
Summit Stone®
Installation Guide
Round Fire Pit Kit
144th & Giles | Omaha, NE
Phone: (402) 896-0900
watkinsconcreteblock.com
Safety Notice:
Always call Nebraska 811 to have your
utilities marked before digging in your yard.
Always follow city and state codes when
building re pits.
Instructions:
1. Find a desired area in your yard that is suitable for a re pit. Mark
out the shape of your re pit using marking paint or chalk.
2. Remove sod and soil to a depth that will accomodate 1 course of
buried blocks plus base material (recommended).
3. Add aggregate base and compact with a hand tamper. To ensure
proper compaction, compact in lifts of two inches or less. Check the
area with a level before you begin laying the rst course of blocks.
4. Center the metal ring in the prepared area to use as a guide while
installing the blocks.
5. Following the attached diagram, install the rst course of blocks,
ensuring that each block is level front to back, side to side, and level
with the blocks next to it.
6. After the rst course is set and leveled, start building the second
course as shown on the attached diagram.
7. One by one, remove each block from the second course, apply
adhesive, and set back into place with rm downward pressure.
Continue this process until all blocks on the second course are
glued. Check for level before moving on to the next step.
8. Repeat steps 5 & 6 if building a re pit with a third course.
9. If your re pit contains cap units, you will need ensure that the
metal ring is level with or just below the top course of blocks.
10. Using the same method as in steps 5 & 6, install the pre-cut cap
units following the attached diagram.
11. Fill the bottom on the re pit ring with aggregate such as lava rock.
If your re pit is on an existing patio surface, ensure that the re will
not damage the surface below.
12. Once construction is complete and the glue has dried, you are ready
to enjoy your rst re.
If building on an existing patio surface, please continue to step 4.