
Portable Drying Unit (PDU)
Quick Start Guide
WARMING PDU
1. Ensure that the Portable Drying Unit (PDU) batteries are fully charged (see “Charging the Battery”
section below for details on charging the batteries).
2. Connect the battery to the PDU by opening the compartment on the front right hand side of the
PDU and connecting the male and female white clips. Place the connected battery into the battery
storage compartment.
3. Push the ‘Power’ switch on the front interface to the ‘Hot’ position. This will turn on the red LED
light adjacent to the ‘Hot’ label. The PDU is now heating up and will require approximately 30
minutes to reach its set temperature. The current internal temperature is shown on the thermostat
on the front interface. Ensure that the lid is closed to minimise the time required to reach the set
temperature. (Note: The PDU will heat to a temperature that is pre-set by Ziltek. If this temperature
requires changing, consult the ‘Portable Drying Unit Operating Instructions’ in the RemScan Oper-
ational Manual for detailted instructions on changing the set temperature).
4. Once the PDU has reached its set temperature, sample drying may be commenced.
SAMPLE PREPARATION
1. Labeleachsampleslidewithamarkerpenforeasyidenticationofindividualsamples.
2. Place wet soil samples onto sample slides, preferably designating one sample per slide.
i. Forsandyandloamysoiltypes,spreadthesampleevenlyintotheveslidewellsandatten
thesurfaceswithaspatulatoremoveexcesssoilpresentuntilthesoillevelsitsslightly
abovethewelllevel.
ii. For clay soil types, samples can be spread on the back of the sample slides using a spatula
untilalloftheknurlingiscoveredtoincreasethesurfaceareaandincreasedryingeciency.
SAMPLE DRYING
1. PlacetheloadedsampleslidesontotheprovideddryingrackandplacetherackintothePDU.
2. Close the lid and allow the samples to dry.
3. AvoidopeningthePDUduringthedryingprocesstopreventheatlossandthereforeminimise
drying time.
4. After 30-60 minutes (depending on sample wetness), the drying rack containing the dried samples
canberemovedfromthePDU.
SCANNING SAMPLES
1. Forsampleslidescontainingvelledwells,tampthesurfacesofeachwellatusingthetamper
providedintheRemScankit.
2. Scan each well with RemScan using the instructions in the ‘RemScan Quick Start Guide’. Each
wellcanbeusedasasub-sampleforatotalofveperuniquesample.
3. For clay samples loaded onto the back of the sample slides, simply tamp the soil surface and scan
vetimesatdierentlocationsontheslidewithRemScan. Z051-03 01/20