Yardline SANTA CLARA User manual

16950
STOP!
STOP!
Call Us First!
DO NOT RETURN TO STORE.
For immediate help with assembly or product information
call our toll free number:
1-800-844-9273
or email:
customerservice@yardline.net
Our staff is ready to provide assistance
April through October M-F 8:00 AM to 4:30 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST

(This page intentionally left blank.)

- CUSTOMER SERVICE -
Call: 1-800-844-9273 email: customerservice@yardline.net
BEFORE YOU BEGIN
IMPORTANT!
READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
•BUILDINGRESTRICTIONSANDAPPROVALS
Be sure to check with local building department and homeowners association for specic restrictions and/ or requirements before building.
.•ENGINEEREDDRAWINGS
Contact our Customer Service Team if engineered drawings are needed to pull local permits.
•SURFACEPREPARATION
To ensure proper assembly you must build your shed on a level surface.
Recommended methods and materials to level your shed are listed on page 8.
•CHECKALLPARTS
Inventory all parts listed on pages 4 - 7. Contact our Customer Service Team if any parts are missing or damaged.
•ADDITIONALMATERIALS
You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.
KEEPTHISMANUALFORFUTUREREFERENCE
ACTUAL FLOOR SIZE IS 144" x 90" (365,8 x 228,6 cm)
SANTA CLARA 12' x 7'-6" (365,8 x 228,6 cm)
ASSEMBLY MANUAL 05/15/201916950

2
TOOLS
Safety! Always use approved safety glasses during assembly.
OptionalRequired
HELPFUL REMINDER SYMBOLS
Look for these symbols for helpful reminders throughout this manual.
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
= Assistance Required; two or more people.
= Ensure squareness.
= Important required step or operation.
= Helpful assembly hint.
= Mark part with pencil.
= Beginning of steps for assembly or installation.
= You have nished the assembly or installation.
= Level
❑Gloves
Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no way
negatively affect the strength or integrity of our product. (See Fig. A, B, C.)
A
❑Safety Glasses
❑Tape Measure
❑Paint Tools
❑Ladder
❑Caulk Gun
❑Hammer
❑Level
FINISH
BEGIN
❑Pencil
❑Phillips
Screwdriver
❑ Drill / Driver
❑ 1/4" Drill Bit
❑ 3/8" Drill Bit
❑ 1/2" Drill Bit
❑#2 Philips Drive Bit
❑ Tool Belt/
Nail Pouch
❑Chalk Line
❑Nail Gun
• gun nails
❑Tin Snips
(for drip edge)
❑Pliers
❑ Square or
❑Utility Knife
❑Shingle Blades
B C

3
COMPLETING YOUR SHED
You will need these additional materials:
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
1"GALVANIZEDROOFINGNAILS....1/4Lb
For roong felt.
DRIP EDGE ...................................... 50 Feet #15 ROOFING FELT
To cover 134 Sq. Ft. of roof area.
REFERTOTHEBACKOFTHISMANUALANDTHEMANUFACTURER’SINSTRUCTIONSFOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................. 5 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK.................................................2Tubes
Use acrylic latex exterior caulk that is paintable.
1"GALVANIZEDROOFINGNAILS....3Lbs
For shingles.
PAINT FOR TRIM .......................... 2 Quarts
Use 100% acrylic latex exterior paint.
CAULK..............................................1Tube
For windows and door track
Use acrylic latex exterior caulk that is paintable.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! The included oor has been designed for general use. Depending on your specic use you may want to construct a
heavy duty oor frame by adding additional oor joists (shown below). Below is a list of additional materials (not included):
x3
x12
2 x 4 x 87" (5 x 10 x 221 cm) Treated Lumber
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
TOVALIDATEYOURWARRANTYYOUMUSTUSETHEFOLLOWING:
• This shed kit includes a complete wood oor system.
• This shed kit does not include ANY leveling materials.
•SeetheFLOORLEVELINGsectiononpage8forrecommendedmethodsandsuggestedmaterialstoproperlylevelyour
oor,asthiswillvarydependingonyourspecicsite.
Optional 12" (30,1 cm) spacing.
• Standard spacing is 16" (40,7 cm).

