VENTOMAXX Z-WRG RONDO-Plus User manual

Decentralized
Assembly Instruction
Room Ventilation
Technical Changes Reserved 03.2016 © Ventomaxx International GmbH
Safety Indication
Z-WRG RONDO-Plus
according to DIN 1946- Part 6
measured according to DIN EN 20140-10 (former DIN 52210)
tested in accordance with the principles of the building supervision´s conventions
for the sonic test beds; in agreement with NABau UA DIN 4109 Beiblatt 1 00.71.02.
measured according to EN ISO 717-1; test bed according to EN ISO 140-1
Operating Guidelines Vers. 1.25
Please read the following instructions carefully before the first operation of Z-WRG Plus.
You will gain important information in order to operate and service your new room
ventilator correctly. Ventomaxx excludes his liability, if the following references
are neglected.
LAW
Straight Through the Wall
With a central
Control Unit
to control from 1 up to 6 devices
General building supervision approval No. Z-51.3-247
Ventomaxx InternationalGmbH Herzog Georg Platz 4 84028 Landshut www.ventomaxx-international.com

Security Advices
Caution!
Save Device From Moisture and Wetness!
Always Remove the Electronic Connection Before You Open the Device!
All persons that are involved in the assembly, installation and maintenance of the device have to be qualified
appropriately. Observe these operating guidelines and the general approval from the construction supervision
strictly! Missing documents will be sent to you quickly after a request.
The ventilation device is operated with low voltage. The control unit is connected right to the grid. The control
of the device must only be connected to the planned electrical voltage and frequency that fits the description
on the nameplate of the device exactly.
The cables entry/entries of the UP Control must not be loaded on tension! Towards the device
there has to be enough cable length. Otherwise the cable can be damaged which can lead to a
fatal electric shock.
For cleaning and revision the device has to be turned off and all operations with it have to be stopped.
Bigger dirt in as well as on the device must only be cleared up by a specialist. The electric circuit has
to be interrupted on all poles.
The cleaning of the room sided cover must only be carried out with a wet cloth. The ingress of water or other
liquids into the device must be avoided. If this happens however, immediately disconnect the power from the
grid by pulling the power plug or switching off the fuse of the device. Don´t reactivate the device and ensure
that no unauthorized activation can happen.
First approve that the packaging and the single accessories are in a perfect condition. Especially have a close
look on the external power cable and the power cable towards the ventilation unit. They also have to be in a
perfect condition. There must not be any kinks or damages.
Security Advices
(pp. 3 - 5)
Electronic Installation
Operating Guidelines
Assembly/ Installation Instruction
(p. 2)
(pp. 6-8)
(pp. 9-14)
Preparation of the Wall Opening/ Electrical ConnectionPage 4
Assembly of the Telescope Unit Type LAW, Straight Through the WallPage 5
General Assembly PrerequisitesPage 3
End Assembly on the Room Side- Electrical Connection
Page 6
End Assembly on the Room Side / Interior Housing
Page 7
Assembly of the Central Control Unit
Page 8
General Guidelines / Warranty
Page 9
Structure / Control Panel
Page 10
Operating Mode / Program Functions
Page 11
Configuration Mode / Operational Settings
Page 12
Status Reports / Filter Exchange
Page 13
Maintenance / Filter Exchange
Page 14
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 02

