viveroo level User manual

User Manual
level
viveroo GmbH
Wewelsburger Straße 4
33154 Salzkotten
Germany
www.viveroo.com
REV20211014

Sicherheitshinweise
level, Product- and Mounting guide, Page von2 9
!
! WARNING
Please read the assembly instructions included carefully. Please
read this leveluser manual completely before using your level.
Please follow the instructions and recommendations to ensure
proper use and maximum enjoyment.
Safety
information
leveland all levelmounting sets are intended for use in enclosed and
dry living spaces.
The following conditions must be provided:
- Operating temperature between 0° C (32° F) and 35° C (95° F).
- Relative humidity (during use): 20 % to 90 %, non-condensing.
- No external environmental influences such as oil, chemicals, salt,
extensive dust, etc.
The maximum altitude is 2.000m.
Installation, service or repairs, if necessary, may only be performed
by authorized persons.
The installer is responsible for selecting the proper mounting
location and safe installation of level. This also applies to
installation in movable parts, such as doors. The installer is
responsible for performing and documenting all necessary safety
tests.
All electrical installation work may only be conducted by
authorized, trained electricians, always adhering to the general
rules and regulations applying to electrical installation. Wire end
sleeves and ferrules must be used for flexible cables.
Should it become apparent that safe operation of levelis not
assured, then levelmust immediately be taken out of service and
secured against potential misuse. If the levelfunctions are limited,
blocked or disabled, if an unusual odor is present, if noises such as
scratching are audible or damage is visible, safe operation can no
longer be guaranteed.

Technical Data
level, Product- and Mounting guide, Page von3 9
Delivery
Content
-Installation Guide level.
-level massive body made of aluminum.
-Aluminum Cover (painted).
-Suction cups for removing cover after installation.
-Cap for fixing the power plug.
-Mounting accessories: screws
-Cable
-PoE Adapter (only for „level PD“)
Compatibility
Electrical operation of levelis permitted only in connection with levelMountingSet and power supply and
cable included in the Mounting Set. Operation of levelwithout a MountingSet will lead to immediate loss
of guarantee and warranty.
Measurements
Measurements design cover
364 x 294
Depth level
36
Size of opening (for furniture installation)
Size of opening (for flush-mounted box)
367 x 296,5
344 x 271
Installation depth (for flush-mounted box)
76
Weight in kg
level
2.2
Electrical
connections
Low voltage
Power consumption
12 Vdc
18 Watt
Removal from
power supply
level may be removed from the power supply via the circuit breaker
in the respective rooms.
Circuit Breaker
16A (EU) , 20A (USA/Canada)
Overvoltage
category
OVC II
wire cross-
section
The permitted conductive cross-section is between 0.75mm²and
2.5mm².
CE & Co.
All levels have CE certification. levelis quality "Made in Germany".
We use only high quality parts and components produced by
market leaders. levelcustomers are proud of their iPad Garage.
Technical changes and mistakes are excepted.
iPad is a registered trademark of Apple Inc.

Installation Guide
Delivery Content
Illustrations are exemplary. These may vary depending on the iPad, USB connection and version.
level, Product- and Mounting guide, Page von4 9
1
Installation of level with MountingSet Inwall and Inwall zero
Page 5-7
2
Installation of level with PoE Adapter
Page 7
3
Installation of level with PoE Adapter, mounting without MountingSet Inwall
Page 8
4
Removing the cover after installation
Page 9
level
level with PoE Adapter („level PD“)

Installation
Illustrations are exemplary. These may vary depending on the iPad, USB connection and version.
1. Installation of the viveroo level with the Inwall and Inwall zero
-If you are using the level with a PoE adapter, please start with step 2.1
-If you want to install the level without the Inwall assembly set, please start with step 3.1
level, Product- and Mounting guide, Page von5 9
Step 1.1
Install the flush-mounted box according to the
"installation guide“. Please note all the assembly steps
and safety instructions listed there.
Step 1.2
Connect the cable to the power supply in the flush-
mounted socket.
! Note: When installing the assembly set, you have
already connected the power supply unit with a mains
voltage cable.
Step 1.3
Place the base body over the mounting box so that the
mounting corners (silver) rest on the threads provided.
Then fix the cover over the four mounting corners with
the screws provided.
! Note: Make sure that the cable is fed through the
opening provided in the base body (here on the right)
and that it is accessible even after the base body has
been attached.

Installation
level, Product- and Mounting guide, Page von6 9
Step 1.4
Now insert the iPad into the main body. Make sure that
it is inserted under the narrow "retaining lip" at the
distance from the connector.
! Note: In this state, the iPad is not yet securely fixed in
the holder. Keep holding it to prevent it from falling.
Step 1.5
Connect the USBC plug to the iPad.
! Note: In this state, the iPad is not yet securely fixed in
the holder. Keep holding it to prevent it from falling.
Step 1.6
Mount the connector fuse with the two screws provided.
The iPad is now secured against falling out.

Installation
Installation with PoE Adapter („level PD“)
level, Product- and Mounting guide, Page von7 9
Step 1.7
Push the cover onto the holder.
Step 2.1
Install the flush-mounted box according to the
"installation instructions". Please note all the assembly
steps and safety instructions listed there.
Step 2.2
Place the PoE adapter in the middle of the installation
box. Connect both the LAN cable that connects the
adapter to your PoE switch / injector and the USBC
cable to connect to the iPad with the PoE adapter. Then
continue with steps 1.3 to 1.7.
! Note: It is best to use a Velcro strip to fix the adapter
in the center of the installation box.

Installation
Illustrations and texts are exemplary. Depending on the iPad and USB port, other power supplies or cables can be supplied.
3. Installation of the viveroo level in furniture, installation without the Inwall installation set
level, Product- and Mounting guide, Page von8 9
Step 3.1
Make the cutouts according to the "installation
instructions". Please note all the assembly steps and
safety instructions listed there.
Step 3.2
Connect the cable to your power source
! Note: If you use the level with PoE adapter ("level
PD"), connect this with your LAN cable.
Step 3.3
Place the basic body in the wall cutout. Then fix the
cover over the four mounting corners with the screws
provided. Then proceed according to MontageStepe 1.4
to 1.7.
! Note: Make sure that the cable is fed through the
opening provided in the base body (here on the right)
and that it is accessible even after the base body has
been attached.

Removing the Cover after Installation
4. After installation it may happen that the cover has to be removed in order to have access to the buttons of the iPad or to
remove the iPad. Please note the following steps for this.
level, Product- and Mounting guide, Page von9 9
Step 4.1
Use the suction cups to remove the panel from the wall.
Press the suction cups with handles in an angled
position lightly in the corners against the panel.
Step 4.2
Flip the handles straight to create a vacuum. Then pull
the cover straight off the body.
Step 4.3
To release the suction cups from the panel, the handles
must first be folded back into the angled position. Then
the suction cups can be easily removed.
Other manuals for level
1
This manual suits for next models
1
Table of contents
Other viveroo Rack & Stand manuals