x2 2 x 4 x 86-1/8" (5,1 x 10,2 x 218,8 cm)
OHB
x2 2 x 4 x 82-1/2" (5,1 x 10,2 x 209,6 cm)
NES
x7 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm)
UM
x4 2 x 4 x 69" (5,1 x 10,2 x 175,3 cm)
PJ
x2 2 x 4 x 70-1/2" (5,1 x 10,2 x 179,1 cm)
AYA
x4 2 x 4 x 72-1/2" (5,1 x 10,2 x 184,2 cm)
PTA
x2 2 x 4 x 78-1/16" (5,1 x 10,2 x 198,3 cm)
OFB
x2 1 x 3 x 31-15/16" (2,5 x 7,6 x 81,1 cm)
THB
x4 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
SP
x2 2 x 4 x 39" (5,1 x 10,2 x 99,1 cm)
MBB
x2 2 x 3 x 31-15/16" (5,1 x 7,6 x 81,1 cm)
RMA
x5 19/32" x 2-1/2" x 9" (1,5 x 6,3 x 22,9 cm)
EY
x2 2 x 4 x 86-15/16" (5,1 x 10,2 x 220,8 cm)
KTB
2 x 4 x 12-1/8" (5,1 x 10,2 x 30,8 cm)
x5 PPA
x11 2 x 3 x 10-7/16" (5,1 x 7,6 x 26,5 cm)
QVA
x2 1 x 3 x 72" (2,5 x 7,6 x 182,8 cm)
HJ
x11 2 x 4 x 92-3/16" (1,5 x 10,2 x 234,2 cm)
SDC
x2 19/32" x 3-1/2" x 45" (1,5 x 8,8 x 114,3 cm)
WQA
x4 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
x1 PT 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
x2 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)
TM
x1 3/8" x 1-1/2" x 9" (0,9 x 3,8 x 22,9 cm)
x2 19/32" x 2-1/2" x 58-3/4" (1,5 x 6,3 x 149,2 cm)
TTB
x1 3/8" x 2-11/16" x 12-1/4" (1,5 x 6,8 x 31,1 cm)
(Left / Green)
x1 3/8" x 2-11/16" x 12-1/4" (1,5 x 6,8 x 31,1 cm)
(Right / Red)
x1 2 x 3 x 59-1/4" (5,1 x 7,6 x 150,5 cm)
GKA
4
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
2 x 4 x 87" (5,1 x 10,2 x 220,9 cm)
x10
x2 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
x1 7/16 x 3-1/4 x 68-3/4" (1,1 x 8,3 x 174,6 cm) OSB
WOODSIZECONVERSIONCHART
Nominal Board Size Actual Size
1 x 4 .................3/4" x 3-1/2" (1,9 x 8,9 cm)
2 x 4 ..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)
2 x 3 ..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)
1 x 3 .................3/4" x 2-1/2" (3,8 x 6,3 cm)
PARTS IDENTIFICATION AND SIZES
RS RS
Part identication
letters are stamped on some parts.
Check these locations for
part stamp.
Treated lumber is stamped:
WALLS
PARTS LIST
INVENTORYYOURPARTSbeforeyoubegin.
We suggest sorting parts by the category they are listed in.
RAFTERS
TRIM FLOOR
3/4"
(1,9 cm)
x1 3/4 x 3 x 5"
(2,5 x 7,6 x 12,7 cm)
GAA