Z-WRG RONDO Plus room ventilation devices are easy to install in all common wall structures and end almost
flush on the inside as well as on the outside due to a correct assembly and installation.
It is a modularized system in order to enable the preparation already in the shell construction phase.
The Z- WRG System is funded on a central control of the ventilation devices. The central control unit is
connected to the grid (alternating current/AC) with 85-260V, 50-60Hz. The ventilation units are connected to the
central control unit via star shaped bell wires. The distance between the central control unit and the farthest
ventilation unit should not exceed 50 meters.
Please note:
The integration of the ventilation device into the wall requires openings in the outside wall that have to be built
during the construction. The required opening has to fulfill the requirements of the upcoming figure. It has to be
200mm high and 190mm wide. This assembly and installation instruction shows the integration of a ventilation
device in a monolith composition of the outside wall. Please check which kind of composition the relevant wall
has. Besides, only use the clamping elements that the producer dictates.
Depending on the attributes of the wall different prescription or rules have to be observed. (e.g. for a façade that
contains rockwood, etc.). Thus the installation has to be carried out by a specialized firm. If you are not sure,
which craft can be considered for the assembly or which tools or auxiliary means are necessary for a
professional installation, please contact Ventomaxx! Always consider the notes of the device manufacturer/
machine supplier while using them. Do not forget to wear the recommended protective clothing and equipment
(e.g. a mask, eye guards, gloves, etc.)
Consider with the selection of the installation place:
Supply lines must not take course on/behind the borehole locations;
Multishell strucutres: Always consider that the damaged vapour barrier is tightly sealed after the prescriptions of
the manufacturer.
Weathering stressed areas: on the outside of the ventilation unit a weather protection has to be installed (Also
consider the Notes to the corresponding installation types).
The ventilation device has to be positioned on the inside in a way that a revision of the device is possible at any
time. The air outlet must remain free in an area of ca. 25- 30cm. It must not be blocked or impeded by furniture,
etc..
General Prerequisites
Assembly / Installation Instruction
If the device does not operate correctly please consult an authorized specialist.
Besides the exchange of the filter or the cleaning of the device no further maintenance operations are
necessary. Always disconnect the power from the grid or switch off the fuse of the device.
Z- WRG RONDO Plus is constructed for the ventilation of dry interior rooms. The air outflow must not be covered by
any kind of object. A warranty for other usage cannot by guaranteed. In order to avoid damages by moisture
or health damages, always be aware of appropriate room ventilation. Depending on the usage of the room it
might be necessary to support the ventilation effect with additional window openings (e.g. brief and intensive
airing out for five to ten minutes) or the installation of an alliance of several Z-WRG Plus devices.
For the correct operation of the decentralized room ventilation system WRG Plus it is a prerequisite that the
combustion air lines have a closure capability.
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 03

› Z-WRG PLUS › MOUNTING INSTRUCTION
Preparation wall opening and electrical connection
WRG RONDO Plus
Kernbohrung 200 mm
65 mm
WRG RONDO Plus
Page 4
Cable bushing
core drilling 200 mm
Cable bushing
Dimensions Consistent with
Z-WRG RONDO Plus Components
Original
Ventilation devices of the Z- WRG
Plus series are operated via a
central control unit. The necessary
12 V low potential voltage is also
provided this way.
For the electrical power supply
of the central control unit a 230 V
electrical connection is necessary,
fused with 6 A.
The single ventilation units are
connected with the central control
unit via star- shaped low voltage
lines 2x2x0.6. The length of the
longest line should not exceed
50 meters.
Preparation of Assembly: Star- Shaped Connection 12 V
230 Volt
electric supply
Z-WRG Plus
230 Volt Electrical Supply, Fused with 6 A
Central Control Unit
12 Volt
low voltage

Assembly Type LAW
› Z-WRG PLUS › MOUNTING INSTRUCTION 05
1. Creation of the wall opening
Insert Structural work Ring Module Set
Outside
Inside
3. Ring Module Set slide into the wall,
adjusting it and fixing it without tension
b) by adjusting the ring module sets the
Wall thickness, are still present connection
wall thickness the connection joints have to be
sealed diffusion resistantwith VX-FK
5. Framed fixing in the wall with two component
polyurethane foam VX-2K
6. Protecting the Ventilation Unit from Dirt
7. Install Façade Cover after the completion of
plaster and painting works
4. For larger openings, cavities
additionally with rock wool, mineral wool
stuffed or isolate expert guidance to customers
a) seal room-sided opening gap between wall and
channel diffusion resistant and permanently
elastic (Ventomaxx Installation Sealing Adhesive
VX-FK)
2. Making overall length with ring modules
(wall thickness incl. insulation system and
Plastering)
Mounting instructions - V-WRG Rondo Plus - Mounting Type LAW
Cross Section
Illustration of Solid Wall + Insulation System
Wall Thickness
Preparing the total length
a) Opening 200 mm or angular H / B 200 x 190
Making mm and hold in shell construction
b) Empty tube and electrical connection
NYM-J 3x1.5 provide!
b) in order to avoid any kind of damage to the
ventilator during the construction phase, store
them in a well- protected place until the final
assembly.
d) after completion of electrical work to
Clipping electric protective cover and the
Hang the appliance control panel
a) before you start working always pull the plug or
switch off the flush!
9. Electronic Installation must be carried out
by a professional!
a) depending on the desired place for the interior
cover (air outlet on top or bottom), the electric
cable has to be installed like the pattern shows
you (the standard air outlet is on top)
Installation cable
NYM-J 3x1,5 provide
The ring module set is for use in
Wall thicknesses from 300 mm designed;
CAUTION: reduction only on the outside!
8. Install interior housing right before the
completion of the construction phase
a) the room-side housing can be applied to
provided fixing points of RS-LAW
or attached to the wall are.
b) to avoid deformations on the housing tighten
screws gently and uniformly
b) Electrical connection Perform according
to the attached wiring diagram.
f) further details should be in a timely manner
Start of installation, to clarify project basis;
We are pleased to help you on this request
e) the device is now according to operating manual
ready for use.
Install Façade
Covering and
Interior Housing
c) at LAW-assembly is a slope of Ring module sets
plan at 1,5-3°decline of your telescope unit
from inside to outside
c) Commissioning of the units according to
instructions Perform (Master / Slave / groups etc.)
a) therefore use the included protective cover
during the whole construction phase
(plaster cover of RS-LAW)
The illustration shows
the V-WRG RondoPlus in
Mounting Version LAW,
straight through the wall
In the lower part is an on-site seal between structual work construction ring Module Set
and base plate facade cover required (eg aluminum adhesive tape; Ventomaxx sealing adhesive VX-FK);
at the top of the hood and sides of a seal on the facade is necessary.
Achieve 1,5 to 3° Decline
via EPS Assembly Wedge
sound insulated
Order-No.: 9500-0030SP
Sealing Adhesive
facade cover
FA-LAW-K
Ring-modul-Set
RS-LAW
device unit
V-WRG RONDO Plus
Plaster Cover
RS-LAW
Plaster Cover
Please note Mounting instructions for facade cover!
InsideInside
Outside Outside Outside

