
4
1. Information Disposal of packaging ............................................................................ 5
Symbols ................................................................................................. 5
Intended use .......................................................................................... 5
Product information ................................................................................ 6
■System examples ............................................................................... 6
■Conversion for other countries ........................................................... 6
2. Preparing for installation ................................................................................................................ 7
3. Installation sequence Siting and levelling the boiler ................................................................. 9
Fitting the thermal insulation .................................................................. 10
Mounting the burner ............................................................................... 11
■Burners up to 80 kW ........................................................................... 11
■Burners from 120 to 318 kW ............................................................... 12
Fitting the gas supply pipe (accessories) ............................................... 13
■Routing options for the gas supply pipe ............................................. 13
Fitting the set for room sealed operation .............................................. 16
■Position of the ventilation air pipe ....................................................... 16
Fitting the boiler flue connection ............................................................ 18
Fitting the trap ........................................................................................ 19
Fitting the side panels ............................................................................ 20
Assembling the control unit .................................................................... 21
Installing the control unit ........................................................................ 21
■Connecting the programming unit to the control unit .......................... 22
Connecting the internal connecting cables to the control unit ............... 22
■Applying strain relief ........................................................................... 22
Fitting the control unit to the boiler ......................................................... 25
■Connecting the flue gas temperature sensor ...................................... 26
■Fitting the back panels ........................................................................ 26
■Boiler water temperature sensor and water pressure switch .............. 27
Connecting external cables ................................................................... 28
■Circulation pump at plug sÖ ................................................................ 29
■Circulation pump at plug sA ................................................................ 30
■Pumps with power consumption greater than 2 A or connection for
HE pump ............................................................................................. 31
■External demand via 0 – 10 V input .................................................... 32
■External blocking via switching contact .............................................. 32
■Connection of accessories ................................................................. 33
Burner electrical connection .................................................................. 34
■Burners up to 80 kW ........................................................................... 34
■Burners 120/160 kW ........................................................................... 35
■Burners 200/240/280/318 kW ............................................................. 36
Electrical connection of the motorised flue gas damper in multi boiler
systems .................................................................................................. 36
Inserting the coding card ....................................................................... 37
Fitting the top panels ............................................................................. 37
Connections on the heating water side .................................................. 38
Connecting the condensate drain .......................................................... 39
■Condensate drain ............................................................................... 39
■Connecting the neutralising system (accessories) ............................. 39
Flue gas connection ............................................................................... 39
■Connections on the flue gas side ....................................................... 39
Fitting the front panel ............................................................................. 40
Commissioning and adjustment ............................................................. 40
4. Appendix Connection and wiring diagram ............................................................. 41
Specification .......................................................................................... 42
Index
5839818