UH-02-Aug16-ENG P 9/ 21
3.3.
I
NSTALLATION AND
D
ISASSEMBLY
I
NSTRUCTIONS
M
ODULE
A
-
S
INGLE
N
OZZLE
T
YPE
GPS Open Nozzle
SAS Valve Nozzle
TSV Valve Nozzle
Installation
1. Make the dimensional housing verification with special care for the tight tolerance fitting zones and system
seating dimensions according to the CAD file information. In case of doubt or unclear information contact
YUDO.
2. Make sure the housing is in proper condition to receive the hot runner and correct position to proceed with
assembling without risks for people and equipment.
3. Place the nozzle into its housing. If there are sliding bushes they must be placed in its position in the mold
before the nozzle. Attention to the position pegs, when applicable.
4. Move aside of dangerous areas all electrical cables to avoid crushing them.
5. After positioning the electrical cables check if they are all in good condition.
6. Identify properly and clearly all the wires for proper identification at any time.
7. Follow the system electrical areas numbering according to the design, also visible on the ID Card.
8. Assemble the centering ring. Tighten in a balanced way. The centering ring has to adjust the system as
shown in the draft of the injection system. Be careful not to pinch the wires.
9. Connect the wires taking into account:
- Wires should have only sufficient and required length that allows easy opening of the electrical box cover
and checking connections.
- Wires should consider connecting terminals appropriate to your connection plug. The non-use or partial use
of terminals can lead to system malfunction.
- Wires cannot be added without YUDO technical opinion.
- Plugs and their electrical box must be placed in order to be protected from stroke or other accidents that may
damage the set.
- The plugs must always be placed in appropriate boxes. The use of inappropriate boxes are the cause of
many failures and system malfunctions and its injection.
10. After finishing the assembly, check if there is no undue electrical current passage and if continuity is doing
in the right poles.
11. Normally thermocouples give electrical current passage to the mold, but not resistances.
12. Check the heating system: Heat the system at 150 ° C, stabilize the temperature of all electrical heating
zones and keep heating for 10 minutes.
- Always use soft start (slow heating) up to the temperature of 100 ° C.
13. Check the correct Valve Pins movement by activating the respective cylinders (Only for valve gate
systems).For air or oil supply for piston operation, heat resistant pipes shall be mounted, resisting up to
180ºC. Consider piping specifications according to maximum operating pressure either pneumatic or
hydraulic. Consider safety factor to avoid rupture problems.
14. Let the system cool down.
15. Keep the system in a place free of moisture, metal chips or under possible physical shocks. Other care
considered suitable will be important to keep the system in good working order.
If any system anomaly is detected, it should be reported to YUDO.