› Z-WRG PLUS › MOUNTING INSTRUCTION 06
Inside
view from the side
section vertical
facade border
and inner housing
assemble
section vertical
Representation Solid wall + insulation system
wall thickness
Fan nominal length
adjust
Insert fan unit
5. Framed fixing in the wall with two
component polyurethane foam
7. Protecting the Ventilation Unit from Dirt
8. Install Façade Cover after the completion of
plaster and painting works
a) seal room-sided opening gap between wall and
channel diffusion resistant and permanently
elastic (Ventomaxx Installation Sealing Adhesive
VX-FK)
9. nstall interior housing right before the
completion of the construction phase
b) to avoid deformations on the housing tighten
screws gently and uniformly
10. electrical connection
a) Before starting work, switch off the fuse /
Disconnect the plug! Further steps like
Mounting Type LAW.
Inside
Installation cable
NYM-J 3x1,5 provide
c) at LAL mounting the ring module sets a
Drop of about 1.5-3 ° from the inside to the
outside provide; the flat channel is 5 ° (degrees)
b) so that the system support unit with fan
during construction is not damaged,
should this through to final assembly on a
sheltered place are stored..
d) Flat channel external flush reveals level
adjust; Shorten if necessary; by suitable
Fix flat duct holder on the outer wall
a) the adjustable Soffit connection embeddable
for later plaster level of Soffit corner
adjusted / taping all around
6. Flat duct system within the covering
insulation level
b) Interface between flat duct, insulation
flat and plaster connection with illmod tape
seal
4. Insulate bigger opening or hollow spaces
additionally with mineral wool professionally
section vertical
The illustration shows
the V-WRG RondoPlus in
Mounting Version LAL,
for concealed integration
within of the reveal
a) the room-side housing can be installed on to
the provided fixing points of RS-LAL
or be secured to the wall
Plaster Cover
Plaster Cover
RS-LAL
Flat duct holder
FKH
Ring modul-Set
RS-LAL
device unit
V-WRG RONDO Plus
façade connection
with integrated condensate drain
facade border
FA-LAx 37
a) For this purpose is the supplied, room-side
protection coverage throughout the building
phase use; In addition, we recommend the use
of VX-LAL-plaster cover for the flat duct
connection with duct tape
seal all round
In plaster facades we recommend a flat duct on insulation of approximately 30 mm.
1. Creation of the wall opening
3. Ring Module Set slide into the wall,
adjusting it and fixing it without tension
2. Making overall length with ring modules
(wall thickness incl. insulation system and
Plastering)
a) Opening 200 mm or angular H / B 200 x 190
Making mm and hold in shell construction
b) Empty tube and electrical connection
NYM-J 3x1.5 provide!
a) depending on the desired place for the interior
cover (air outlet on top or bottom), the electric
cable has to be installed like the pattern shows
you (the standard air outlet is on top)
The ring module set is for use in
Wall thicknesses from 300 mm designed;
CAUTION: reduction only on the outside!
b) by adjusting the ring module sets the
Wall thickness, are still present connection
wall thickness the connection joints have to be
sealed diffusion resistantwith VX-FK
Mounting instructions - V-WRG RondoPlus - Mounting Type LAW
OutsideOutsideOutside
Achieve 1,5 to 3° Decline
via EPS Assembly Wedge
sound insulated
Order-No.: 9500-0030SP
Inside
Sealing Adhesive

› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 07
1. Mains connection Switch off power
a) Cut connecting cable with landline connection
and stripping; it is only the phase and the
Neutral required
b) with the power cord device put not in
the Plug socket
2. assemble room-sided casing
3. Electrical Connection
a) The connection of the fan is controlled via
the two terminals X 1.1 N and X1.2 L1
Wall telescope unit and
Mains connection are prepared
Mains connection
Connecting
connecting cable
NYM-J 3.15
Screws
3.9 x 13-16
3.a
Unlocking of
casing cover
a) Power cable through the rear side
Housing opening in the electric terminal
area putting
Unlocking of
press here
Set the screwdriver here
Preparation of the room sided housing
a) Press Unlocking on the housing and
Lift front design cover
b) Screwdriver put in the slot and
electric cover Unclip with light pressure
b) the housing provided directly to the
Attachment points on the room side
Structural work ring module or on the wall
screw on
X 1.1 N
X 1.1 L1 b) Alternatively, the device is already with a
plug-in connector provided ex factory
The unit has an international
Wide range input
U: 85 - 260 V
f: 50 / 60 Hz
cable connection:
A: 0,75 - 1,6 mm2
ATTENTION - MAINS VOLTAGE!
Installation has to be done by expert staff.
ATTENTION
MAINS VOLTAGE!
Installation has by suitably
qualified personnel realize.
The power supply of the devices via a
Ring main with its own fuse or
the use of a phase coupler can at
His use of numerous stations beneficial be.
When noise, a mains filter must be connected
upstream.
1
Design casing on the
Wall / on RS screw it
2
2.b
2.a
2.b
3
3.a

End Assembly on the Room Side
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 08
1. Mains connection Switch off power
a) Cut connecting cable with landline connection
and stripping; it is only the phase and the
Neutral required
b) with the power cord device put not in
the Plug socket
2. assemble room-sided casing
3. Electrical Connection
a) The connection of the fan is controlled via
the two terminals X 1.1 N and X1.2 L1
Wall telescope unit and
Mains connection are prepared
Mains connection
Connecting
connecting cable
NYM-J 3.15
Screws
3.9 x 13-16
3.a
Unlocking of
casing cover
a) Power cable through the rear side
Housing opening in the electric terminal
area putting
Unlocking of
press here
Set the screwdriver here
Preparation of the room sided housing
a) Press Unlocking on the housing and
Lift front design cover
b) Screwdriver put in the slot and
electric cover Unclip with light pressure
b) the housing provided directly to the
Attachment points on the room side
Structural work ring module or on the wall
screw on
X 1.1 N
X 1.1 L1 b) Alternatively, the device is already with a
plug-in connector provided ex factory
The unit has an international
Wide range input
U: 85 - 260 V
f: 50 / 60 Hz
cable connection:
A: 0,75 - 1,6 mm2
ATTENTION - MAINS VOLTAGE!
Installation has to be done by expert staff.
ATTENTION
MAINS VOLTAGE!
Installation has by suitably
qualified personnel realize.
The power supply of the devices via a
Ring main with its own fuse or
the use of a phase coupler can at
His use of numerous stations beneficial be.
When noise, a mains filter must be connected
upstream.
1
Design casing on the
Wall / on RS screw it
2
2.b
2.a
2.b
3
3.a
Mounting instructions - V-WRG RondoPlus - Mounting Type LAW

