with the dismantling of the rear end, after removal of the oil tank and pipes.
2.1 Remove three screws (32) and remove fancowl (11) loosen the set screw in fan and remove fan (10).
2.2 Undo four screws (31) and take off end cap (5) complete with mechanical seal seat (20). Inspect the faces of the
mechanical seal for wear and replace complete seal if either are worn. Remove the mechanical seal (20) taking
care not to damage the carbon face. If the seal is stuck on the shaft, carefully prise free with a screwdriver
between the locating ring and the locknut (28).
2.3 Remove the locknut (28). Do not loose the bearing flange.
2.4 Remove six bolts (30) and withdraw coverplate (3) complete with outer race of bearing (23) and seal (21).
2.5 Measure and note the thickness of the gasket (49) fitted between the cylinder (1) and coverplate (3).
2.6 The blades (7) can now be removed form their slots for inspection.
Check the blades for lamination, chipping or charring on their rubbing edges and for concave wear. For any other
wear other than polished surfaces or if the blade depth has reduced to 67mm or below then replace the blades.
When replacing blades a complete set must be replaced. The old blades must be disposed of according to the local
government laws. When fitting new blades, ensure they slide freely in their slots and if necessary remove high
spots with fine emery cloth. Lightly smear blade surfaces with oil before reassembly.
2.7 Inspect the visible part of the cylinder bore and rotor for any signs of excessive wear or scuffing and for excessive
slot wear. If there is any sign of cylinder rubbing completely dismantle the machine. Factory reconditioning is
recommended, but if work has to be carried out on site, we advise you most strongly to contact Utile Engineering
Service Department for advice.
During inspection, determine if the correct oil is being used. Bearings, cylinder wall, rotor/shaft assembly and
blades should show a polished surface with a light film of oil. Hard baked deposits indicate inferior oil, dirt or
excessive temperature.
3. Reassembly after Blade Inspection
Reassemble in the reverse order, taking note of the following points: -
3.1 Ensure the blades are orientated correctly in their slots.
3.2 If coverplate gaskets have been replaced, it is essential that they are the same thickness as the originals,
otherwise internal clearances will be affected and could cause serious damage. Lightly smear the gasket with oil
before replacing.
3.3 Replace coverplate assembly, screws, locknut and tab washer, mechanical seal, end cap, fan and fancowl. Before
reconnecting oil pipes ensure they are primed.
4. Cylinder Renewal
With the rear end coverplate (3) already removed as described in 2 for blade inspection, the next stage is to withdraw the
rotor complete with the drive end coverplate (2).
4.1 Take off timing belt (51), drive pulley (48). Slacken clamp screw (34) in support plate (12) and remove complete
with oil pump assembly.
4.2 Undo four screws (31) and take off end cap (4) complete with mechanical seal seat (20). Inspect the faces of the
mechanical seal for wear and replace complete seal if either are worn. Remove the mechanical seal (20) taking
care not to damage the carbon face. If the seal is stuck on the shaft, carefully prise free with a screwdriver
between the locating ring and the locknut (28).
4.3 Remove the locknut (28).
4.4 Remove six bolts (30) and withdraw coverplate assembly (2) complete with rotor assembly. Measure and note the
thickness of the gasket (44) fitted between the cylinder (1) and coverplate (2). The cylinder can now be replaced
or rebored.
4.5 When reboring the cylinder the maximum allowable increase in diameter is 0.8mm to give a final bore of
185.00mm. Contact Utile Engineering for appropriate assembly instructions in this case.
Blade Inspection,
Reassembly after Blade Inspection,
Cylinder Renewal,

