Velopex EXTRA X MK V User manual



This equipment can only be serviced by technically qualified
engineers, trained on Velopex machines, and is not designed
to be serviced by the end user other than as specified in this
manual.
Extra-X & Xtender.


4
18
7
9
10
23
527
11
14
6
13
12
26 28 29
Worldwide - Developer Pourer (Non USA)
Worldwide - Fixer Pourer (Non USA)
1 Velopex X-Ray Film Processor - Left Side
2 Lid Lock
3 Film Collector
4 Endo Slide
5 On/Off Power Switch
6 ‘Run’ Sensor
7 Viewer Cover
8 Daylight Loader viewing Window
9 Daylight Loader Lid Lock
10 Hand entry port/Glove
11 Daylight Loader Lid
12 Daylight Loader - Left Side
13 Daylight Loader Coupling Points/Studs
14 Film Entry Guide
15 Transport Module
26 Fast Cycle Initiation Sensor
27 Display
28 High Temp. Setting Sensor
29 Service Technician Interface
30 Water Re-Circulation Tubes
30


22
27
© April 2007
6
TROUBLE SHOOTING INSTALLATION
OPERATION
MAINTENANCE

(W)
(H)
(D)
Specification
H
D
W
Width (W) 510mm / 20”
Depth (D)
Inc. Loader
470mm / 18½”
740mm / 29”
Height (H) 340mm / 13½”
Weight: Empty
Full Tanks
21Kg / 46¼lb
27Kg / 59½lb
Tank Capacity 3.8litres / 6¾Imp Pints each
Operating Temperatures:
Developer
Fixer
Water- should not exceed 280C
(82.40F)
25.50C (770F) / 300C (860F)
300C (860F) / 330C (91.40F)
Electric Supply 100-120V, 200-240V, 50/60Hz
Warm-up Time 10 min. approx.
Film Feed Speed 470mm / 18½” per min.
Max. Film Width 260mm / 10¼”
Processing time*: Dry
Wet-Endodontic
High Speed
4 min. approx.
2 min. approx.
2 min. approx.
Input Power 1150W
Environmental Conditions: Indoor use Only
Environment Temperature 50C-260C (410F-78.80F)
Maximum Relative Humidity 80%
* in the unit’s first few cycles, processing time can vary between
four and five minutes. Then the process time will stabilise around four
and a half minutes.

INSTALLATION
½
⅓
⅞
INSTALLATION

INSTALLATION
NB: If the machine has been shipped or stored in excessive heat, allow time for it
to cool to below 78.8oF (26oC) before installation. Otherwise the safety trip might
close the unit down which will require resetting by a service engineer.
78.8oF (26oC) 41oF (5oC)
INSTALLATION

INSTALLATION
NB: If the machine has been shipped or stored in excessive heat, allow time for it
to cool to below 78.8oF (26oC) before installation. Otherwise the safety trip might
close the unit down which will require resetting by a service engineer.
78.8oF (26oC) 41oF (5oC)
The output side of the Main On/Off faucet / valve must have a ¾” male
thread (see diagram on page 1). The faucet / valve should be situated in
such a position that it can be easily turned off each day.
IMPORTANT NOTE: The water inlet hose supplied with this machine is not a
standard Domestic Appliance Hose. It is fitted with a water flow restrictor valve
designed to deliver water at a max. rate of 0.27gal/min (1.0Itr./min). It is suitable
for all installations where the mains water supply is rated between 0.2 & 10.0 Bar.
However, for installations without mains water supply, e.g.: where a header tank
is employed (min. height 6ft. (1.83m) above machine) a standard hose without
restrictor must be used and the flow regulated to 0.27gal/min (1.0Itr/min) with the
separate Control Valve.
NOTE: The Drain Pipe should not rise higher than 4.0 in. (102mm) below the
bottom of the machine (see page 1).
6
INSTALLATION

INSTALLATION
NOTE: For unpacking and lifting the machine into position it is important to have
assistance.
The machine comes in a single carton containing:
Machine in “darkroom” configuration, Operator’s Manual, Hoses, Electrical Cord,
Transport Module Turning Tool, Cleaning Brush, Chemical Change Chart and a box of
Cleaning Tablets (UK only).
1. Familiarise yourself with the layout of the machine by referring to illustrations
at the front of this manual. It is useful to refer to these illustrations as you
progress through the manual.
NOTE: Pictures are for instruction only and are not necessarily identical to product.
2. Lift the machine from the carton and position on counter top. Remove
outer and inner packaging, including carry-straps and tape securing
film-catcher. The transport modules are protected by internal packing
pieces: these must be discarded.
3. Connect the two Water Waste hoses to the back of the machine (labelled
‘water overflow’ and ‘water drain’).
4. Cut hoses to allow 8-12 inches (200–300mm) to be inserted into the waste
outlet stand-pipe, ensuring no loops or kinks are left in them. Place hoses
in drain, and see diagram – they must not rise higher than the outlet on the
back of the machine.
WARNING: Any rise in the height of these pipes above the level of the outlet on the
machine will cause incomplete drainage, and could cause the machine to flood.
Keep Dry This Side Up Fragile
INSTALLATION

