Vitotronic 200, HO1B and 300-K, MW2C Installation/Service
5700 299 - 06
6
If you smell gas
HDon’t smoke! Don’t use naked flames or cause sparks
(e.g. by switching lights or electrical appliances on
and off)
HOpen windows and doors
HClose the gas shut-off valve
HInform your heating engineers/service contractors from
outside the building
HObserve the safety regulations of your gas supply
company (see gas meter) and those of your heating
engineers (see start-up or instruction report).
In emergencies
HImmediately switch off the power supply, e.g. at the
separate fuse or power supply disconnect switch
(unless there is a smell of gas).
HClose the shut-off valves in the oil pipes or close the
gas shut-off valve, whichever applicable.
HUse suitable extinguishers in the event of fire.
Installation of additional components
The installation of additional components which have not
been tested together with the boiler can adversely affect
the function and performance of the boiler.
Our warranty does not cover and we accept no liability
for damage attributable to the installation of such
components.
Boiler room conditions
HDo not use a room in which the air is polluted by
halogenated hydro-carbons (e.g. as contained in
aerosols, paints, solvents and cleaning agents)
HDo not use a room subject to high levels of dust
HDo not use a room subject to permanently high humidity
HThe room should be frost-protected
HMax. ambient temperature 95°F (35°C).
HProvide good ventilation and do not close or obstruct
vents (if installed).
This symbol indicates a reference to other instructions
which must be observed.
Safety
CAUTION
Follow these safety instructions closely to avoid the risk
of injury and damage to property.
For your Safety
HOperation
Before operating the boiler, make sure you fully
understand its method of operation. Your heating
contractor should always perform the initial start-up
and explain the system. Any warranty is null and void
if these instructions are not followed.
HFlue gas smell
- Deactivate heating equipment.
- Open windows and doors.
- Inform your heating contractor.
HWorking on the equipment
All personnel working on the equipment or the heating
system must have the proper qualifications and hold
all necessary licenses. Ensure main power to
equipment, heating system, and all external controls
has been deactivated. Close main gas supply valve.
Take precautions in all instances to avoid accidental
activation of power during service work.
HDangerous conditions
- Deactivate main power immediately.
- Close gas supply valve.
HMaintenance and cleaning
Regular inspection and service by a qualified heating
contractor is important to the performance of the boiler.
Neglected maintenance impacts on warranty; regular
inspection ensures clean, environmentally friendly and
efficient operation. We recommend a maintenance
contract with a qualified heating contractor.
HTechnical documentation
- Installation Instruction and Service Instructions
- Operating Instructions and User’s Information Manual
Additional applicable literature:
- Accessory manuals