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
13 IC182
5. Removal of Bearings and Seals
With the rear end coverplate (3) already removed as described in 2 for blade inspection.
5.1 Using a two-leg pulley drawer the roller bearing inner race (23) can be removed from the shaft.
5.2 Should the seal sleeve (9) show signs of wear, then it can be removed by careful machining.
5.3 The bearing seal (21) and roller bearing outer race (23) can be pressed out of the coverplate for inspection.
5.4 Inspect the bearing, renew if it shows any signs of wear or pitting.
5.5 Examine the bearing seal (21) and renew if the wiping lip is worn or damaged.
With the drive end coverplate (2) already removed complete with rotor as described in 4 for cylinder renewal.
5.6 Using a two-leg pulley drawer the roller bearing inner race (22) can be removed from the shaft.
5.7 Should the seal sleeve (9) show signs of wear, then it can be removed by careful machining.
5.8 The bearing seal (21) and roller bearing outer race (22) can be pressed out of the coverplate for inspection.
5.9 Examine the bearing seal (21) and renew if the wiping lip is worn or damaged.
6. Reassembly Procedure
This section only applies when using original bore size or replacement cylinder. Before commencing reassembly ensure that
all components are perfectly clean and oilways are clear. Lightly smear the shaft with oil to assist assembly.
The correct clearances for these machines are: -
L95HP
L130HP
L175HP
Drive End Coverplate / Rotor
0.25mm / 0.30mm
0.25mm / 0.30mm
0.25mm / 0.30mm
Rear End Coverplate / Rotor
0.10mm / 0.13mm
0.10mm / 0.13mm
0.10mm / 0.13mm
Rotor / Cylinder
0.10mm
0.10mm
0.10mm
Reassembly should start with the preparing of the rotor and shaft assembly by the fitting of the replacement seal sleeve (if
required) and the inner races of the both roller bearings.
6.1 The seal sleeve (9) are retained on the clean shaft using LOCTITE 648 adhesive or equivalent, and should be
pushed hard against the rotor face. It is essential that the width of the seal sleeve is identical to the one it is
replacing or internal clearances may be effected causing serious machine damage.
6.2 Both roller bearing inner races can now be fitted onto the shaft ensuring the bearings and any shims are fitted to
the correct ends.
Starting at the drive end
6.3 Position the bearing seal (21) into position in the coverplate (2) ensuring that the tension spring is facing the rotor.
6.4 Press the outer race of roller bearing (22) into position in the coverplate (2).
6.5 Lay the rotor/shaft assembly on the bottom of the cylinder (1), ensure the cylinder is orientated correctly.
6.6 Ease coverplate (2) onto the rotor/shaft.
6.7 The whole bearing assembly can be locked onto the shaft with the locknut (28). Set clearance.
6.8 When fitting the mechanical seal (20), wipe over the shaft with soapy water to assist the assembly, the seal can
then be eased onto the shaft and pushed against the locknut. Replacement seal seats should be lubricated for
easier fitting in the end cap.
6.9 The end cap (3) can now be fitted with the gasket (45) and any appropriate shims.
6.10 Fit new o-rings (24) into the coverplate grooves. If coverplate gasket (45) has been replaced, it is essential that
they are the same thickness as the originals, otherwise internal clearances will be affected and could cause serious
damage. Lightly smear the gasket with oil before replacing.
6.11 Place drive coverplate assembly onto cylinder (1) via location dowel and bolt with six screws (30) and with
coverplate gaskets (45) in place.
6.12 Check rotor / cylinder clearance.
Change Bearings and Seals,
Reassembly Procedure