End Assembly on the Room Side
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 09
communication settings
on the DIP switch
define Master / Slave
via DIP-Switch 1 no.
ON = Master / OFF = Slave
define group
via DIP switch no. 5-9
4. Push the system unit into the wall
a) the coming of the circuit board plug
(bottom left of the room-side plus housing)
put down to make room for the insertion
to provide
5. Fan connection
6. Presetting units for group function
b) from the circuit board coming
low-voltage Round cable in the right
cable notch on the housing Push
b) First of the ceramic heat exchanger in
the tube insert (until just before the tube end)
a) The low-voltage fan (12V DC)
is via a quick plug connection
connected to the circuit board (Fig. 5.a)
DIP-Switch
The devices are still disconnected from Voltage!
The data exchange between installed
V-WRG devices takes via the mains.
Other physical connections or
Control lines are not required.
Master / Slave
As a control for setting the DIP switch
Master on the Master LED on the display lights
green. All other stations of this group
work as "slave" (DIP switch No.1 OFF).
Within each group observes a master
one or more slave stations (max. 13).
Setting group
Via the DIP switch no. 5-9, the
Group settings are defined.
All stations of the same group have
each have the same switch setting.
Attention:
All ventilation units in a group must
be connected to the same phase!
About the setting function of the DIP switch "1"
is a station per group on "Master"
set (DIP switch # 1 ON).
c) then the fan unit until it stops
Slide to the heat exchanger.
The fan grille shows on room side.
Example:
DIP-Switch 1 on ON
set
1 Station = Master
3 Stationen = Slave
Group 1
1 Station = Master
1 Station = Slave
Group 2
Operating from 6 devices into two groups
DIP-Switch 1 on ON
set
All stations have a uniform group setting of DIP switches 5-9.
DIP-Schalter 1 on OFF
set
DIP-Switch 1 on OFF
set
The master and the slave station of the DIP switch no. 5 is set to ON.
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
Note: The DIP switches 2,3 and 4 must be set to OFF; other settings are intended only for customer service!
Group 1 consists of four devices; Group 2 consists of two devices
c) The devices are now in the factory
preset single-mode operation ready for use
After setting the DIP switch
the RESET is a first on the master and to the
Slave stations required (see. Page 10).
Thus, each station being given at the first switch
-on operation assigned to a station number.
66.a
5
Low-voltage connection between
Fan and circuit board
5.a
4.c
In the heat exchanger
slide into the wall
4.b
Fan unit slide into the wall
Mounting instructions - V-WRG RondoPlus - Mounting Type LAW

Filter in both latching hooks
left / right snap into place
Insert filter
Hang unit cover
and push locked
8
10
8 - 11 Insert filter
10. Put room side casing cover
a) the filter frame at the top of the two Filter
fixations slide (Fig. 8a)
b) The filter frame by depressing
clipping the locking hooks in succession below
8.a
a) Hook on of the casing cover in the area of
the roller and on the opposite side on the
housing snap into place
The filter change in reverse
Sequence on the unlocking of the
two tabs and removal of the
Filter frame at the middle tabs.
The ventilation units can now, like
described on the following page, in
Operation are taken
units with landline connection over the fuse
provide with power
Units with power plug can now in the
Socket are plugged
10.a
Close cover electric
Hook electric cover on the housing bottom
and the separating web press until he
perceptible locks
7. Closed electric cover
7 7.a
9
Mounting instructions - V-WRG RondoPlus - Mounting Type LAW
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 10

Electronic Installation of the Central Control Unit
9. Installation of the central control unit in
gypsum plasterboards or flush mounted
11. Screwing the base plate
12. Clipping the frame trim
a) during the inserting of the base plate with the
circuit board, ensure that no damages arise.
b) before the screws are tightened the base plate
can still be moved within the slotted holes.
Afterwards tighten screws moderately.
Assembly Instruction- Z-WRG Plus - End Assembly Room Side
a) create a wall opening in the drywall or masonry
(ca. 75mm deep)
a) Hang up the frame trim of the central control
unit into the hooks on the base plate and let it
snap into place using soft pressure
The ventilation devices can now be put into
operation. The upcoming page gives an
instruction how to do it
Devices with a mains connection can now
be supplied with power via switching on
the flush
Devices with power plug can now be
plugged into the outlet.
.
ATTENTION
MAINS VOLTAGE!
Installation has to be
carried out by expert staff
b) you can choose whether to montage the central
control unit horizontally or vertically
230 Volt
Supply
Low Voltage
Supply
If you fix it vertically we recommend you to
supply the 230 V cable from above
If you choose the horizontal montage it may be
advantageous to supply it from the left side.
10
9
S1 S3 S5
S6 S4 S2
230 V
+
-+
-+
-
+
-
+-+-+-
10. Electrical Connections
a) first approve that your connections or
connections spots are switched to zero potential!
b) apply 230 V alternating current (AC) to the
feeder clamp AC
AC
c) apply station 1 to 6 to the low voltage feeder
clamps, hereby always observe the right polarity
in reference to the connector cable K in the
station:
leads to connector cable „brown“
leads to connector cable „green“
leads to connector cable „weiß“
11
12
11.1 11.2
b) Use a screw driver to remove the frame trim
(Fig. 12.1).
12.1
68 mm
71 mm
Observe the right order of connection: S1; S2; S3; S4; S5; S6
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 11