x1 19/32" x 3-1/2" x 61-1/16" (1,5 x 8,8 x 155,1 cm)
UDR
19/32" x 2-1/2 x 90-5/8" (1,5 x 6,3 x 230,2 cm)
x2 VAA
19/32" x 2-1/2" x 72-3/4" (1,5 x 6,3 x 184,8 cm)
x2 ZD
19/32" x 2-1/2" x 70-1/8" (1,5 x 6,3 x 178,1 cm)
x1 TKL
19/32" x 2-1/2" x 70-1/8" (1,5 x 6,3 x 178,1 cm)
x1 TKR
19/32" x 3-1/2 x 96" (1,5 x 8,8 x 243,8 cm)
x2 ZX
3/8" x 10-3/8" x 75-5/8" (1 x 26,3 x 192,1 cm)
x1
3/8" x 10-3/8" x 79-5/8" (1 x 26,3 x 202,2 cm)
x1
x2 OO 1-1/4" x 2-1/2" x 69" (3,8 x 6,3 x 175,2 cm)
x1 3/8" x 2" x 73-7/16" (0,9 x 5,1 x 186,5 cm)
x1 3/8" x 2" x 73-7/16" (0,9 x 5,1 x 186,5 cm)
x1 3/8" x 2" x 93-1/8" (0,9 x 5,1 x 236,5 cm)
x1 3/8" x 2" x 93-1/8" (0,9 x 5,1 x 236,5 cm)
x2 OY 2 x 3 x 72" (5,1 x 7,6 x 182,8 cm)
x2 3/8" x 5-1/4" x 94-7/16" (1 x 13,3 x 242,5 cm)
x2 3/8" x 2" x 73-5/16" (0,9 x 5,1 x 186,2 cm)
x1 19/32" x 3-1/2" x 60-1/2" (1,5 x 8,8 x 153,7 cm)
WAB
x2 19/32" x 5-1/2" x 70-1/4" (1,5 x 14 x 178,4 cm)
CMB
x1 19/32" x 3-1/2" x 59-1/4" (1,5 x 8,8 x 150,4 cm)
HBA
x1 19/32" x 3-1/2" x 61-1/16" (1,5 x 8,8 x 155,1 cm)
UDL
x2 19/32 x 2-1/2 x 67-3/4" (1,5 x 6,3 x 172,1 cm)
TJB
5
NOTE: Panel parts are not stamped.
Floorpanelsare5/8"(1,6cm)thick.Roofpanelsare7/16"(1,1cm)thick.
7/16" x 11-7/8" x 96"
(1,1 x 30,2 x 243,8 cm)
x1
7/16" x 10-11/16" x 96"
(1,1 x 27,1 x 243,8 cm)
x1
7/16" x 10-11/16" x 31-7/8"
(1,1 x 27,1 x 81 cm)
x1
7/16" x 10-11/16" x28"
(1,1 x 27,1 x 71,1 cm)
x1
7/16" x 48" x 96"
(1,1 x 121,9 x 243,8 cm)
x3
5/8" x 42" x 96"
(1,5 x 106,6 x 243,8 cm)
5/8" x 48" x 90"
(1,5 x 106,6 x 228,6 cm)
x1
x1
5/8" x 48" x 96"
(1,5 x 121,9 x 243,8 cm)
x1
SOFFIT
PARTS LIST continued...
TRIM
PANEL PARTS LIST
ROOF PANELS
FLOOR

WALL PANEL & DOORS PARTS LIST
x4 BOXES
x4 BOXES
NAIL BOXES
FASTENER / HARDWARE BAG
x1
3/8" x 48" x 96"
(1 x 121,9x 243,8 cm)
x1
3/8" x 48" x 96"
(1 x 121,9x 243,8 cm)
x3
3/8" x 48 x 76"
(1 x 113,3 x 193 cm)
x1
3/8" x 48" x 84"
(1 x 122 x 213,4 cm)
x1
3/8" x 42" x 96"
(1 x 106,7 x 243,8 cm)
x1
3/8" x 42" x 96"
(1 x 106,7 x 243,8 cm)
x1
3/8" x 48" x 84"
(1 x 122 x 213,4 cm)
x1
3/8" x 5-1/2" x 48"
(1 x 14 x 121,9 cm)
x1
3/8" x 10-7/16" x 48"
(1 x 26,5 x 121,9 cm)
x2
DOORS
6
x265 2" (5,1 cm)
3" (7,6 cm)
x100
x52
x80
x48
3/4" (1,9 cm)
2" (5,0 cm)
3" (7,6 cm)
2" (5,1 cm)
x265 1-1/2" (3,8 cm)
NOTE:
If you are using a nail gun, nails may
be used where screws are shown for
quicker assembly.
Length of nail must match screw length.
#8 x 3/4" (1,9 cm)

7
HARDWARE / WINDOWS / Misc.
DOOR HARDWARE
x2
8 x 16"
(20,3 x 35,6 cm)
1/2" (1,2 cm)
x12
x1 64" Metal Threshold Bagged separately / special coating
3/4" (1,9 cm) x11
x4
Window
x11 H 2.5
Tie Plate
x2 x1
x6
x2
x2
x2
36" (91,4 cm) Door Brush
x2
36" (91,4 cm) Door Brush Channel
x2
69-3/4" (177,2 cm) Door Brush
x2
69-3/4" (177,2 cm) Door Brush Channel
x4
2" (5,1 cm)
x4
x16
1" (2,5 cm)
x8
5/16" x 2" Hex
Lag Screw
x1 Door
Stop
x4
#8 3/4" (1,9 cm)
x1
Spring
Bolt
x4
1-1/4" (3,2 cm)
Metal Rain Channel
x2
1" x 1" x 36" (2,5 x 2,5 x 91,4 cm)
x8
3/4" (1,9 cm)
x6
#12 2" (5,1 cm)
x1
Weatherstrip Roll
1-1/2" (3,8 cm)