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
14 IC182
Reassemble rear end
6.13 Refit sliding blades (7) in their slots after lightly smearing with oil and removing any high spots with fine emery
cloth. Ensure the blades are orientated correctly in their slots.
6.14 Position the bearing seal (21) into position in the coverplate (3) ensuring that the tension spring is facing the rotor.
6.15 Press the outer race of roller bearing (23) into position in the coverplate (3).
6.16 Fit new o-ring (24) into the coverplate groove. If coverplate gasket (45) has been replaced, it is essential that they
are the same thickness as the originals, otherwise internal clearances will be affected and could cause serious
damage. Lightly smear the gasket with oil before replacing.
6.17 Place rear coverplate assembly onto cylinder (1) via location dowel and bolt with six screws (30) and with
coverplate gaskets (45) in place.
6.18 Position the bearing loose flange in place. The whole bearing assembly can be locked onto the shaft with the
locknut (28).
6.19 When fitting the mechanical seal (20), wipe over the shaft with soapy water to assist the assembly, the seal can
then be eased onto the shaft and pushed against the locknut. Replacement seal seats should be lubricated for
easier fitting in the end cap.
6.20 The end cap (5) can now be fitted with the gasket (45) and any appropriate shims.
6.21 Position fan (10) on the shaft, with the set screw. Refit fancowl (11) onto supports with screws (32).
Check that the shaft rotates freely by hand before refitting lubrication system.
6.22 Reposition support plate (12) complete with oil pump assembly and tighten with clamp screw (34). Refit drive
pulley (48) and timing belt (51). Prime oil pipes before use.
7. Spare Parts
A stock of the main wearing parts at the installation site is important to the constant availability and smooth running of the
machine. We recommend the following parts and quantities to be kept in stock at the installation site.
Description
Part Number
Quantity
L95HP
L130HP
L175HP
Blade
S 8797/1
S 8797/2
S 8797/3
5
Roller Bearing –Drive End
H 1120
H 1120
H 1120
1
Roller Bearing –Rear End
H 1119
H 1119
H 1119
1
Mechanical Seal
F 1113
F 1113
F 1113
2
Bearing Seal
F 1067/V
F 1067/V
F 1067/V
2
O-Ring
F 1070
F 1070
F 1070
2
Gasket –Flange
S 1170/1
S 1170/1
S 1170/1
2
Gasket –Coverplate
K 1032
K 1032
K 1032
2
Gasket –End Cap
S 8544/1
S 8544/1
S 8544/1
2
Timing Belt
P 1023
P 1023
P 1023
1
Drive Belt / Drive Coupling
1 set
Always quote the machine serial number when ordering spare parts.
After Sales Service
Contact the address or telephone number shown at the bottom of each page or our local distributor, for any after sales
service, maintenance or service problems.
Contract maintenance, service exchange machines or a site visit by a Utile Engineering Service Engineer can also be
arranged in the same manner.
Utile Engineering can also provide Training Programs for all your requirements, from maintenance repair to operator and
supervisor training. They are structured to give specialist knowledge of our products and procedures including use of
authorised spares. The enacting of the Health and Safety at Work Act focused attention on the responsibility of all parties,
manufacturers, users and repairers on the repair of equipment. We strongly recommend that repairs should be carried out
to the original specification using authorised replacement parts where necessary.
Spare Parts
After Sales Service

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
15 IC182
No.
DESCRIPTION
PART NUMBER
QTY
L95HP
L130HP
L175HP
1
CYLINDER
S 8500/1
S 8500/2
S 8501
1
2
COVERPLATE –DRIVE END
S 13084/2
S 13084/2
S 13084/2
1
3
COVERPLATE –REAR END
S 13084/1
S 13084/1
S 13084/1
1
4
ENDCAP –DRIVE END
S 13085/2
S 13085/2
S 13085/2
1
5
ENDCAP –REAR END
S 13085/1
S 13085/1
S 13085/1
1
6
ROTOR/SHAFT ASSEMBLY
S 13086/1
S 13086/2
S 13086/3
1
7
BLADE
S 8797/1
S 8797/2
S 8797/3
5
8
FLANGE
M 1268
M 1268
M 1269
2
9
SEAL SLEEVE
S 13081
S 13081
S 13081
2
10
FAN
S 8185/4
S 8185/4
S 8185/4
1
11
FANCOWL
S 8787
S 8787
S 8787
1
12
SUPPORT PLATE
S 8680
S 8680
S 8680
1
13
FANCOWL SUPPORT
S 8768
S 8768
S 8768
1 SET
14
HOUSING –OIL PUMP
S 8987
S 8987
S 8987
1
15
SHAFT –OIL PUMP
S 8683
S 8683
S 8683
1
16
ENDCAP –OIL PUMP HOUSING
S 8688
S 8688
S 8688
1
17
STEM ADAPTOR
S 8912/1
S 8912/1
S 8912/1
2
18
STEM ADAPTOR
S 8912/3
S 8912/3
S 8912/3
2
19
OIL PUMP
T 1035
T 1035
T 1035
1
20
MECHANICAL SEAL
F 1113
F 1113
F 1113
2
21
BEARING SEAL
F 1067/V
F 1067/V
F 1067/V
2
22
ROLLER BEARING –DRIVE END
H 1119
H 1119
H 1119
1
23
ROLLER BEARING –REAR END
H 1120
H 1120
H 1120
1
24
O-RING
F 1070
F 1070
F 1070
2
25
SEALED BALL BEARING
H 1052
H 1052
H 1052
2
26
CIRCLIP
B 1065
B 1065
B 1065
2
27
THRUST WASHER
B 1066
B 1066
B 1066
1
28
LOCKNUT
B 1142
B 1142
B 1142
2
29
KEY
N 1044
N 1044
N 1044
1
30
HEX HEAD SCREW
G 1083
G 1083
G 1083
12
31
SOCKET HEAD CAP SCREW
G 1116
G 1116
G 1116
8
32
HEX HEAD SCREW
G 1072
G 1072
G 1072
5
33
HEX HEAD SCREW
G 1071
G 1071
G 1071
8
34
SOCKET HEAD CAP SCREW
G 1059
G 1059
G 1059
2
35
CSK SCREW
G 1052
G 1052
G 1052
3
36
SPRING WASHER
B 1022
B 1022
B 1022
4
37
OIL QUILL
S 1898
S 1898
S 1898
1
38
BANJO CONNECTOR
R 1044
R 1044
R 1044
4
39
REDUCING CONNECTOR
S 8958/4
S 8958/4
S 8958/4
4
40
TEE
S 1898/3M
S 1898/3M
S 1898/3M
1
41
ELBOW
R 1168
R 1168
R 1168
2
42
ADAPTOR
R 1084
R 1084
R 1084
4
43
TUBING NUT
R 1152
R 1152
R 1152
12
44
GASKET - COVERPLATE
K 1032
K 1032
K 1032
2
45
GASKET –ENDCAP
S 8544/1
S 8544/1
S 8544/1
2
46
GASKET - FLANGE
S 1170/1
S 1170/1
S 1170/1
2
47
EYEBOLT
A 1013
A 1013
A 1013
1
48
TIMING PULLEY - DRIVE
P 1020
P 1020
P 1020
1
49
TIMING PULLEY - DRIVEN
P 1021
P 1021
P 1021
1
50
BUSH –DRIVEN PULLEY
P 1022
P 1022
P 1022
1
51
TIMING BELT
P 1023
P 1023
P 1023
1
Parts List