Operational Guidelines- Z-WRG RONDO Plus
Caution
Do not remove the cover of the electrical part yourself in order to avoid a the risk of an electric shock. There
are no parts behind the cover of the electrical part and the base plate that need to be maintained by the
customer. Please let expert staff carry out electrical interventions.
The housing towards the room side respectively the room- sided cover is easiest to clean with a humid cloth.
In order to avoid damages of the surface only use water and a little detergent. Always make sure that no
water can ingress.
Cleaning and Care
With the purchase of the Z- WRG RONDO Plus you decided to buy a particularly high- quality product that is
designedfor permanent operation. In case you have to make use of the warranty service,
bought the device from.
Previously read the operating guidelines carefully. That way you can exclude that the mistake did not arise
please contact the firm you from incorrect setting or handling.
General Operating Instructions / Warranty
All Ventomaxx products are subject to the implied warranty of two years. It contains material and production
defects. The warranty starts with the date on which the product was purchased respectively installed. You
have to submit the evidence for the purchase or the installation. For this we ask you for a voucher a receipt
where the dates can be found in. Ventomaxx reserves the right to reject the warranty if the evidence for the
purchase and/or installation is not provided.
In case of a justified defect covered by the warranty, that is due to a material defect or faulty production,
Ventomaxx will either repair the product or replace defective components respectively the whole product.
The warranty is excluded for the following cases if:
- the assembly and operating guidelines have been ignored
- the assembly/ installation was carried out wrong
- the device was improper handled/ willfully or deliberately damaged or destroyed
- intervention(s) on the device were not carried out by expert staff
- components are affected that are exposed to normal, foreseeable stress
- No original spare parts are used
In order to guarantee a consistent quality of fresh air, please check the condition of the filter and the
components that conduct air flow regularly. Please exchange the filter at least once a year.
Filter Exchange
All WRG RONDO Plus devices are frost- resistant up to -20°C because of the cyclic air intake and exhaust. In
contrast to conventional cross- flow or counterflow heat exchangers that have to start with defrosting
operations already at 0°C, Z WRG RONDO Plus devices always ensure a maximal heat recovery efficiency in the
program mode “ Permanent Operation“.
„Winter Operation Mode“ / Increased Frost Protection
During “winter operation mode” with high moisture and/or low temperatures outside the system carrier unit
can be turned around by 180° in order to make the ventilator show to the room side. Of course, this position
can be kept in summer, but the advantage of the “standard summer operation constitutes in a lower noise
level. Thus it is up to the user to run the device in “winter operation” or “summer operation”.
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 12

The illustration on the left side shows the
design of the device in montage type LAW-
straight through the wall.
The operation of other montage types of
this series is identical.
Operational Guidelines- Z-WRG Plus
All Z- WRG ventilation devices are controlled via
the central control unit. At the same time the
operating states are displayed at the LEDs of the
central control unit ZS- Plus.
System Carrier Unit
with Ventilator
Façade Covering of
Montage Type LAW-
straight through the wall
Adjustable Air Flow
Guidance Roller
Filter Insert
High Performance Ceramic
Heat Exchanger
Rough Construction unit
Type LAW
Three buttons are available for the operation by
the user:
- ON / OFF function
- Program selector
- Selection of the ventilation stage
The LEDs show the current program state as well
as the preselected power stage and the operation
state. Other functions can be set using the
configuration mode.
ON / OFF
Switching ON/OFF of all devices.
Ventilation Stages
The user can choose between five different power
stages. The stages are selected by frequently
pressing the “speed button” as often as the user
needs to select the right stage. The selected stage
can be reviewed watching the associated LED.
Startup / Initial Commissioning
All connected devices are ready to use in respect
to the predefined factory setting right after
switching them on.
Program Selection
The program selection is described on the
following page.
Program Selector
ON / OFF
Master / Configuration
Mode
Ventilation Stages
Central Control Unit ZS-Plus
Operation via central control unit ZS-Plus
For the user´s information the active devices are
displayed during switching on.
Firmware to ZS-Plus:
You ordered your central control unit with one of
the following program functions that have an
influence on the described functions of the device.
Please check before via your receipt which kind is
installed at your place!
ZS-Plus Vers. 1.25 (Standard)
ZS-Plus Vers. 1.25 (permanent ON)
Conform to following description.
Conform to following description without the
function of the ON/OFF button.
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 13