8
DOOR
FLOOR LEVELING OPTIONS
There are multiple ways to level your oor frame. Our recommended leveling method is shown below.
Leveling materials are not included in this kit.
PREFERRED METHOD - 4x4 TREATED RUNNERS
Measurements to
center of 4x4's.
• 3" Screws angled into 4x4.
• (2) at each point frame
•and 4x4 touch.
• Level under 4x4 runners only.
• Locate leveling material 12" from ends of runners and no more than 48" apart.
• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use
shingles in direct contact with ground.
• For best results and aiding in water drainage use gravel under each concrete block.
LEVELINGMETHODS
• If you are building your shed on a concrete foundation see the following page.
CONCRETE
MATERIAL REQUIRED
x2 4 x 4 x 12' (10 x 10 x 365,8 cm)Treated Lumber
Fasteners for Frame to 4x4.
(3" Screws shown as one option.) Minimum (40) 3" screws / exterior grade.
Use only wood treated for ground contact and fasteners approved for use with treated wood.
Always support frame seams.
Leveling higher than 16" not recommended.
LEVELINGMATERIALS
Gravel
2x4 Treated Lumber
Solid Masonry Blocks in 1", 2", 4" or 8" thickness
Asphalt Shingles
8" Block
4" Block
Gravel
Gravel
Do not exceed 16".
4x4 Runner
Shingle
Shingle
Maximum between leveling
material locations.
48"
12"
2x4 Treated Lumber
2" Block
Level
12"
12"
(30,5 cm)
12"
(30,5 cm)

9
CONCRETE FOUNDATION
Your kit contains all materials to construct a wooden oor. If you choose to install your kit
on a concrete slab refer to the diagram below.
• A treated 2 x 4 (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete.
Hint:Usetreatedlumberinyourkitorpurchasefulllengthtreatedlumber.
• Use a high quality exterior grade caulk beneath all sill plates.
• Fasten 2 x 4 (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fastenersnotincluded).
• Check local code for concrete foundation requirements.
NOTES
Allow new concrete slabs to cure for at least seven (7) days.
2 x 4 x 12'-0" (5,1 x 10,2 x 365,8 cm)
2 x 4 x 8'-0" (5,1 x 10,2 x 229,6 cm)
Caulk
Requires:
x2
x2
x1
MUST be treated lumber.
MUST be treated lumber.
144"(365,8cm)
144"x90"(365,8x228,6cm) 83"(210,9cm)
12'x7'-6"(365,8x228,6cm) 90"(228,6cm)
AActual Size B CBuilding Size
A
B
C
4"
(10,2 cm)
3-1/2"
(8,9 cm)
DOOR
Treated Sill Plate
Caulkbetweensill
plate and concrete.

10
x10
x2
3" (7,6 cm)
x44
2 x 4 x 87" (5,1 x 10,2 x 221 cm)
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
PARTS REQUIRED:
Center
onmarks
DOOR
FLOOR FRAME
Look for
Stamp
TREATED
HINT:
For easier nailing
stand on frame.
1
Secure using two 3" nails at each mark.
Orient parts as shown on at surface. Measure and mark.
BEGIN
Your oor frame is now assembled. Proceed to level and square frame.
FINISH
FlushFlush
FlushFlush
TOENAILING
48"
(121,9 cm)
48"
(121,9 cm)
32"
(81,3 cm)
16"
(40,6 cm)
48"
(121,9 cm)
64"
(162,6 cm)
80"
(203,2 cm)
90"
(228,6 cm)
87"
(221 cm)
96"
(243,8 cm)
112"
(284,5 cm)
128"
(325,1 cm)
144"
(365,8 cm)
96"
(243,8 cm)

11
DOOR
First, secure
at ends using
one fastener.
Second, secure
at ends using
one fastener.
169-13/16"
(431,3 cm)
169-13/16"
(431,3 cm)
Fig. A
FINISH
LEVEL AND SQUARE FLOOR FRAME
Before attaching oor decking, it is important to level and square the oor frame.
A level and square oor frame is required to correctly construct your shed.
BEGIN
2
3
4
1
Use level and check the frame is level before applying oor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the
same, the frame is square. The diagonal measurement will be approximately 169-13/16" (431,3 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at
ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners using one
fastener at ends of each runner making sure the frame remains square (Fig.A).
Once the oor frame is level and square fasten the frame to the 4x4 runners at each point the frame
contacts the 4x4 runners.
See page 8 for the preferred oor leveling method.

