
• Now you can install
the Y5 Switchboard Module
behind the switchboard panel
• After few minutes red icon will be
disappear and module will be
ready to use
Wiring Basics
• Y5-04 module supports dimmable device on 1st switch only
• Load 1,2 & 3 MUST have the same power source, i.e. they should all
be either on municipal power, or UPS or generator
• Load 4 can be on a different power source (High amp line)
e.g. in a washroom switchboard geyser could have a different
power source (16A) compared to the lights.
TV, CFL, Tube Light, Table Fan etc.
2 TON AC, Geyser, Window AC, 3-
Phase Plug with Low Load(2500W)
Note: If you are not confident of handling electric wires, you can call Y5Home
affiliate or your local electrician
Rating of each load is specified in above table. Y5Home is not responsible
for damages done by devices with higher rating installed on load