4 different programs are available:
1. Dynamic monitoring of humidity
The integrated humidity sensor will be the
Indoor humidity permanently monitored (here by
is the power stage 1 connected upstream).
If the value for the relative humidity of the humidity
sensor of the ZS-Plus exceeded
( ). > ~ 55 und 80 % r.F.
(The system switches all active fan units
dynamically and at demand within the ventilation
stages 2 to 5. The max. allowable power level can
by the user through the preselection of a smaller
Ventilation level limited.
Both LEDs are off.
Operational Guidelines - Z-WRG RONDO Plus
2. Permanent Ventilation
The ventilation devices are operated cyclic on the
preselected ventilation stage. Even active
devices are driven in differential mode. This way
the interior air pressure stays neutral.
The left LED shines.
Ventilation Stage 2 Device ON Operation ModeProg. 1
3.Pulse ventilation
The standard program runs for 15 min, afterwards
the devices of one group take a 105min break.
After 2 hours the cycle restarts again.
The right LED shines.
4. Cross/ Transverse Ventilation
In this program mode all devices of one group
run permanently without changing between
exhausting and supplying air. One half of the
group supplies air, the other one exhausts air.
Both LED shine.
1
5
4
3
A cycle is defined as a 70 seconds lasting
recurring predefined change of air supply and
air exhaust in one device.
„Speed Display“
Additional functions concerning the
operation of your Z- WRG RONDO Plus unit
can be preset in the configuration mode.
Prog. 2
Prog. 3
Prog. 4
Possible configurations can be gathered from
the following descriptions.
Press > 7 sek = Change Into Configuration Mode
Display of the Configuration Mode
Station 1-6
1 2 3456
By pressing the ON/ OFF button for a short
time you switch on the device.
During switching on the active stations are shown
briefly (2 sec.) via the corresponding LED.
- LED off | device not connected/existing
- LED on | device connected and active
-LED weak | station connected but inactive
ATTENTION
During the winter months always has to work in
permanent operation!
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 14

To get to the configuration mode, please
press the ON button for about 7 sec.;
as soon as you release the button you are in the
configuration mode. This can also be observed
by the shining Master- LED.
Rolling breaks are active during operation with an
odd number of active devices. In order to avoid
overpressure or negative pressure another ventilation
device stops after each cycle.
Speed LED No. 5 is off.
5
4
3
Operational Guidelines- Z-WRG RONDO Plus - Initial Commissioning
By pressing the ON/ OFF button for a short
term you can switch the selected device on/ off.
In configuration mode the 6 LEDs on the bottom serve as illustration
of the six ventilation devices.
Configuration Mode
Press ON/ OFF Button > 7 sec. = Change into configuration mode
Shining Master LED gives illustrates
active configuration mode
By pressing the Progr. Button for a short time
in the configuration mode you can switch to
the next ventilation device.
The associated device LED is flashing; only LEDs
of connected ventilation devices are shining.
An active device is available for ventilation; a
passive device does not take part in the
ventilation.
Selection of the configuration mode like
described before.
By pressing the “Speed Button” for about
1sec. the mode of rolling breaks can be
activated or deactivated.
During switching on, the devices and their state is shown briefly.
Station 1-6
23456
The ventilation devices are shown via LED:
- LED off | device not connected/existing
- LED on | device connected and active
- LED weak | station connected but inactive
1
The setting is displayed via the Speed LED Nr. 5
- Speed LED Nr. 5 is off during standard mode
(rolling breaks are active if odd number of
ventilation devices present)
- Speed LED Nr. 5 is shining (Rolling breaks are
inactive if odd number of ventilation devices
present)
You get back to the operation mode
automatically about 10 sec. after you pressed
the last button. The settings that were made
before are saved automatically this way.
You get back to the operation mode automatically
about 10 sec. after you pressed the last button.
The settings that were made before are saved
automatically this way.
Setting devices active / inactive
Activate/ Deactivate rolling breaks if your
operating the system with an odd number
of ventilation devices.
You get back to the operation mode
automatically about 10 sec. after you pressed
the last button. The settings that were made
before are saved automatically this way.
By pressing the speed button for about 1 sec. the mode can
be deactivated. Then odd numbered devices operate without
rolling breaks.
A deactivation is evidenced by the shining LED Nr. 5.
Prerequisite for the deactivation of a device is the connection
of all ventilation devices in uninterrupted order to the ZS-Plus
control unit. Please note all safety precautions concerning the
operation of the system made in the building supervision´s approval.
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 15