INSTALLATION
NOTE: For unpacking and lifting the machine into position it is important to have
assistance.
The machine comes in a single carton containing:
Machine in “darkroom” configuration, Operator’s Manual, Hoses, Electrical Cord,
Transport Module Turning Tool, Cleaning Brush, Chemical Change Chart and a box of
Cleaning Tablets (UK only).
1. Familiarise yourself with the layout of the machine by referring to illustrations
at the front of this manual. It is useful to refer to these illustrations as you
progress through the manual.
NOTE: Pictures are for instruction only and are not necessarily identical to product.
2. Lift the machine from the carton and position on counter top. Remove
outer and inner packaging, including carry-straps and tape securing
film-catcher. The transport modules are protected by internal packing
pieces: these must be discarded.
3. Connect the two Water Waste hoses to the back of the machine (labelled
‘water overflow’ and ‘water drain’).
4. Cut hoses to allow 8-12 inches (200–300mm) to be inserted into the waste
outlet stand-pipe, ensuring no loops or kinks are left in them. Place hoses
in drain, and see diagram – they must not rise higher than the outlet on the
back of the machine.
WARNING: Any rise in the height of these pipes above the level of the outlet on the
machine will cause incomplete drainage, and could cause the machine to flood.
Keep Dry This Side Up Fragile
INSTALLATION

INSTALLATION
INSTALLATION

INSTALLATION
INSTALLATION

INSTALLATION
this MUST be wiped clean before filling
with Developer.
INSTALLATION

INSTALLATION
this MUST be wiped clean before filling
with Developer.
-
(USA Re-Circulation Plumbing Layout with
Re-Circulated Water Supply)
(USA Re-Circulation Plumbing Layout with
Mains Water Supply)
INSTALLATION

INSTALLATION
(USA Re-Circulation Plumbing Layout
with Mains Water Supply)
(USA Re-Circulation Plumbing Layout
with Re-Circulated Water Supply)
Water
USA - /
Worldwide - Blue/Grey
For Water Re-Circulation remove
tubes from packaging. Dip tubes
ends into a cup of boiling water
for at least 30 seconds and swiftly
sleeve onto the fittings. Screw the
elbow connector onto the water
inlet. Adjust the screw on the valve
to position 1 (see diagram below).
16.
INSTALLATION

INSTALLATION
(USA Re-Circulation Plumbing Layout
with Mains Water Supply)
(USA Re-Circulation Plumbing Layout
with Re-Circulated Water Supply)
Water
USA - /
Worldwide - Blue/Grey
For Water Re-Circulation remove
tubes from packaging. Dip tubes
ends into a cup of boiling water
for at least 30 seconds and swiftly
sleeve onto the fittings. Screw the
elbow connector onto the water
inlet. Adjust the screw on the valve
to position 1 (see diagram below).
16.
INSTALLATION

Plug in electric cord and switch on
mains power supply. The machine
will then run through a high speed
cycle of approx. 2.5 minutes.
OPERATION
This manual suits for next models
1
Table of contents
Other Velopex Dental Equipment manuals
Popular Dental Equipment manuals by other brands

Amanngirrbach
Amanngirrbach Artex BN user manual

Amanngirrbach
Amanngirrbach ceramill multi-x operating instructions

Acteon
Acteon X-MIND prime 3D ceph Service manual

Sirona
Sirona HELIODENT DS Concise Operating Instructions

Durr Dental
Durr Dental VistaScan Nano Easy Installation and operating instructions

Acteon
Acteon I-Surge user manual

Schick
Schick USBCam2 user guide

SCHEU
SCHEU IP-120 Operation manual

DentalEZ
DentalEZ StarDental Titan LubeFree Five Star instruction manual

Vatech
Vatech PaX-Reve3D installation manual

Dentsply Sirona
Dentsply Sirona Retainer Brite manual

B.A. International
B.A. International Ultimate BASE280 Instructions for use