GAS COMPRESSORS / BOOSTERS GAS & AIR MIXING SYSTEMS AIR BLOWERS & VACUUM PUMPS
The Utile Engineering Co. Ltd. Irthlingborough, Northamptonshire, NN9 5UG, ENGLAND
Telephone: + 44 (0) 1933 650216 Facsimile: + 44 (0) 1933 652738 Email: [email protected] www.utileengineering.com
16 IC182
Warranty Claim Conditions
Utile offers a 12-month warranty against faulty parts and workmanship. This does not include components used in the
production of packages, where the appropriate manufacturers warranty applies.
1. The warranty period commences from the first day that the operator receives the machine.
2. The warranty covers defective parts or workmanship used in the manufacture of the machine.
3. The operator must notify the company promptly of any failure (using the appropriate procedure –indicated below).
Please note: The company is not liable for any claim where: -
1. Damages or delay or any other consequential cost associated with the alleged defect, are incurred.
2. Malfunction caused by fair wear and tear, abnormal conditions of use, accident, neglect or misuse of equipment, or
improper storage.
3. Deviation from operating specifications or other special terms of sale.
4. Improper operation, maintenance or repair.
5. Damage resulting during shipment or installation by other than company authorised personnel.
6. Freight charges for goods returned to the company’s premises.
No allowances will be made for repairs or alterations carried out without the company’s written consent or approval.
Claim form
To make a claim complete the form below and send, phone, fax or email us at the address at the bottom of the page.
Warranty Claim Form
Your Details
Name:
Company Name:
Company Address:
Telephone:
Fax:
E-mail:
Machine Details
Serial Number:
Model:
Site Location:
Supplier Name:
Installers Name:
Date Commissioned:
Name of Person responsible for Maintenance:
Operating Hours a Day:
Duty Details
Speed:
Gas Flow:
Pressure:
Further Information
Warranty
Other manuals for L95HP
1
This manual suits for next models
1
Table of contents
Other Utile Air Compressor manuals
Popular Air Compressor manuals by other brands

Meec tools
Meec tools 007341 operating instructions

Stanley
Stanley Fatmax TAB 200/10/24V Instruction manual for owner's use

BAE Audio
BAE Audio 10DC instruction manual

Sullivan-Palatek
Sullivan-Palatek D110PKU user manual

California Air Tools
California Air Tools 10020C-22060 owner's manual

Atlas Copco
Atlas Copco XAS 67 Dd C3 APP instruction manual