Operational Guidelines - Z-WRG RONDO Plus
With a change of the installation place or the application of
optional accessory parts it might come to deviations in the
effective air performance.
Filter Exchange Display:
Here, a filter exchange is
necessary for device 2, 3 and 4
After 4000 operating hours a filter exchange is
shown by a flashing MASTER-LED.
The MASTER_LED is flashing every 5 seconds
and displays for a time period of 1.5 seconds the
numbers of the ventilation devices (via LED)
where the filter has to be exchanged.
Now exchange the filter of the affected devices.
Afterwards reset the filter exchange display
as follows.
Press the ON/OFF button for about 20 sec. until
MASTER- LED is flashing; afterwards release
the ON/OFF button.
After 10 sec. the Master-LED is shining;
please hold on pressing the Button, until the
Master-LED ist flashing.
The reset of the filter exchange display was
carried out successfully for the concerned
devices.
Attention:
Settings via the configuration mode can only be made after a
filter exchange and the corresponding resetting of the filter
exchange display!
Device No.::1 2 3 4 5 6
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 16

Operational Guidelines - Z-WRG RONDO Plus
Press the release of the
housing cover;
remove the front cover
Insert the filter into the adaptor;
clips it behind the two straps
3
Unlock the filter on both straps
and remove it.
2
Hang in the housing cover and
snap it in
4
During the filter exchange the system carrier unit should be removed and
inspected for soiling. It is recommended to clean the heat exchanger from
time to time with running water or to put it into the dishwasher
1
Only a clean ventilation device is able
to guarantee a hygienic fresh air
supply. Because the operating
environment and the device runtimes
can differ occasionally, we recommend
inspecting the filter and the system
carrier unit for proper condition once
more than described in the following
during the first months of operation. If
necessary the ceramic heat exchanger
can be cleaned in the dishwasher.
Filters are hygiene products and need
to be changed if their soiled or dirty. In
order to admonish you to exchange
the filter, your Z-WRG RONDO Plus
device is equipped with a filter
exchange display (s. p. 14).
On the ventilation device there are no
maintenance works to do.
The filter exchange is carried out as
follows:
a) remove the front cover of the
device; for this press the unlocking in
the middle and unhook the cover via
light upward movement (fig. 1).
b) the filter frame is held by two snaps
in the housing of the device ; by
pressing the straps it is possible to
remove the filter frame without
needing a tool (fig. 2).
c) Insert the new filter in reverse order
into the housing; hang in the front
cover again and make it snap in using
soft pressure.
Please keep in mind that depending of
the place of the ventilation device it
might be necessary to exchange the
filter every 6 to 8 months. An
inspection of the filter on dirt or soil
thus should be carried out regularly.
Independent from the degree of dirt
the filters need to be exchanged for
hygienic reasons at least once a year.
Ventomaxx replacement filter can be ordered from
Ventomaxx indicating the article number:
Replacement Filter
Article Number: 1500-1913VX
Replacement Filter F6 for allergy sufferers
Article Number: 1500-1915VX
ent
Vmax
x
Tippelweg 3
84028 Landshut
V-WRG PLUS
Z-WRG PLUS
Z-51.3-247
PL.10.WLG.76A
vom DIBt zugelassenes Bauprodukt
IGE
Institut für
GebäudeEnergetik
geprüft www.ventomaxx-international.com
Using the Z-WRG RONDO Plus series
you realize requirement specific
solutionsflexibly and highly energy- efficient.
Please contact us with your needs!
Z- WRG RONDO Plus Decentralized Ventilation Technology
with a central control unit
› Z-WRG RONDO PLUS › MOUNTING INSTRUCTION 17

ent
Vmaxx
Tippelweg 3
84028 Landshut
V-WRG PLUS
Z-WRG PLUS
Z-51.3-247
PL.10.WLG.76A
vom DIBt zugelassenes Bauprodukt
IGE
Institut für
GebäudeEnergetik
geprüft
Using the Z-WRG Plus series you
realize requirement specific solutions
flexibly and highly energy- efficient.
Please contact us with your needs!
Z- WRG RONDO Plus Decentralized Ventilation Technology
with a central control unit
Z-WRG RONDO Plus
Technische Änderungen vorbehalten © Ventomaxx GmbH
www.ventomaxx-International.com
Ventomaxx -International GmbH
Herzog Georg Platz 4
84028 Landshut
Germany
Table of contents
Other VENTOMAXX Fan manuals
Popular Fan manuals by other brands

Aereco
Aereco ZLT AWN DV Basic 101 Installation and maintenance instruction

Prem-I-Air
Prem-I-Air EH1798 user manual

Middle Atlantic Products
Middle Atlantic Products UQFP RESIDENTIAL Series instruction sheet

EWT
EWT AERO360 user manual

Emerson
Emerson CF144BS owner's manual

Hunter
Hunter 51476 installation manual