12
48"
(121,9 cm)
144"
(365,8 cm)
6"
(15,2 cm)
12"
(30,5 cm)
Move to the opposite side. Using the long edge of the panel as a lever, move the
panel side-to-side until the top corner is ush to the oor frame (Fig.B).
Secure panel using two 2" nails in the corners.
2
BEGIN
1
3Continue attaching the panel using 2" nails 6" apart on
edges and 12" apart inside panel. Fig. A
PARTS REQUIRED:
x1
x53
5/8" x 48" x 96"
(1,6 x 121,9 x 243,8 cm)
Grid lines up
Seam
2" (5,1 cm)
Flush
Flush
(2)Nails
FLOOR PANELS
3/4"
(1,9 cm)
Fig. B
Flush
3/4"
(1,9 cm)
Attach the 5/8"x48"x96" panel with the rough side up (painted-grid lines side) with the
48" edge and corner ush to the oor frame (FigA). Secure panel with two 2" nails in the
corners.
DOOR
(2)Nails

13
42"
(106,7 cm)
90"
(228,6 cm)
144"
(365,8 cm)
6"
(15,2 cm)
48"
(122 cm)
12"
(30,5 cm)
PARTS REQUIRED:
FINISH
Your oor panels are now installed.
Continue installing panels using 2" nails 6" apart on edges, and 12" apart inside panels.
4
x1 x1
x123
5/8" x 48" x 90"
(1,6 x 60,6 x 122 cm)
5/8" x 42" x 96"
(1,6 x 106,7 x 243,8 cm)
Grid lines up
2" (5,1 cm)
FLOOR PANELS
Flush
Flush
DOOR
Flush
Flush

14
DOOR
BackWall
FrontWall
Checktheoorframeislevelafterinstallingoorpanels.
Re-level if needed.
HINT:
IMPORTANT!
•Theoorshouldbeusedasastableworksurfaceforwallconstruction.
• Organizeyourassemblyprocedureduringthebuildprocess
to avoid over-handling of the walls.
DOOR

BACK WALL FRAME
PARTS REQUIRED:
HINT:
For easier nailing
stand on frame.
x2 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
x7 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm)
UM
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
SP
x32
15
3" (7,6 cm)
BEGIN
1
Use two 3" nails at each mark and four 3" nails at seams
Orient parts on edge on oor. Measure and mark.
2
UM x7
TP
SP
SP
TP
144"
(365,8 cm) 120"
(304,8 cm)
68"
(172,7 cm) 1-1/2"
(3,8 cm)
96"
(243,8 cm)
96"
(243,8 cm)
48"
(122 cm)
72"
(182,9 cm)
48"
(122 cm)
24"
(61 cm)
96"
(243,8 cm)
TOENAILING
3"(7,6cm)
Nails

16
BACK WALL PANELS
48" x 76"
(121,9 x 193 cm)
PARTS REQUIRED:
x1
x47 2" (5,1 cm)
Place 48" x 76" panel onto wall frame with primed side up as shown.
Use the gauge block to mark the 3/4" measurement on the wall stud.
Secure panel using 2" nails 6" apart on edges and 12" apart inside panel.
3
3/4"GAUGE
BLOCK
GAA
Primed
side up
Forsquarenessmaintain3/4"
measurement along panel edges.
BEGIN HERE
3/4"GAUGE
BLOCK
•Ensuretopofpanelisoverhangingthetopofframeby4".
6"
(15,2 cm)
4"
(10,2cm)
3/4"
(1,9 cm)
3/4"
(1,9 cm)
48"
(121,9 cm)
12"
(30,5 cm)

17
48"
(121,9 cm)
3/4"
(1,9 cm)
4"
(10,2 cm) 3/4"
(1,9 cm)
12"
(30,5 cm)
6"
(15,2 cm)
48"
(121,9 cm)
4"
(10,2 cm)
12"
(30,5 cm)
6"
(15,2 cm)
Place center and end 48" x 76" panels
on frame as shown (Fig.A,Fig.B).
Nail using 2" nails 6" apart on edges
and 12" apart inside panel.
4
You have nished building your back wall.
FINISH
48" x 76"
(121,9 x 193 cm)
x2
BACK WALL PANELS
PARTS REQUIRED: x94 2" (5,1 cm)
Carefully ip the back wall over.
3/4"GAUGE
BLOCK
GAA
3/4"GAUGE
BLOCK
Flush
Fig. A
Fig. B
Primed
side up
Primed
side up
Forsquarenessmaintain3/4"
measurement along panel edges.
Forsquarenessmaintainush
along panel edges.

18
PARTS REQUIRED:
3" (7,6 cm)
x16
FRONT WALL - DOOR HEADER
1
BEGIN
1
PJ
PJ Center OSB
Build header assembly as shown using 3" nails.
Flush
Flush 3-1/4"x68-3/4"
OSB
x1
7/16" x 3-1/4" x 68-3/4" (1,1 x 8,3 x 174,6 cm) OSB
x2
2 x 4 x 69" (5,1 x 10,2 x 175,3 cm)
PJ
You have assembled your door header.
FINISH
Table of contents